Customer meters and regulators: Installation
Courts have cited this section in 1 opinion since 2022, 1 of them in the last five years.
(a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon the connecting piping and the meter.
(b) When close all-thread nipples are used, the wall thickness remaining after the threads are cut must meet the minimum wall thickness requirements of this part.
(c) Connections made of lead or other easily damaged material may not be used in the installation of meters or regulators.
(d) Each regulator that might release gas in its operation must be vented to the outside atmosphere.
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.