9 C.F.R. § 590.124 (2026)
Schedule of operation of official plants
Edition and currency
Other sources
Operating schedules for an official plant shall be subject to approval of the Administrator. The normal operating schedule shall consist of a continuous 8-hour period per day and shall include the time for FSIS inspection program personnel to put on required gear and to walk to a work station, and the time for FSIS inspection program personnel to return from a work station and remove required gear (excluding not to exceed 1 hour for lunch), 5 consecutive days per week, within the administrative workweek, Sunday through Saturday, for each full shift required. Clock hours of daily operations need not be specified in a schedule, although as a condition of continuance of approval of a schedule, the hours of operation must be reasonably uniform from day to day.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.