Skip to main content
C.F.R.Title 23Chapter I—Federal Highway Administration, Department of TransportationSubchapter G—Engineering and Traffic OperationsPart 635—Construction and MaintenanceSubpart A—Contract Procedures

23 C.F.R. § 635.104 (2026)

Method of construction

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1988–2013 3citing cases
At a glance

Courts have cited this section in 3 opinions since 1988.

(a) Actual construction work shall be performed by contract awarded by competitive bidding; unless, as provided in § 635.104(b), the State DOT demonstrates to the satisfaction of the Division Administrator that some other method is more cost effective or that an emergency exists. The State DOT shall assure opportunity for free, open, and competitive bidding, including adequate publicity of the advertisements or calls for bids. The advertising or calling for bids and the award of contracts shall comply with the procedures and requirements set forth in §§ 635.112 and 635.114.

(b) Approval by the Division Administrator for construction by a method other than competitive bidding shall be requested by the State in accordance with subpart B of part 635 of this chapter. Before such finding is made, the State DOT shall determine that the organization to undertake the work is so staffed and equipped as to perform such work satisfactorily and cost effectively.

(c) In the case of a design-build project, the requirements of 23 CFR part 636 and the appropriate provisions pertaining to design-build contracting in this part will apply. However, no justification of cost effectiveness is necessary in selecting projects for the design-build delivery method.

(d) In the case of a CM/GC project, the requirements of subpart E and the appropriate provisions pertaining to the CM/GC method of contracting in this part will apply. However, no justification of cost effectiveness is necessary in selecting projects for the CM/GC delivery method.

(e) In the case of an ID/IQ project, the requirements of subpart F of this part and the appropriate provisions pertaining to the ID/IQ method of contracting in this part will apply. However, no justification of cost effectiveness is necessary in selecting projects for the ID/IQ delivery method.

[56 FR 37004, Aug. 2, 1991, as amended at 67 FR 75925, Dec. 10, 2002; 81 FR 86942, Dec. 2, 2016; 85 FR 72931, Nov. 16, 2020]
The 3 cases that cite 23 C.F.R. § 635.104 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENGlasgow, Inc. v. Fed. High. Admin., 843 F.2d 130 (3d Cir. 1988).
cites § 635.104 1×cited by 3 cases
Where it cites § 635.104
“” See 23 C.F.R. § 635.104 (a) (1987). As the FHWA suggests in its brief, DBE participation is a variable with which a contractor deals in preparing a bid as bidders increase their bids according to the percentage of minority participation announced as the goal for the contract.”
Later courts cite it for
“it would be astounding to find that congress has limited the fhwa's function in a situation involving the expenditure of tens of millions of federal tax dollars to that of rubber-stamping a contract award decision by a state agency.” · 2 citing courts
cites § 635.104 2×
Where it cites § 635.104
“be performed by contract awarded by competitive bidding,” unless the state transportation department “demonstrates to the satisfaction of the Division Administrator that some other method is more cost effective or that an emergency exists,” 23 C.F.R. § 635.104 (a), and obligate…”
cites § 635.104 2×
Where it cites § 635.104
“be performed by contract awarded by competitive bidding,” unless the state transportation department “demonstrates to the satisfaction of the Division Administrator that some other method is more cost effective or that an emergency exists,” 23 C.F.R. § 635.104 (a), and obligate…”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198820002013

One bar per year. Tallest: 2 cases in 2013. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
OLC23rd Cir.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions