Cal. Water Code § 10910 (2026)

Edition and currency
leginfo export of Sept. 26, 2026 (applied Oct. 1, 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTleginfo export of Sept. 26, 2026 (applied Oct. 1, 2026) cited 2007–2026 16citing cases
At a glance

Courts have cited this section in 16 opinions since 2007, 3 of them in the last five years.

(a)Any city or county that determines that a project, as defined in Section 10912, is subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) under Section 21080 of the Public Resources Code shall comply with this part.

(b)The city or county, at the time that it determines whether an environmental impact report, a negative declaration, or a mitigated negative declaration is required for any project subject to the California Environmental Quality Act pursuant to Section 21080.1 of the Public Resources Code, shall identify any water system whose service area includes the project site and any water system adjacent to the project site that is, or may become as a result of supplying water to the project identified pursuant to this subdivision, a public water system, as defined in Section 10912, that may supply water for the project. If the city or county is not able to identify any public water system that may supply water for the project, the city or county shall prepare the water assessment required by this part after consulting with any entity serving domestic water supplies whose service area includes the project site, the local agency formation commission, and any public water system adjacent to the project site.

(c)(1)The city or county, at the time it makes the determination required under Section 21080.1 of the Public Resources Code, shall request each public water system identified pursuant to subdivision (b) to determine whether the projected water demand associated with a proposed project was included as part of the most recently adopted urban water management plan adopted pursuant to Part 2.6 (commencing with Section 10610).

(2)If the projected water demand associated with the proposed project was accounted for in the most recently adopted urban water management plan, the public water system may incorporate the requested information from the urban water management plan in preparing the elements of the assessment required to comply with subdivisions (d), (e), (f), and (g).

(3)If the projected water demand associated with the proposed project was not accounted for in the most recently adopted urban water management plan, or the public water system has no urban water management plan, the water supply assessment for the project shall include a discussion with regard to whether the public water system’s total projected water supplies available during normal, single dry, and multiple dry water years during a 20-year projection will meet the projected water demand associated with the proposed project, in addition to the public water system’s existing and planned future uses, including agricultural and manufacturing uses.

(4)If the city or county is required to comply with this part pursuant to subdivision (b), the water supply assessment for the project shall include a discussion with regard to whether the total projected water supplies, determined to be available by the city or county for the project during normal, single dry, and multiple dry water years during a 20-year projection, will meet the projected water demand associated with the proposed project, in addition to existing and planned future uses, including agricultural and manufacturing uses.

(d)(1)The assessment required by this section shall include an identification of any existing water supply entitlements, water rights, or water service contracts relevant to the identified water supply for the proposed project, and a description of the quantities of water received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts.

(2)An identification of existing water supply entitlements, water rights, or water service contracts held by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall be demonstrated by providing information related to all of the following:

(A)Written contracts or other proof of entitlement to an identified water supply.

(B)Copies of a capital outlay program for financing the delivery of a water supply that has been adopted by the public water system.

(C)Federal, state, and local permits for construction of necessary infrastructure associated with delivering the water supply.

(D)Any necessary regulatory approvals that are required in order to be able to convey or deliver the water supply.

(e)If no water has been received in prior years by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), under the existing water supply entitlements, water rights, or water service contracts, the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), shall also include in its water supply assessment pursuant to subdivision (c), an identification of the other public water systems or water service contractholders that receive a water supply or have existing water supply entitlements, water rights, or water service contracts, to the same source of water as the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has identified as a source of water supply within its water supply assessments.

(f)If a water supply for a proposed project includes groundwater, the following additional information shall be included in the water supply assessment:

(1)A review of any information contained in the urban water management plan relevant to the identified water supply for the proposed project.

(2)(A)A description of any groundwater basin or basins from which the proposed project will be supplied.

(B)For those basins for which a court or the board has adjudicated the rights to pump groundwater, a copy of the order or decree adopted by the court or the board and a description of the amount of groundwater the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has the legal right to pump under the order or decree.

(C)For a basin that has not been adjudicated that is a basin designated as high- or medium-priority pursuant to Section 10722.4, information regarding the following:

(i)Whether the department has identified the basin as being subject to critical conditions of overdraft pursuant to Section 12924.

(ii)If a groundwater sustainability agency has adopted a groundwater sustainability plan or has an approved alternative, a copy of that alternative or plan.

(D)For a basin that has not been adjudicated that is a basin designated as low- or very low priority pursuant to Section 10722.4, information as to whether the department has identified the basin or basins as overdrafted or has projected that the basin will become overdrafted if present management conditions continue, in the most current bulletin of the department that characterizes the condition of the groundwater basin, and a detailed description by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), of the efforts being undertaken in the basin or basins to eliminate the long-term overdraft condition.

(3)A detailed description and analysis of the amount and location of groundwater pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), for the past five years from any groundwater basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.

(4)A detailed description and analysis of the amount and location of groundwater that is projected to be pumped by the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), from any basin from which the proposed project will be supplied. The description and analysis shall be based on information that is reasonably available, including, but not limited to, historic use records.

(5)An analysis of the sufficiency of the groundwater from the basin or basins from which the proposed project will be supplied to meet the projected water demand associated with the proposed project. A water supply assessment shall not be required to include the information required by this paragraph if the public water system determines, as part of the review required by paragraph (1), that the sufficiency of groundwater necessary to meet the initial and projected water demand associated with the project was addressed in the description and analysis required by subparagraph (D) of paragraph (4) of subdivision (b) of Section 10631.

(g)(1)Subject to paragraph (2), the governing body of each public water system shall submit the assessment to the city or county not later than 90 days from the date on which the request was received. The governing body of each public water system, or the city or county if either is required to comply with this act pursuant to subdivision (b), shall approve the assessment prepared pursuant to this section at a regular or special meeting.

(2)Prior to the expiration of the 90-day period, if the public water system intends to request an extension of time to prepare and adopt the assessment, the public water system shall meet with the city or county to request an extension of time, which shall not exceed 30 days, to prepare and adopt the assessment.

(3)If the public water system fails to request an extension of time, or fails to submit the assessment notwithstanding the extension of time granted pursuant to paragraph (2), the city or county may seek a writ of mandamus to compel the governing body of the public water system to comply with the requirements of this part relating to the submission of the water supply assessment.

(h)Notwithstanding any other provision of this part, if a project has been the subject of a water supply assessment that complies with the requirements of this part, no additional water supply assessment shall be required for subsequent projects that were part of a larger project for which a water supply assessment was completed and that has complied with the requirements of this part and for which the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), has concluded that its water supplies are sufficient to meet the projected water demand associated with the proposed project, in addition to the existing and planned future uses, including, but not limited to, agricultural and industrial uses, unless one or more of the following changes occurs:

(1)Changes in the project that result in a substantial increase in water demand for the project.

(2)Changes in the circumstances or conditions substantially affecting the ability of the public water system, or the city or county if either is required to comply with this part pursuant to subdivision (b), to provide a sufficient supply of water for the project.

(3)Significant new information becomes available that was not known and could not have been known at the time when the assessment was prepared.

(i)For the purposes of this section, hauled water is not considered as a source of water.

The 16 cases that cite Cal. Water Code § 10910 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 10910 16×cited by 333 cases
Where it cites § 10910
“) Water Code sections 10910 to 10912, enacted in 1995 but substantially amended in 2001, apply more broadly to any large land use project (not only residential developments) and to approval of any such project subject to CEQA (not only to subdivision map approvals).”
The case’s holding
An environmental impact report must analyze the impacts of providing water to the entire proposed project and include a reasoned analysis of the likelihood of future water availability.
Later courts cite it for
“in reviewing an agency's compliance with ceqa in the course of its legislative or quasi-legislative actions, the courts' inquiry 'shall extend only to whether there was a prejudicial abuse of discretion.” · 29 citing courts
2
GREENCalifornia Water Impact Network v. Newhall Cnty. Water Dist., 161 Cal. App. 4th 1464 (Ct. App. 2008).
cites § 10910 15×cited by 39 cases
Where it cites § 10910
“, the lead agency) preparing an EIR for a qualifying project was required to request each potential water supplier for a WSA. The assessment was based on the supplier’s most recent urban water management plan and would indicate whether the supplier could meet the water supply…”
The case’s holding
A water supply assessment is an informational document rather than a final agency decision subject to direct mandamus review.
Later courts cite it for
“the principal purposes of exhaustion requirements include avoidance of premature interruption of administrative processes; allowing an agency to develop the necessary factual background of the case; letting the agency apply its expertise and exercise its statutory discretion; and administrative efficiency and judicial economy.” · 2 citing courts
3
GREENClover Valley Found. v. City of Rocklin, 197 Cal. App. 4th 200 (Ct. App. 2011).
cites § 10910 6×cited by 52 cases
Where it cites § 10910
“) In addition, “Water Code sections 10910 to 10912, enacted in 1995 but substantially amended in 2001, apply more broadly to any large land use project (not only residential developments) and to approval of any such project subject to CEQA (not only to subdivision map approvals).”
The case’s holding
A lead agency is not required to recirculate a draft environmental impact report unless the document contains significant new information requiring additional public review.
Later courts cite it for
“an eir to explain why certain mitigation measures are infeasible” · 2 citing courts
4
GREENCitizens for Responsible Equitable Env't Dev. v. City of San Diego, 196 Cal. App. 4th 515 (Ct. App. 2011).
cites § 10910 8×cited by 28 cases
Where it cites § 10910
“” (Vineyard, supra, 40 Cal.4th at p. 427.) n WSA Procedure Preliminarily, we dispose of CREED’S contention we must reverse the judgment because the City did not approve the WSA in accordance with the procedure set forth in Water Code section 10910, subdivision (g)(1).”
The case’s holding
A CEQA challenge is barred unless its specific grounds were presented to the agency during the public comment period or before the close of the hearing; generalized objections do not suffice.
Later courts cite it for
“a ceqa challenge is not preserved 'unless the alleged grounds for noncompliance with ceqa were presented to the public agency orally or in writing by any person during the public comment period provided by this division or prior to the close of the public hearing . . . .' 'exhaustion of administrative remedies is a jurisdictional prerequisite to maintenance of a ceqa action.” · 4 citing courts
5
GREENCherry Valley Pass Acres & Neighbors v. City of Beaumont, 190 Cal. App. 4th 316 (Ct. App. 2010).
cites § 10910 5×cited by 40 cases
Where it cites § 10910
“The Judgment acknowledged that this provision was intended to ensure that the overlying party would receive credit towards satisfying “the water availability assessment provisions” of Government Code section 66473.”
The case’s holding
The environmental baseline for determining significance of impacts must reflect the actual physical conditions existing on the ground at the time environmental review commences.
Later courts cite it for
“conditions that were permissible pursuant to an existing plan or regulation but that were not being employed or that did not exist 'on the ground' at the time environmental review commenced.” · 2 citing courts
6
GREENCtr. for Biological Diversity v. Cnty. of San Bernardino, 185 Cal. App. 4th 866 (Ct. App. 2010).
cites § 10910 3×cited by 60 cases
Where it cites § 10910
“As to the latter issue, the court determined the proposed project was subject to Water Code section 10910, which requires either the public water system that may provide water for the project, or the city or county when no public water system is identified, to prepare a water…”
The case’s holding
An environmental impact report is inadequate if it lacks substantial evidence to support the rejection of a reasonable alternative or fails to include a required water supply assessment.
Later courts cite it for
“it is not our job to comb through the record in search of grounds to upset the judgment.” · 3 citing courts
7
GREENPreserve Wild Santee v. City of Santee, 210 Cal. App. 4th 260 (Ct. App. 2012).
cites § 10910 2×cited by 69 cases
Where it cites § 10910
“A Water Code sections 10910 to 10912 “require the city or county considering a project to obtain, at the outset of the CEQA process, a water supply ‘assessment’ from the applicable public water system.”
The case’s holding
A trial court relies on equitable principles to determine whether to issue a limited writ or decertify an environmental impact report.
Later courts cite it for
“in deciding which mandates to include in its order, a trial court relies on equitable principles.” · 2 citing courts
8
GREENInland Oversight Comm. v. City of San Bernardino, 27 Cal. App. 5th 771 (Ct. App. 2018).
cites § 10910 1×cited by 9 cases
Where it cites § 10910
“They further allege that the modified project should not have been approved without conducting a water supply assessment pursuant to Water Code section 10910 et seq.”
Later courts cite it for
“under california law, a judgment 'is not final for purposes of res judicata during the pendency of and until the resolution of the appeal.” · 2 citing courts
9
NO FLAGCity of Vallejo v. City of Am. Canyon, 117 Cal. App. 5th 1112 (Ct. App. 2026).
cites § 10910 10×cited by 0 cases
Where it cites § 10910
“Vallejo also argues the EIR fails to comply with Water Code sections 10910 and 10911. We disagree and affirm.”
10
YELLOWMadera Oversight Coalition, Inc. v. Cnty. of Madera, 199 Cal. App. 4th 48 (Ct. App. 2011).
cites § 10910 3×cited by 52 cases
Caution, overruled only to a limited extent. Neighbors for Smart Rail v. Exposition Metro Line Construction Authority (2013) disapproved it only in these words: “Sunnyvale West Neighborhood Assn. v. City of Sunnyvale City Council, supra, 190 Cal.App.4th 1351, and Madera Oversight Coalition, Inc. v. County of Madera, supra, 199 Cal.App.4th 48, are disapproved insofar as they hold an agency may never employ predicted future conditions as the sole baseline for analysis of a project‟s environmental impacts.” What it rejected: CEQA: agency may never use predicted future conditions as the sole baseline. Read the overruling opinion before relying on this case: check that the point you cite it for is not the one that changed.
Where it cites § 10910
“” 30 Water Code section 10910 requires a city or county considering those projects to obtain a written assessment of water supply and demand and specifies the contents of the assessment.”
The case’s holding
The trial court determines the scope of the administrative record under the environmental quality act rather than the lead agency.
Later courts cite it for
“care must be taken to distinguish the administrative record (i.e., the 'record of proceedings') from the record on appeal (see ... rule 8.120 et seq.).” · 3 citing courts
11
NO FLAGCity of Selma v. Fresno Cnty. Local Agency etc., No. F072147 (Cal. Ct. App. July 14, 2016).
cites § 10910 5×cited by 0 cases
Where it cites § 10910
“Instead, it contends Water Code section 10910, subdivision (b) actually uses CEQA’s definition of a “project” rather than the Water Code’s definition.”
12
NO FLAGCity of Selma v. Fresno Cnty. Local Agency etc., No. F072147M (Cal. Ct. App. Aug. 11, 2016).
cites § 10910 5×cited by 0 cases
Where it cites § 10910
“Instead, it contends Water Code section 10910, subdivision (b) actually uses CEQA‟s definition of a “project” rather than the Water Code‟s definition.”
13
NO FLAGComite Civico Del Valle v. Cnty. of Imperial, No. D085747 (Cal. Ct. App. Aug. 11, 2026).
cites § 10910 3×cited by 0 casesunpublished
Where it cites § 10910
“610, which amended Water Code section 10910 et seq.”
14
NO FLAGComite Civico del Valle v. Cnty. of Imperial, No. D085747 (Cal. Ct. App. Sept. 2, 2026).
cites § 10910 3×cited by 0 cases
Where it cites § 10910
“610, which amended Water Code section 10910 et seq.”
15
GREENInland Oversight Comm. v. City of San Bernardino, No. E064836 (Cal. Ct. App. Sept. 27, 2018).
cites § 10910 1×cited by 0 cases
Where it cites § 10910
“They further allege that the modified project should not have been approved without conducting a water supply assessment pursuant to Water Code section 10910 et seq.”
16
NO FLAGSierra Club v. Imperial Cnty., No. D062545 (Cal. Ct. App. Dec. 16, 2013).
cites § 10910 1×cited by 0 casesunpublished
Where it cites § 10910
“In view of the extensive public comments concerning the increased groundwater pumping and impacts on water levels and quality in the Basin, County retained another company, Todd Engineers, which conducted an independent review of groundwater issues for the project (the Todd…”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200720162026

One bar per year. Tallest: 3 cases in 2011. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Cal. Ct. App.15Cal.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.