C.F.R. homeSearch C.F.R.
C.F.R.Title 10Chapter I—Nuclear Regulatory CommissionPart 72—Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, And Reactor-Related Greater Than Class C WasteSubpart K—General License for Storage of Spent Fuel at Power Reactor Sites

10 C.F.R. § 72.212 (2026)

Conditions of general license issued under § 72.210

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2000–2020 7citing cases
At a glance

Courts have cited this section in 7 opinions since 2000.

(a)(1) The general license is limited to that spent fuel which the general licensee is authorized to possess at the site under the specific license for the site.

(2) This general license is limited to storage of spent fuel in casks approved under the provisions of this part.

(3) The general license for the storage of spent fuel in each cask fabricated under a Certificate of Compliance shall commence upon the date that the particular cask is first used by the general licensee to store spent fuel, shall continue through any renewals of the Certificate of Compliance, unless otherwise specified in the Certificate of Compliance, and shall terminate when the cask's Certificate of Compliance expires. For any cask placed into service during the final renewal term of a Certificate of Compliance, or during the term of a Certificate of Compliance that was not renewed, the general license for that cask shall terminate after a storage period not to exceed the length of the term certified by the cask's Certificate of Compliance. Upon expiration of the general license, all casks subject to that general license must be removed from service.

(b) The general licensee must:

(1) Notify the Nuclear Regulatory Commission using instructions in § 72.4 at least 90 days before first storage of spent fuel under this general license. The notice may be in the form of a letter, but must contain the licensee's name, address, reactor license and docket numbers, and the name and means of contacting a person responsible for providing additional information concerning spent fuel under this general license. A copy of the submittal must be sent to the administrator of the appropriate Nuclear Regulatory Commission regional office listed in appendix D to part 20 of this chapter.

(2) Register use of each cask with the Nuclear Regulatory Commission no later than 30 days after using that cask to store spent fuel. This registration may be accomplished by submitting a letter using instructions in § 72.4 containing the following information: the licensee's name and address, the licensee's reactor license and docket numbers, the name and title of a person responsible for providing additional information concerning spent fuel storage under this general license, the cask certificate number, the CoC amendment number to which the cask conforms, unless loaded under the initial certificate, cask model number, and the cask identification number. A copy of each submittal must be sent to the administrator of the appropriate Nuclear Regulatory Commission regional office listed in appendix D to part 20 of this chapter.

(3) Ensure that each cask used by the general licensee conforms to the terms, conditions, and specifications of a CoC or an amended CoC listed in § 72.214.

(4) In applying the changes authorized by an amended CoC to a cask loaded under the initial CoC or an earlier amended CoC, register each such cask with the Nuclear Regulatory Commission no later than 30 days after applying the changes authorized by the amended CoC. This registration may be accomplished by submitting a letter using instructions in § 72.4 containing the following information: the licensee's name and address, the licensee's reactor license and docket numbers, the name and title of a person responsible for providing additional information concerning spent fuel storage under this general license, the cask certificate number, the CoC amendment number to which the cask conforms, cask model number, and the cask identification number. A copy of each submittal must be sent to the administrator of the appropriate Nuclear Regulatory Commission regional office listed in appendix D to part 20 of this chapter.

(5) Perform written evaluations, before use and before applying the changes authorized by an amended CoC to a cask loaded under the initial CoC or an earlier amended CoC, which establish that:

(i) The cask, once loaded with spent fuel or once the changes authorized by an amended CoC have been applied, will conform to the terms, conditions, and specifications of a CoC or an amended CoC listed in § 72.214;

(ii) Cask storage pads and areas have been designed to adequately support the static and dynamic loads of the stored casks, considering potential amplification of earthquakes through soil-structure interaction, and soil liquefaction potential or other soil instability due to vibratory ground motion; and

(iii) The requirements of § 72.104 have been met. A copy of this record shall be retained until spent fuel is no longer stored under the general license issued under § 72.210.

(6) Review the Safety Analysis Report referenced in the CoC or amended CoC and the related NRC Safety Evaluation Report, prior to use of the general license, to determine whether or not the reactor site parameters, including analyses of earthquake intensity and tornado missiles, are enveloped by the cask design bases considered in these reports. The results of this review must be documented in the evaluation made in paragraph (b)(5) of this section.

(7) Evaluate any changes to the written evaluations required by paragraphs (b)(5) and (b)(6) of this section using the requirements of § 72.48(c). A copy of this record shall be retained until spent fuel is no longer stored under the general license issued under § 72.210.

(8) Before use of the general license, determine whether activities related to storage of spent fuel under this general license involve a change in the facility Technical Specifications or require a license amendment for the facility pursuant to § 50.59(c) or § 53.1550 of this chapter. Results of this determination must be documented in the evaluations made in paragraph (b)(5) of this section.

(9) Protect the spent fuel against the design basis threat of radiological sabotage in accordance with the same provisions and requirements as are set forth in the licensee's physical security plan pursuant to § 73.55 of this chapter with the following additional conditions and exceptions:

(i) The physical security organization and program for the facility must be modified as necessary to assure that activities conducted under this general license do not decrease the effectiveness of the protection of vital equipment in accordance with § 73.55 of this chapter;

(ii) Storage of spent fuel must be within a protected area, in accordance with § 73.55(e) of this chapter, but need not be within a separate vital area. Existing protected areas may be expanded or new protected areas added for the purpose of storage of spent fuel in accordance with this general license;

(iii) For the purpose of this general license, personnel searches required by § 73.55(h) of this chapter before admission to a new protected area may be performed by physical pat-down searches of persons in lieu of firearms and explosives detection equipment;

(iv) The observational capability required by § 73.55(i)(3) of this chapter as applied to a new protected area may be provided by a guard or watchman on patrol in lieu of video surveillance technology;

(v) For the purpose of this general license, the licensee is exempt from requirements to interdict and neutralize threats in § 73.55 of this chapter; and

(vi) Each general licensee that receives and possesses power reactor spent fuel and other radioactive materials associated with spent fuel storage shall protect Safeguards Information against unauthorized disclosure in accordance with the requirements of § 73.21 and the requirements of § 73.22 or § 73.23 of this chapter, as applicable.

(10) Review the reactor emergency plan, quality assurance program, training program, and radiation protection program to determine if their effectiveness is decreased and, if so, prepare the necessary changes and seek and obtain the necessary approvals.

(11) Maintain a copy of the CoC and, for those casks to which the licensee has applied the changes of an amended CoC, the amended CoC, and the documents referenced in such Certificates, for each cask model used for storage of spent fuel, until use of the cask model is discontinued. The licensee shall comply with the terms, conditions, and specifications of the CoC and, for those casks to which the licensee has applied the changes of an amended CoC, the terms, conditions, and specifications of the amended CoC, including but not limited to, the requirements of any AMP put into effect as a condition of the NRC approval of a CoC renewal application in accordance with § 72.240.

(12) Accurately maintain the record provided by the CoC holder for each cask that shows, in addition to the information provided by the CoC holder, the following:

(i) The name and address of the CoC holder or lessor;

(ii) The listing of spent fuel stored in the cask; and

(iii) Any maintenance performed on the cask.

(13) Conduct activities related to storage of spent fuel under this general license only in accordance with written procedures.

(14) Make records and casks available to the Commission for inspection.

(c) The record described in paragraph (b)(12) of this section must include sufficient information to furnish documentary evidence that any testing and maintenance of the cask has been conducted under an NRC-approved quality assurance program.

(d) In the event that a cask is sold, leased, loaned, or otherwise transferred to another registered user, the record described in paragraph (b)(12) of this section must also be transferred to and must be accurately maintained by the new registered user. This record must be maintained by the current cask user during the period that the cask is used for storage of spent fuel and retained by the last user until decommissioning of the cask is complete.

(e) Fees for inspections related to spent fuel storage under this general license are those shown in § 170.31 of this chapter.

[55 FR 29191, July 18, 1990, as amended at 64 FR 53616, Oct. 4, 1999; 68 FR 54160, Sept. 16, 2003; 73 FR 63573, Oct. 24, 2008; 74 FR 13970, Mar. 27, 2009; 76 FR 8890, Feb. 16, 2011; 91 FR 15869, Mar. 30, 2026]
The 7 cases that cite 10 C.F.R. § 72.212 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSys. Fuels, Inc. v. United States, 120 Fed. Cl. 737 (Fed. Cl. 2015).
cites § 72.212 4×cited by 8 cases
Where it cites § 72.212
“■ Most importantly, a cask drop analysis embodied in a 10 C.F.R § 72.212 report (“§ 72.212 report”) for the VSC-24 cask system, 34 considered a fifty-foot drop and rupture of the VSC-24 cask.”
cites § 72.212 1×cited by 61 cases
Where it cites § 72.212
“Finally, under 10 C.F.R. § 72.212 (2007), the NRC has established conditions on the general licenses issued for spent storage facilities, such as the adoption of security measures.”
The case’s holding
The superior court reviews administrative appeals in an appellate capacity (noting that Superior Court sits in an appellate capacity when reviewing administrative appeal).
Later courts cite it for
“mere conclusory assertions regarding a claim, with no mention of relevant authority and minimal or no citations from the record, will not suffice” · 2 citing courts
3
GREENEntergy Nuclear Indian Point 2, LLC v. United States, 128 Fed. Cl. 526 (Fed. Cl. 2016).
cites § 72.212 2×cited by 5 cases
Where it cites § 72.212
“10 C.F.R. § 72.212 (b)(11). While every cask must be certified, the certification requirements vary by cask type.”
4
GREENWisconsin Elec. Power Co. v. United States, 90 Fed. Cl. 714 (Fed. Cl. 2009).
cites § 72.212 1×cited by 24 cases
Where it cites § 72.212
“After several contentious years, the PSC approved the project subject to WE’s filing a 10 C.F.R. § 72.212 report with the NRC. WE’s sixty-five page report dated December 1, 1995, included a summary of operational steps which hint at the complexity of cask loading.”
The case’s holding
A party may recover reasonable mitigation costs incurred to limit damages from a partial breach, where those costs were reasonably foreseeable, substantially caused by the breach, and proven with reasonable certainty.
Later courts cite it for
“would have occurred in 1999 even if doe had begun performance in 1998.” · 5 citing courts
5
GREENPub. Watchdogs v. S. California Edison Co., 984 F.3d 744 (9th Cir. 2020).
cites § 72.212 1×cited by 7 cases
Where it cites § 72.212
“” 10 C.F.R. § 72.212 (a)(2), (b)(3). Once the NRC approves a dry cask for the storage of SNF under the specific conditions noted in the Certificate of Compliance, it adds the approved cask system to a list of approved storage systems.”
Later courts cite it for
“concurring opinions have no binding precedential value . . . .” · 3 citing courts
6
GREENMaine Yankee Atomic Power Co. v. Bonsey, 107 F. Supp. 2d 47 (D. Me. 2000).
cites § 72.212 2×cited by 4 cases
Where it cites § 72.212
“Nor does the state have any say in the selection, or specifications regarding construction of the dry cask storage containers, see 10 C.”
Later courts cite it for
“comply with state requirements that do not impermissi- bly infringe on radiological, operational, construction, or safety issues, such as, for example, aesthetic landscaping requirements” · 1 citing court
7
NEUTRALMaine Yankee v. Bonsey, 2000 DNH 106 (D.N.H. 2000).
cites § 72.212 2×cited by 0 cases
Where it cites § 72.212
“See 10 C.F.R. § 72.212 . Nor does the state have any authority to prevent an on-site transfer of the spent fuel – clearly an operational and nuclear safety issue.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200020102020

One bar per year. Tallest: 2 cases in 2000. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.39th Cir.1Conn.1D. Me.1D.N.H.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com