Overview of calculating formula expenses

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2019 1citing case
At a glance

Courts have cited this section in 1 opinion since 2019.

(a) General. Formula expenses represent the costs of services and materials needed by a well-run PHA to sustain the project. These costs include items such as administration, maintenance, and utilities. HUD also determines a PHA's formula expenses at a project level. HUD uses the following three factors to determine the overall formula expense level for each project:

(1)The project expense level (PEL) (calculated in accordance with § 990.165);

(2) The utilities expense level (UEL) (calculated in accordance with §§ 990.170, 990.175, 990.180, and 990.185); and

(3)Other formula expenses (add-ons) (calculated in accordance with § 990.190).

(b) PEL, UEL, and Add-ons. Each project of a PHA has a unique PEL and UEL. The PEL for each project is based on ten characteristics and certain adjustments described in § 990.165. The PEL represents the normal expenses of operating public housing projects, such as maintenance and administration costs. The UEL for each project represents utility expenses. Utility expense levels are based on an incentive system aimed at reducing utility expenses. Both the PEL and UEL are expressed in PUM costs. The expenses not included in these expense levels and which are unique to PHAs are titled “other formula expenses (add-ons)” and are expressed in a dollar amount.

(c) Calculating project formula expense. The formula expense of any one project is the sum of the project's PEL and the UEL, multiplied by the total EUMs specific to the project, plus the add-ons.

The 1 case that cites 24 C.F.R. § 990.160 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
NO FLAGSan Antonio Hous. Auth. v. United States, No. 17-1796 (Fed. Cl. June 11, 2019).
cites § 990.160 1×
Where it cites § 990.160
“265 (2018); see also 24 C.F.R. § 990.160 (2018). 4 the public housing agency’s estimated non-operating subsidy revenue and estimated operating expenses.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.