Emission limitations for cellular equipment

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1984–1998 7citing cases
At a glance

Courts have cited this section in 7 opinions since 1984. The most litigated part is subsection (c) (1 case).

The rules in this section govern the spectral characteristics of emissions in the Cellular Radiotelephone Service.

(a) Out of band emissions. The power of any emission outside of the authorized operating frequency ranges must be attenuated below the transmitting power (P) by a factor of at least 43 + 10 log(P) dB.

(b) Measurement procedure. Compliance with these rules is based on the use of measurement instrumentation employing a reference bandwidth as follows:

(1) In the spectrum below 1 GHz, instrumentation should employ a reference bandwidth of 100 kHz or greater. In the 1 MHz bands immediately outside and adjacent to the frequency block, a resolution bandwidth of at least one percent of the emission bandwidth of the fundamental emission of the transmitter may be employed. A narrower resolution bandwidth is permitted in all cases to improve measurement accuracy, provided that the measured power is integrated over the full required reference bandwidth (i.e., 100 kHz or 1 percent of emission bandwidth, as specified). The emission bandwidth is defined as the width of the signal between two points, one below the carrier center frequency and one above the carrier center frequency, outside of which all emissions are attenuated at least 26 dB below the transmitter power.

(2) In the spectrum above 1 GHz, instrumentation should employ a reference bandwidth of 1 MHz.

(c) Alternative out of band emission limit. Licensees in this service may establish an alternative out of band emission limit to be used at specified band edge(s) in specified geographical areas, in lieu of that set forth in this section, pursuant to a private contractual arrangement of all affected licensees and applicants. In this event, each party to such contract shall maintain a copy of the contract in their station files and disclose it to prospective assignees or transferees and, upon request, to the FCC.

(d) Interference caused by out of band emissions. If any emission from a transmitter operating in this service results in interference to users of another radio service, the FCC may require a greater attenuation of that emission than specified in this section.

[67 FR 77191, Dec. 17, 2002, as amended at 82 FR 17583, Apr. 12, 2017]
The 7 cases that cite 47 C.F.R. § 22.917 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENPac. Nat'l Cellular v. United States, 41 Fed. Cl. 20 (Fed. Cl. 1998).
cites § 22.917 4×cited by 9 cases
Where it cites § 22.917
“The Third Notice proposed a regulation, published as amended at 47 C.F.R. § 22.917 (c) (1988), which required applicants to submit a “firm financial commitment” letter from lenders that guaranteed the funding necessary to build a cellular system.”
Later courts cite it for
“nothing in the statute creates an entitlement in any individual or entity to collect money from the sovereign” · 2 citing courts
2
GREENNe. Cellular Tel. Co., L.P. v. Fed. Commc'ns Comm'n, 897 F.2d 1164 (D.C. Cir. 1990).
cites § 22.917 1×cited by 25 cases
Where it cites § 22.917
“47 C.F.R. § 22.917 (b)(l)(i) (1986). If the selected applicant fails to satisfy these requirements, the applicant is disqualified and the second-place applicant is substituted as the tentative lottery selectee.”
Later courts cite it for
“particular facts would make strict compliance inconsistent with the public interest.” · 8 citing courts
3
GREENEDM & Assocs., Inc. v. GEM Cellular, 597 A.2d 384 (D.C. 1991).
cites § 22.917 1×cited by 13 cases
Where it cites § 22.917
“Under the applicable FCC Regulation, see 47 C.F.R. § 22.917 (b) (1986), GEM was then required to demonstrate its financial capacity to construct the proposed cellular system, and to operate it for one year, by obtaining a “firm financial commitment letter.”
Later courts cite it for
“courts deal with the substance, rather than the form, of transactions.” · 2 citing courts
4
GREENSaco River Cellular, Inc. v. Fed. Commc'ns Comm'n, 133 F.3d 25 (D.C. Cir. 1998).
cites § 22.917 4×cited by 4 cases
Where it cites § 22.917
“) Saco River and Northeast, the remaining two applicants, objected that PortCell was ineligible for a license because it had failed to “obtain a firm financial commitment for the financing necessary to construct and operate for one year its proposed cellular system and amend its…”
5
GREENMCI Cellular Tel. Co. v. Fed. Commc'ns Comm'n, 738 F.2d 1322 (D.C. Cir. 1984).
cites § 22.917 2×cited by 1 case
Later courts cite it for
“a highly technical question ... courts necessarily must show considerable deference to an agency's expertise.” · 9 citing courts
6
NO FLAG475342 Alberta Ltd. v. Dataphon Cellular, No. 95-5213 (10th Cir. Nov. 6, 1996).
cites § 22.917 4×subsections: (d)cited by 0 casesunpublished
Summary
No passage or summary on file for this case yet.
7
NO FLAG475342 Alberta, Ltd. v. Braley, 932 F. Supp. 764 (W.D. Va. 1996).
cites § 22.917 1×subsections: (c)cited by 0 cases
Where it cites § 22.917
“47 C.F.R. 22.917(c) (1988). On December 7, 1988, Braley obtained a financial commitment letter (“1988 letter”) from NovAtel, and submitted it to the Federal Communications Commission (“FCC”) as proof that he had requisite financial backing to construct and operate a cellular…”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198419911998

One bar per year. Tallest: 2 cases in 1996. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.310th Cir.1D.C.1Fed. Cl.1W.D. Va.1
By subsection
(c)1 case
475342 Alberta, Ltd. v. Braley, 932 F. Supp. 764 (W.D. Va. 1996).“47 C.F.R. 22.917(c) (1988). On December 7, 1988, Braley obtained a financial commitment letter (“1988 letter”) from NovAtel, and submitted it to the Federal Communications Commission (“FCC”) as proof that he had requisite financial backing to construct and operate a cellular…”
(d)1 case
475342 Alberta Ltd. v. Dataphon Cellular, No. 95-5213 (10th Cir. Nov. 6, 1996).
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com