C.F.R. homeSearch C.F.R.
C.F.R.Title 36Chapter II—Forest Service, Department of AgriculturePart 219—PlanningSubpart A—National Forest System Land Management Planning

36 C.F.R. § 219.11 (2026)

Timber requirements based on the NFMA

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1989–2015 22citing cases
At a glance

Courts have cited this section in 22 opinions since 1989.

While meeting the requirements of §§ 219.8 through 219.10, a plan developed or revised under this part must include plan components, including standards or guidelines, and other plan content regarding timber management within Forest Service authority and the inherent capability of the plan area, as follows:

(a) Lands not suited for timber production. (1) The responsible official shall identify lands within the plan area as not suited for timber production if any one of the following factors applies:

(i) Statute, Executive order, or regulation prohibits timber production on the land;

(ii) The Secretary of Agriculture or the Chief has withdrawn the land from timber production;

(iii) Timber production would not be compatible with the achievement of desired conditions and objectives established by the plan for those lands;

(iv) The technology is not currently available for conducting timber harvest without causing irreversible damage to soil, slope, or other watershed conditions;

(v) There is no reasonable assurance that such lands can be adequately restocked within 5 years after final regeneration harvest; or

(vi) The land is not forest land.

(2) The responsible official shall review lands identified in the plan as not suited for timber production at least once every 10 years, or as otherwise prescribed by law, to determine whether conditions have changed so that they have become suitable for timber production. As a result of this 10-year review, the plan may be amended to identify any such lands as suitable for timber production, if warranted by changed conditions.

(b) Timber harvest for purposes of timber production. A plan that identifies lands as suitable for timber production must include plan components, including standards or guidelines, to guide timber harvest for timber production or for other multiple use purposes on such lands.

(c) Timber harvest for purposes other than timber production. Except as provided in paragraph (d) of this section, the plan may include plan components to allow for timber harvest for purposes other than timber production throughout the plan area, or portions of the plan area, as a tool to assist in achieving or maintaining one or more applicable desired conditions or objectives of the plan in order to protect other multiple-use values, and for salvage, sanitation, or public health or safety. Examples of using timber harvest to protect other multiple use values may include improving wildlife or fish habitat, thinning to reduce fire risk, or restoring meadow or savanna ecosystems where trees have invaded.

(d) Limitations on timber harvest. Whether timber harvest would be for the purposes of timber production or other purposes, plan components, including standards or guidelines, must ensure the following:

(1) No timber harvest for the purposes of timber production may occur on lands not suited for timber production.

(2) Timber harvest would occur only where soil, slope, or other watershed conditions would not be irreversibly damaged;

(3) Timber harvest would be carried out in a manner consistent with the protection of soil, watershed, fish, wildlife, recreation, and aesthetic resources.

(4) Where plan components will allow clearcutting, seed tree cutting, shelterwood cutting, or other cuts designed to regenerate an even-aged stand of timber, the plan must include standards limiting the maximum size for openings that may be cut in one harvest operation, according to geographic areas, forest types, or other suitable classifications. Except as provided in paragraphs (d)(4)(i) through (iii) of this section, this limit may not exceed 60 acres for the Douglas-fir forest type of California, Oregon, and Washington; 80 acres for the southern yellow pine types of Alabama, Arkansas, Georgia, Florida, Louisiana, Mississippi, North Carolina, South Carolina, Oklahoma, and Texas; 100 acres for the hemlock-Sitka spruce forest type of coastal Alaska; and 40 acres for all other forest types.

(i) Plan standards may allow for openings larger than those specified in paragraph (d)(4) of this section to be cut in one harvest operation where the responsible official determines that larger harvest openings are necessary to help achieve desired ecological conditions in the plan area. If so, standards for exceptions shall include the particular conditions under which the larger size is permitted and must set a maximum size permitted under those conditions.

(ii) Plan components may allow for size limits exceeding those established in paragraphs (d)(4) introductory text and (d)(4)(i) of this section on an individual timber sale basis after 60 days public notice and review by the regional forester.

(iii) The plan maximum size for openings to be cut in one harvest operation shall not apply to the size of openings harvested as a result of natural catastrophic conditions such as fire, insect and disease attack, or windstorm (16 U.S.C. 1604(g)(3)(F)(iv)).

(5) Timber will be harvested from NFS lands only where such harvest would comply with the resource protections set out in sections 6(g)(3)(E) and (F) of the NFMA (16 U.S.C. 1604(g)(3)(E) and (F)). Some of these requirements are listed in paragraphs (d)(2) to (d)(4) of this section.

(6) The quantity of timber that may be sold from the national forest is limited to an amount equal to or less than that which can be removed from such forest annually in perpetuity on a sustained yield basis. This limit may be measured on a decadal basis.

(i) The plan may provide for departures from this limit as provided by the NFMA when departure would be consistent with the plan's desired conditions and objectives. Exceptions for departure from this limit on the quantity sold may be made only after a public review and comment period of at least 90 days.

(ii) This limit may be based upon increases in harvest levels based on intensified management practices, such as reforestation, thinning, and tree improvement if such practices justify increasing the harvests in accordance with the Multiple-Use Sustained-Yield Act of 1960. The plan must require that such harvest levels be decreased at the end of each planning period if such practices cannot be successfully implemented or funds are not received to permit such practices to continue substantially as planned.

(iii) The Chief must include in the Forest Service Directive System procedures for estimating the quantity of timber that can be removed annually in perpetuity on a sustained-yield basis, and exceptions, consistent with 16 U.S.C. 1611.

(7) The regeneration harvest of even-aged stands of trees is limited to stands that generally have reached the culmination of mean annual increment of growth. This requirement would apply only to regeneration harvest of even-aged stands on lands identified as suitable for timber production and where timber production is the primary purpose for the harvest. Plan components may allow for exceptions, set out in 16 U.S.C. 1604(m), only if such harvest is consistent with the other plan components of the land management plan.

[77 FR 21260, Apr. 9, 2012, as amended at 77 FR 44145, July 27, 2012; 78 FR 23492, Apr. 19, 2013; 81 FR 90737, Dec. 15, 2016; 86 FR 68149, Dec. 1, 2021]
The 20 cases that cite 36 C.F.R. § 219.11 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENCitizens for Env't Quality v. United States, 731 F. Supp. 970 (D. Colo. 1989).
cites § 219.11 4×cited by 35 cases
Where it cites § 219.11
“Establishment of forest-wide multiple-use goals and objectives ( 36 C.F.R. § 219.11 (b)); 2. Establishment of forest-wide management requirements (standards and guidelines) to fulfill the requirements of the NFMA.”
The case’s holding
A land management plan may defer site-specific soil studies to later stages, but the agency must identify the technology relied upon to prevent irreversible damage to soil.
2
GREENForest Guardians v. US Forest Serv., 180 F. Supp. 2d 1273 (D.N.M. 2001).
cites § 219.11 2×cited by 24 cases
Where it cites § 219.11
“(AR) 2 at 210; see 36 C.F.R. § 219.11 (d) (A Forest Plan must contain “[m]onitoring and evaluation requirements that will provide a basis for periodic determination and evaluation of the effects of management practices.”
Later courts cite it for
“solely on habitat trend data as a proxy for population data or to extrapolate population trends.” · 1 citing court
3
GREENUtah Env't Cong. v. Bosworth, 443 F.3d 732 (10th Cir. 2006).
cites § 219.11 1×cited by 67 cases
The case’s holding
Courts grant strong deference to agency decisions involving technical or scientific matters within the agency's area of expertise.
Later courts cite it for
“is especially strong where the challenged decisions involve technical or scientific matters within the agency's area of expertise.” · 10 citing courts
4
GREENForest Guardians v. United States Forest Serv., 579 F.3d 1114 (10th Cir. 2009).
cites § 219.11 2×cited by 14 cases
Summary
No passage or summary on file for this case yet.
5
GREENFed. Forest Resource Coalition v. Vilsack, 100 F. Supp. 3d 21 (D.D.C. 2015).
cites § 219.11 2×cited by 13 cases
Where it cites § 219.11
“” 36 C.F.R. § 219.11 (d). Plaintiffs claim that this provision violates the NFMA because, while that law does provide that no timber harvest shall occur on lands that are “not suited for timber production[,]”16 U.”
6
GREENUtah Env't Cong. v. Troyer, 479 F.3d 1269 (10th Cir. 2007).
cites § 219.11 1×cited by 38 cases
The case’s holding
An appellate court will not consider an argument that a party failed to raise in the lower court, as failure to preserve an issue constitutes a waiver.
Later courts cite it for
“at no point has plaintiff uec argued that the projects violated the 'best available science' standard.... if uec had argued that the decisions in question were deficient under the 'best available science' standard, the forest service would have been able to respond, and the district court would have been able to make appropriate findings.” · 2 citing courts
7
GREENUtah Env't Cong. v. Richmond, 483 F.3d 1127 (10th Cir. 2007).
cites § 219.11 1×cited by 30 cases
Where it cites § 219.11
“36 C.F.R. § 219.11 (a)(l)-(4) (2005). As we stated in Ecology Center, the Forest Service need not necessarily collect new data, but it must “seek out and consider all existing scientific evidence relevant to the decision .”
The case’s holding
NEPA does not prohibit an agency from approving a project with negative cumulative effects, so long as the agency considers and discloses those effects.
Later courts cite it for
“the forest service is obligated to apply the new regulations and is also bound to apply the terms of the 1986 forest plan, including the obligation to monitor the management indicator species listed in the plan, to the extent the plan does not conflict with the best available science' standard.” · 2 citing courts
8
REDSierra Club v. Robertson, 764 F. Supp. 546 (W.D. Ark. 1991).
cites § 219.11 3×cited by 8 cases
Reversed by Sierra Club v. Robertson (1992): the Court of Appeals for the Eighth Circuit's own opinion in this case.
Where it cites § 219.11
“4 But it is fairly clear that the 1990 LRMP does, as it is in fact mandated- to do by 36 C.F.R. 219.11, designate specific areas as suitable for timber production.”
Later courts cite it for
“the forest service has developed a practice of making, withdrawing, and reinstating timber sales and forest policy decisions in a way that might forestall judicial review indefinitely if left unchecked” · 2 citing courts
9
GREENSeattle Audubon Soc'y v. Lyons, 871 F. Supp. 1291 (W.D. Wash. 1994).
cites § 219.11 1×cited by 61 cases
Where it cites § 219.11
“§ 1604 (f)(5), and the implementing regulations at 36 C.F.R. §§ 219.11 and 219.12. Forest planning in two stages — the overall plan and the specific project — has been approved by the courts, see Idaho Conservation League v.”
The case’s holding
Agencies must disclose responsible scientific opinion in opposition to a proposed action and provide a good faith, reasoned response to such opinions.
Later courts cite it for
“must ... disclose responsible scientific opinion in opposition to the proposed action, and make a good faith, reasoned response to it.” · 3 citing courts
cites § 219.11 2×cited by 6 cases
Where it cites § 219.11
“See 36 C.F.R. § 219.11 . Furthermore, the statute requires the Forest Service to “revise” the plan “when the Secretary finds conditions in a [Forest] have significantly changed.”
Later courts cite it for
“implementation of the forest plan is achieved through individual site-specific projects, and all projects must be consistent with the forest plan.” · 2 citing courts
11
GREENEnv't Prot. Info. Ctr. v. Blackwell, 389 F. Supp. 2d 1174 (N.D. Cal. 2004).
cites § 219.11 2×cited by 6 cases
Where it cites § 219.11
“19, which requires monitoring of MIS, are 36 C.F.R. § 219.11 and § 219.12, which address respectively forest plan content and the forest planning process.”
12
GREENSierra Club v. Bosworth, 352 F. Supp. 2d 909 (D. Minn. 2005).
cites § 219.11 1×cited by 17 cases
Where it cites § 219.11
“§ 1604 (g) (2003); 36 C.F.R. § 219.11 (d); 36 C.F.R. § 219.19 (a)(7); (1986 Forest Plan at 3-1, 3-42).”
Later courts cite it for
“general statements that merely catalog environmental facts are legally inadequate in light of the relevant standard; rather, some quantified or detailed information is required.” · 2 citing courts
13
GREENIdaho Conservation League v. Mumma, 956 F.2d 1508 (9th Cir. 1992).
cites § 219.11 1×cited by 246 cases
Where it cites § 219.11
“§ 1604 (0; 36 C.F.R. § 219.11 (e). Further NEPA analysis is conducted to evaluate the effects of the specific project and contemplate a range of alternative actions, including a “no action” alternative.”
Later courts cite it for
“to the extent that the plan pre-determines the future, it represents a concrete injury that plaintiffs must, at some point, have standing to challenge.” · 5 citing courts
14
NO FLAGForest Guardians v. United States Forest Servs., 641 F.3d 423 (10th Cir. 2011).
cites § 219.11 2×cited by 14 cases
Where it cites § 219.11
“5, 2005); see 36 C.F.R. §§ 219.11 (2008). As thoroughly explained by the district court, Forest Guardians had argued to the agency that the 1982 Rules were applicable to the USFS's evaluation and approval of the A/C Project.”
15
REDSierra Club v. Glickman, 974 F. Supp. 905 (E.D. Tex. 1997).
cites § 219.11 1×cited by 14 cases
Vacated by Sierra Club v. Glickman (2000): the Court of Appeals for the Fifth Circuit's own opinion in this case.
Where it cites § 219.11
“” 36 C.F.R. § 219.11 (d). In conducting inventorying and monitoring, the Forest Service is required to continually identify research needs: .”
The case’s holding
The National Forest Management Act and its regulations require the Forest Service to collect current wildlife population data, so failing to do so is arbitrary and capricious and reviewable.
Later courts cite it for
“the unambiguous language of the mis regulations requires collection of population data.” · 3 citing courts
16
cites § 219.11 1×cited by 5 cases
Later courts cite it for
“congress recognized that things should continue to progress while a plan is in the process of revision, and that planning is an ongoing process, where the circumstances continue to change” · 3 citing courts
17
GREENRiverhawks v. Zepeda, 228 F. Supp. 2d 1173 (D. Or. 2002).
cites § 219.11 1×cited by 5 cases
Where it cites § 219.11
“19 ; 36 C.F.R. §§ 219.11 (a)(l)(ii); 219.20(a)(1)(H); 219.”
Later courts cite it for
“plaintiffs provide no persuasive authority that the cmp's requirement that "a recreation plan will be prepared for the river area” · 2 citing courts
18
GREENWyoming Sawmills, Inc. v. United States Forest Serv., 179 F. Supp. 2d 1279 (D. Wyo. 2001).
cites § 219.11 1×cited by 5 cases
Where it cites § 219.11
“See 36 C.F.R. § 219.11 . 1. Procedures NFS must follow in amending a forest plan and the definition of a “significant impact” Forest Service regulations provide that a forest plan may be amended.”
19
GREENSierra Club v. Robertson, 845 F. Supp. 485 (S.D. Ohio 1994).
cites § 219.11 1×cited by 5 cases
Where it cites § 219.11
“§ 1604 (i); 36 C.F.R. § 219.11 (e). Further NEPA analysis is required to evaluate the effects of a specific project and a range of alternative actions, including a “no action” alternative.”
20
GREENEcology Ctr., Inc. v. United States Forest Serv., 192 F.3d 922 (9th Cir. 1999).
cites § 219.11 1×cited by 5 cases
Where it cites § 219.11
“” See 36 C.F.R. § 219.11 . 4 The Plan sets forth 39 specific parameters-such as trends in recreation, wildlife habitat and populations, recovery of endangered species, acres of noxious weed infestation, and acres of timber harvest-to be monitored on an annual, biannual or…”
Later courts cite it for
“this court has refused to allow plaintiffs to evade the finality requirement with complaints about the sufficiency of an agency action 'dressed up as an agency's failure to act.” · 11 citing courts

Show all 22 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198920022015

One bar per year. Tallest: 2 cases in 1994. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
10th Cir.59th Cir.2D.D.C.2D. Wyo.2W.D. Ark.15th Cir.16th Cir.1N.D. Cal.1

The 8 courts with the most citing cases, of 15 courts in all.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 22 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.