30 C.F.R. § 250.112

What standards must my welding equipment meet?

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

Your welding equipment must meet the following requirements:

(a) All engine-driven welding equipment must be equipped with spark arrestors and drip pans;

(b) Welding leads must be completely insulated and in good condition;

(c) Hoses must be leak-free and equipped with proper fittings, gauges, and regulators; and

(d) Oxygen and fuel gas bottles must be secured in a safe place.

Notes of Decisions
Cited in 2 cases, 1994–2012 · leading case: Cutting Underwater Tech. USA, Inc. v. Eni U.S. Operating Co., 671 F.3d 512 (5th Cir. 2012).
Cutting Underwater Tech. USA, Inc. v. Eni U.S. Operating Co., 671 F.3d 512 (5th Cir. 2012). “10596 , 10733 (1988) (codified at 30 C.F.R. § 250.112 ). 13 The *523 regulations had even used the phrase “plug and abandon.”
EP Operating Ltd. P'ship v. Placid Oil Co., 26 F.3d 563 (5th Cir. 1994). “30 C.F.R. § 250.112 (i). Also, Article 5 of the Convention on the Continental Shelf, 15 U.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.