C.F.R. homeSearch C.F.R.
C.F.R.Title 40Chapter I—Environmental Protection AgencySubchapter D—Water ProgramsPart 125—Criteria and Standards for the National Pollutant Discharge Elimination SystemSubpart I—Requirements Applicable to Cooling Water Intake Structures for New Facilities Under Section 316(b) of the Act

40 C.F.R. § 125.84 (2026)

As an owner or operator of a new facility, what must I do to comply with this subpart?

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2004–2018 8citing cases
At a glance

Courts have cited this section in 8 opinions since 2004.

(a)(1) The owner or operator of a new facility must comply with either:

(i) Track I in paragraph (b) or (c) of this section; or

(ii) Track II in paragraph (d) of this section.

(2) In addition to meeting the requirements in paragraph (b), (c), or (d) of this section, the owner or operator of a new facility may be required to comply with paragraph (e) of this section.

(b) Track I requirements for new facilities that withdraw equal to or greater than 10 MGD. You must comply with all of the following requirements:

(1) You must reduce your intake flow, at a minimum, to a level commensurate with that which can be attained by a closed-cycle recirculating cooling water system;

(2) You must design and construct each cooling water intake structure at your facility to a maximum through-screen design intake velocity of 0.5 ft/s;

(3) You must design and construct your cooling water intake structure such that the total design intake flow from all cooling water intake structures at your facility meets the following requirements:

(i) For cooling water intake structures located in a freshwater river or stream, the total design intake flow must be no greater than five (5) percent of the source water annual mean flow;

(ii) For cooling water intake structures located in a lake or reservoir, the total design intake flow must not disrupt the natural thermal stratification or turnover pattern (where present) of the source water except in cases where the disruption is determined to be beneficial to the management of fisheries for fish and shellfish by any fishery management agency(ies);

(iii) For cooling water intake structures located in an estuary or tidal river, the total design intake flow over one tidal cycle of ebb and flow must be no greater than one (1) percent of the volume of the water column within the area centered about the opening of the intake with a diameter defined by the distance of one tidal excursion at the mean low water level;

(4) You must select and implement design and construction technologies or operational measures for minimizing impingement mortality of fish and shellfish if:

(i) There are threatened or endangered or otherwise protected federal, state, or tribal species, or critical habitat for these species, within the hydraulic zone of influence of the cooling water intake structure; or

(ii) Based on information submitted by any fishery management agency(ies) or other relevant information, there are migratory and/or sport or commercial species of impingement concern to the Director that pass through the hydraulic zone of influence of the cooling water intake structure; or

(iii) It is determined by the Director, based on information submitted by any fishery management agency(ies) or other relevant information, that the proposed facility, after meeting the technology-based performance requirements in paragraphs (b)(1), (2), and (3) of this section, would still contribute unacceptable stress to the protected species, critical habitat of those species, or species of concern;

(5) You must select and implement design and construction technologies or operational measures for minimizing entrainment of entrainable life stages of fish and shellfish if:

(i) There are threatened or endangered or otherwise protected federal, state, or tribal species, or critical habitat for these species, within the hydraulic zone of influence of the cooling water intake structure; or

(ii) Based on information submitted by any fishery management agency(ies) or other relevant information, there are or would be undesirable cumulative stressors affecting entrainable life stages of species of concern to the Director and the Director determines that the proposed facility, after meeting the technology-based performance requirements in paragraphs (b)(1), (2), and (3) of this section, would still contribute unacceptable stress to the protected species , critical habitat of those species, or these species of concern;

(6) You must submit the application information required in 40 CFR 122.21(r) and § 125.86(b);

(7) You must implement the monitoring requirements specified in § 125.87;

(8) You must implement the record-keeping requirements specified in § 125.88.

(c) Track I requirements for new facilities that withdraw greater than 2 mgd and less than 10 mgd and that choose not to comply with paragraph (b) of this section. You must comply with all the following requirements:

(1) You must design and construct each cooling water intake structure at your facility to a maximum through-screen design intake velocity of 0.5 ft/s;

(2) You must design and construct your cooling water intake structure such that the total design intake flow from all cooling water intake structures at your facility meets the following requirements:

(i) For cooling water intake structures located in a freshwater river or stream, the total design intake flow must be no greater than five (5) percent of the source water annual mean flow;

(ii) For cooling water intake structures located in a lake or reservoir, the total design intake flow must not disrupt the natural thermal stratification or turnover pattern (where present) of the source water except in cases where the disruption is determined to be beneficial to the management of fisheries for fish and shellfish by any fishery management agency(ies);

(iii) For cooling water intake structures located in an estuary or tidal river, the total design intake flow over one tidal cycle of ebb and flow must be no greater than one (1) percent of the volume of the water column within the area centered about the opening of the intake with a diameter defined by the distance of one tidal excursion at the mean low water level;

(3) You must select and implement design and construction technologies or operational measures for minimizing impingement mortality of fish and shellfish if:

(i) There are threatened or endangered or otherwise protected federal, state, or tribal species, or critical habitat for these species, within the hydraulic zone of influence of the cooling water intake structure; or

(ii) Based on information submitted by any fishery management agency(ies) or other relevant information, there are migratory and/or sport or commercial species of impingement concern to the Director that pass through the hydraulic zone of influence of the cooling water intake structure; or

(iii) It is determined by the Director, based on information submitted by any fishery management agency(ies) or other relevant information, that the proposed facility, after meeting the technology-based performance requirements in paragraphs (c)(1) and (2) of this section, would still contribute unacceptable stress to the protected species, critical habitat of those species, or species of concern;

(4) You must select and implement design and construction technologies or operational measures for minimizing entrainment of entrainable life stages of fish and shellfish;

(5) You must submit the application information required in 40 CFR 122.21(r) and § 125.86(b)(2), (3), and (4);

(6) You must implement the monitoring requirements specified in § 125.87;

(7) You must implement the recordkeeping requirements specified in § 125.88.

(d) Track II. The owner or operator of a new facility that chooses to comply under Track II must comply with the following requirements:

(1) You must demonstrate to the Director that the technologies employed will reduce the level of adverse environmental impact from your cooling water intake structures to a level comparable to that which you would achieve were you to implement the requirements of paragraphs (b)(1) and (2) of this section. This demonstration must include a showing that the impacts to fish and shellfish, including important forage and predator species, within the watershed will be comparable to those which would result if you were to implement the requirements of paragraphs (b)(1) and (2) of this section. The Director will consider information provided by any fishery management agency and may also consider data and information from other sources.

(2) You must design and construct your cooling water intake structure such that the total design intake flow from all cooling water intake structures at your facility meet the following requirements:

(i) For cooling water intake structures located in a freshwater river or stream, the total design intake flow must be no greater than five (5) percent of the source water annual mean flow;

(ii) For cooling water intake structures located in a lake or reservoir, the total design intake flow must not disrupt the natural thermal stratification or turnover pattern (where present) of the source water except in cases where the disruption is determined to be beneficial to the management of fisheries for fish and shellfish by any fishery management agency(ies);

(iii) For cooling water intake structures located in an estuary or tidal river, the total design intake flow over one tidal cycle of ebb and flow must be no greater than one (1) percent of the volume of the water column within the area centered about the opening of the intake with a diameter defined by the distance of one tidal excursion at the mean low water level.

(3) You must submit the application information required in 40 CFR 122.21(r) and § 125.86(c).

(4) You must implement the monitoring requirements specified in § 125.87.

(5) You must implement the record-keeping requirements specified in § 125.88.

(e) You must comply with any more stringent requirements relating to the location, design, construction, and capacity of a cooling water intake structure or monitoring requirements at a new facility that the Director deems are reasonably necessary to comply with any provision of state law, including compliance with applicable state water quality standards (including designated uses, criteria, and antidegradation requirements).

[66 FR 65338, Dec. 18, 2001, as amended at 68 FR 36754, June 19, 2003; 79 FR 48429, Aug. 15, 2014]
The 8 cases that cite 40 C.F.R. § 125.84 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 125.84 1×cited by 15 cases
The case’s holding
An agency may defer analysis of a final rule's effects on listed species, and may set cooling water intake standards case-by-case weighing costs against benefits, if its reasoning is rational and record-supported.
Later courts cite it for
“adequately describes the nature of the . . . requested documents and their rationale for classifying those documents as deliberative and therefore privileged.” · 3 citing courts
2
cites § 125.84 13×cited by 3 cases
Where it cites § 125.84
“7 *183 Under Track II, a facility is not bound by the capacity, velocity, or “additional” requirements of Track I (although it must comply with identical proportional flow requirements, see 40 C.F.R. § 125.84 (d)(2)). Instead, a facility may take any steps provided it can show,…”
Later courts cite it for
“narrow, limited to examining the administrative record to determine whether the agency decision was based on a consideration of the relevant factors and whether there has been a clear error of judgment.” · 6 citing courts
3
GREENConocoPhillips Co. v. United States Env't Prot. Agency, 612 F.3d 822 (5th Cir. 2010).
cites § 125.84 1×cited by 24 cases
Where it cites § 125.84
“(quoting 40 C.F.R. § 125.84 (d)(1)). 18 . Id. 19 .”
Later courts cite it for
“nouns joined by coordinating conjunctions are usually treated as a single, compounded unit, and a postmodifying prepositional phrase is most naturally read to modify that single unit.” · 2 citing courts
cites § 125.84 1×cited by 10 cases
Reversed by the U.S. Supreme Court in this case: Entergy Corp. v. Riverkeeper, Inc. (2009).
Where it cites § 125.84
“at 183 (quoting 40 C.F.R. § 125.84 (d)(1)). Environmental and industry groups challenged certain aspects of the rule, including, inter alia, the part of the Track II procedure allowing power plants to comply with section 316(b) by undertaking so-called “restoration measures,”…”
Later courts cite it for
“an agency's interpretation of its own ... reg 212 ulation must be given controlling weight unless it is plainly erroneous or inconsistent with the regulation” · 2 citing courts
cites § 125.84 1×cited by 2 cases
Summary
No passage or summary on file for this case yet.
6
NO FLAGCooling Water Intake Structure Coal. v. EPA, No. 14-4645(L) (2d Cir. July 23, 2018).
cites § 125.84 1×cited by 0 cases
Summary
No passage or summary on file for this case yet.
7
NO FLAGCooling water intake structure coal. v. epa, No. 14-4645(L) (2d Cir. Sept. 27, 2018).
cites § 125.84 1×cited by 0 cases
Summary
No passage or summary on file for this case yet.
8
GREENConocoPhillips Co v. EPA, No. 06-60662 (5th Cir. Aug. 9, 2010).
cites § 125.84 1×cited by 0 cases
Where it cites § 125.84
“(quoting 40 C.F.R. § 125.84 (d)(1)). 18 Id. 5 No. 06-60662 requirement that the EPA minimize adverse environmental impacts by regulating the location, design, construction, and capacity of CWIS.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200420112018

One bar per year. Tallest: 4 cases in 2018. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
2d Cir.65th Cir.2
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com