44 C.F.R. § 72.2

Definitions

Read at: eCFRecfr.gov CornellLII GovInfogovinfo.gov CasesGoogle Scholar

Except as otherwise provided in this part, the definitions in 44 CFR part 59 are applicable to this part. For the purposes of this part, the products are defined as follows:

CLOMA. A CLOMA is FEMA's comment on a proposed structure or group of structures that would, upon construction, be located on existing natural ground above the base (1-percent-annual-chance) flood elevation on a portion of a legally defined parcel of land that is partially inundated by the base flood.

CLOMR. A CLOMR is FEMA's comment on a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective base flood elevations, or the Special Flood Hazard Area (SFHA).

CLOMR-F. A CLOMR-F is FEMA's comment on a proposed project that would, upon construction, result in a modification of the SFHA through the placement of fill outside the existing regulatory floodway.

LOMR. A LOMR is FEMA's modification to an effective Flood Insurance Rate Map (FIRM), or Flood Boundary and Floodway Map (FBFM), or both. LOMRs are generally based on the implementation of physical measures that affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective base flood elevations, or the SFHA. The LOMR officially revises the FIRM or FBFM, and sometimes the Flood Insurance Study (FIS) report, and, when appropriate, includes a description of the modifications. The LOMR is generally accompanied by an annotated copy of the affected portions of the FIRM, FBFM, or FIS report.

LOMR-F. A LOMR-F is FEMA's modification of the SFHA shown on the FIRM based on the placement of fill outside the existing regulatory floodway.

PMR. A PMR is FEMA's physical revision and republication of an effective FIRM, FBFM, or FIS report. PMRs are generally based on physical measures that affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective base flood elevations, or the SFHA.

[62 FR 5737, Feb. 6, 1997]
Notes of Decisions
Cited in 6 cases (1 in the last 5 years), 2010–2025 · leading case: Coalition for a Sustainable Delta v. Fed. Emergency Mgmt. Agency, 812 F. Supp. 2d 1089 (E.D. Cal. 2011).
Coalition for a Sustainable Delta v. Fed. Emergency Mgmt. Agency, 812 F. Supp. 2d 1089 (E.D. Cal. 2011). · cites it 4× “” 44 C.F.R. § 72.2 . A LOMR may also be issued as a result of updated flood hazard data that requires a modification of the FIRM.”
Great Rivers Habitat All. v. Fed. Emergency Mgmt. Agency, 615 F.3d 985 (8th Cir. 2010). “44 C.F.R. § 72.2 . On December 29, 2006, the City of St.”
the City of Keller v. Kimberlee Diane Meadors Hall & A. Thomas Hall, 433 S.W.3d 708 (Tex. App. 2014). · cites it 2× “52 44 C.F.R. § 72.2 (last amended 1997). 53 Id.”
Wozniak v. Colchester, 193 Conn. App. 842 (Conn. App. Ct. 2019). · cites it 2× “’’ 44 C.F.R. § 72.2 . Unlike a LOMA, which is an official notice that a particular property should not be included in a special flood hazard area or regulatory floodway, the issuance of a LOMR by FEMA results in an official revision to the flood insur- ance rate map itself.”
the City of Crowley v. Doug Ray, 558 S.W.3d 335 (Tex. App. 2018). “denied) (citing 44 C.F.R. § 72.2 (West, Westlaw through Aug.”
State of New Hampshire v. Shane M. Beattie & a. (N.H. 2025). “’” (Quoting 44 C.F.R. § 72.2 ). According to the defendants “‘A CLOMR is a pre-project application to FEMA showing what changes the proposed project will make to the local floodplain.”