Skip to main content
C.F.R.Title 24Part 58—Environmental Review Procedures for Entities Assuming Hud Environmental ResponsibilitiesSubpart F—Environmental Review Process: Environmental Impact Statement Determinations

24 C.F.R. § 58.52 (2026)

Adoption of other agencies' EISs

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2020 1citing case
At a glance

Courts have cited this section in 1 opinion since 2020.

The responsible entity may adopt a draft or final EIS prepared by another agency provided that the EIS was prepared in accordance with 40 CFR parts 1500 through 1508. If the responsible entity adopts an EIS prepared by another agency, the procedure in 40 CFR 1506.3 shall be followed. An adopted EIS may have to be revised and modified to adapt it to the particular environmental conditions and circumstances of the project if these are different from the project reviewed in the EIS. In such cases the responsible entity must prepare, circulate, and file a supplemental draft EIS in the manner prescribed in § 58.60(d) and otherwise comply with the clearance and time requirements of the EIS process, except that scoping requirements under 40 CFR 1501.7 shall not apply. The agency that prepared the original EIS should be informed that the responsible entity intends to amend and adopt the EIS. The responsible entity may adopt an EIS when it acts as a cooperating agency in its preparation under 40 CFR 1506.3. The responsible entity is not required to re-circulate or file the EIS, but must complete the clearance process for the RROF. The decision to adopt an EIS shall be made a part of the project ERR.

The 1 case that cites 24 C.F.R. § 58.52 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
NO FLAGEarth Island Inst. v. Nash, No. 1:19-cv-01420 (E.D. Cal. Apr. 21, 2020).
cites § 58.52 1×
Where it cites § 58.52
“” 24 C.F.R. § 58.52 . 12 Additionally, the responsible entity must prepare a new EIS if an areawide or broad scale EIS has 13 been issued and the EIS did not anticipate a subsequent project requiring an environmental 14 clearance.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.