Colorado Revised Statutes homeSearch Colorado

Colo. Rev. Stat. § 37-90-110 (2024)

Powers of the state engineer

Edition and currency
C.R.S. 2024: the 2025 and 2026 sessions are not included. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTC.R.S. 2024: the 2025 and 2026 sessions are not included cited 1981–2024 8citing cases
At a glance

Courts have cited this section in 8 opinions since 1981, 1 of them in the last five years. The most litigated part is subsection (1) (2 cases).

(1) In the administration and enforcement of this article and in the effectuation of the policy of this state to conserve its groundwater resources and for the protection of vested rights, the state engineer, either in the state engineer's own capacity or as the executive director of the commission, is empowered: (a) To require all flowing wells to be equipped with valves so that the flow of water can be controlled; (b) To require both flowing and nonflowing wells to be so constructed and maintained as to prevent the waste of groundwaters through leaky wells, casings, pipes, fittings, valves, or pumps, either above or below the land surface; (c) To go upon all lands, both public and private, for the purpose of inspecting wells, pumps, casings, pipes, fittings, and measuring devices, including wells used or claimed to be used for domestic or stock purposes; (d) To order the cessation of the use of a well pending the correction of any defect that the state engineer has ordered corrected; (e) To commence actions to enjoin the illegal opening or excavation of wells or withdrawal or use of water therefrom and to appear and become a party to any action or proceeding pending in any court or administrative agency when it appears that the determination of such action or proceeding might result in depletion of the groundwater resources of the state contrary to the public policy expressed in this article or might injure vested rights of other appropriators; (f) To take such action as may be required to enforce compliance with any regulation, control, or order promulgated pursuant to the provisions of this article; (g) To issue to the owners or users of wells pumping designated groundwater in the state such orders as are necessary to implement the provisions of this section and section 37-90-111. In addition to any other method of giving notice, the mailing of the order in a certified letter to the well owner or operator, together with the posting of a written order, in plain sight, at the well head, shall be considered sufficient notice of the order of the state engineer, and, when so posted, the order shall be effective from the time of posting. (h) To administer the movement of water involved in any commission-issued replacement plan or plan for augmentation involving designated groundwater. In such administration, the state engineer shall issue such orders as are necessary and appropriate. (i) To order any person supplying energy used to pump designated groundwater to provide, at reasonable times, records of energy used to pump groundwater. The state engineer may exercise this authority only in connection with an alleged violation of this article. Suppliers of energy used to pump groundwater shall not be required to maintain records of energy used to pump groundwater more than five years after the year in which the energy is consumed. Suppliers of energy used to pump groundwater shall be held harmless from any and all civil or criminal liability with respect to the transfer of records pursuant to this section. Nothing contained in this paragraph (i) shall affect any reporting requirements of the public utilities commission pursuant to section 40-3-110, C.R.S. This paragraph (i) shall not apply to any person diverting by means of a well described in section 37-90-105 (1)(a).

Source: L. 65: R&RE, p. 1253, § 1. C.R.S. 1963: § 148-18-9. L. 71: p. 1318, § 17. L. 94: IP(1) and (1)(f) amended, p. 1747, § 2, effective July 1. L. 2004: IP(1) amended and (1)(g), (1)(h), and (1)(i) added, p. 1164, § 1, effective May 27.

Cross references: For general duties of the state engineer, see § 37-80-102.

The 8 cases that cite Colo. Rev. Stat. § 37-90-110 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 37-90-110 8×cited by 73 cases
Where it cites § 37-90-110
“(1990), of the Act, amended in 1983, as these provisions existed when the rule was adopted: (1) Any party, including a ground water management district, adversely affected or aggrieved by any decision or act of the ground water commission under the provisions of this article or…”
The case’s holding
Agency rulemaking is a quasi-legislative action subject to on-the-record review under the Administrative Procedure Act rather than de novo review by specialized water judges.
Later courts cite it for
“challenging party has a heavy burden to establish invalidity of the rule” · 1 citing court
2
GREENState v. Sw. Colorado Water Conservation Dist., 671 P.2d 1294 (Colo. 1983).
cites § 37-90-110 10×cited by 42 cases
Where it cites § 37-90-110
“[33] Section 37-90-110, C.R.S.1973 empowers the state engineer to require all flowing wells to be equipped with valves, to require all wells to be constructed and maintained so as to prevent waste, to inspect wells, to order cessation of well use pending correction of defects,…”
The case’s holding
The Colorado Constitution and the Water Right Determination and Administration Act of 1969 do not authorize the appropriation or adjudication of nontributary ground water.
Later courts cite it for
“law governing nontributary ground water has developed more slowly than that with respect to tributary water.” · 3 citing courts
3
GREENDanielson v. Jones, 698 P.2d 240 (Colo. 1985).
cites § 37-90-110 4×cited by 20 cases
Where it cites § 37-90-110
“Subsection 37-90-115(1) now authorizes an appeal by any party adversely affected “by a decision or act of the state engineer under section 37-90-110.” Ch. 409, sec. 2, § 37-90-115, 1983 Colo.”
Later courts cite it for
“compliance with the statutory notice provisions is es sential to provide a meaningful opportunity to those who might be injuriously affected by the decree to oppose the application.” · 2 citing courts
4
GREENState ex rel. Danielson v. Vickroy, 627 P.2d 752 (Colo. 1981).
cites § 37-90-110 3×subsections: (1)(e) 3×cited by 29 cases
Where it cites § 37-90-110
“Section 37-90-107, C.R.S.1973. The state engineer is ex officio the executive director of the commission, section 37-90-104(6), C.”
The case’s holding
Relief involving groundwater in a designated basin must be sought through administrative and judicial channels prescribed by the Colorado Ground Water Management Act before invoking water court jurisdiction.
Later courts cite it for
“includes water not tributary to any stream, and other water not available for the fulfillment of decreed surface rights.” · 3 citing courts
cites § 37-90-110 3×cited by 38 cases
Where it cites § 37-90-110
“(2009) and decisions of the State Engineer under section 37-90-110, C.R.S. (2009); Eagle Peak Farms, Ltd.”
The case’s holding
A water court has jurisdiction to require replacement of all injurious depletions, including those occurring prior to the filing of an augmentation plan application.
Later courts cite it for
“when the general assembly includes a provision in one section of a statute, but excludes the same provision from another section, we presume that the general assembly did so purposefully.” · 8 citing courts
6
GREENParker Water & Sanitation Dist. v. Kevin G. Rein, 2024 CO 71, 559 P.3d 217.
cites § 37-90-110 4×subsections: (1) 2×cited by 2 cases
Where it cites § 37-90-110
“3d at 1206 ; § 37-90-110 (1) , C.R.S. ( 2024 ) . Given our conclusion that the statute and the Rules unambiguously limit the total amount of nontributary Denver Basin groundwater that may be withdrawn over the lifetime of a well permit, we hold that the State Engineer has the…”
Later courts cite it for
“stretching from greeley on the north, colorado springs on the south, the front-range hogback on the west, and limon on the east.” · 1 citing court
7
REDEagle Peak Farms, Ltd. v. Colorado Ground Water Comm'n, 870 P.2d 539 (Colo. Ct. App. 1994).
cites § 37-90-110 2×subsections: (1) 2×cited by 4 cases
Reversed by Colorado Ground Water Commission v. Eagle Peak Farms, Ltd. (1996): the Supreme Court of Colorado's own opinion in this case.
Summary
No passage or summary on file for this case yet.
8
GREENWell Augmentation Subdistrict v. Aurora, 221 P.3d 399 (Colo. 2009).
cites § 37-90-110 3×cited by 0 cases
Where it cites § 37-90-110
“(2009) and decisions of the State Engineer under section 37-90-110, C.R.S. (2009)); Eagle Peak Farms, Ltd.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198120022024

One bar per year. Tallest: 2 cases in 2009. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Colo.7Colo. Ct. App.1
By subsection
(1)2 cases
Parker Water & Sanitation Dist. v. Kevin G. Rein, 2024 CO 71, 559 P.3d 217.“3d at 1206 ; § 37-90-110 (1) , C.R.S. ( 2024 ) . Given our conclusion that the statute and the Rules unambiguously limit the total amount of nontributary Denver Basin groundwater that may be withdrawn over the lifetime of a well permit, we hold that the State Engineer has the…”
Eagle Peak Farms, Ltd. v. Colorado Ground Water Comm'n, 870 P.2d 539 (Colo. Ct. App. 1994).
(1)(e)1 case
State ex rel. Danielson v. Vickroy, 627 P.2d 752 (Colo. 1981).“Section 37-90-107, C.R.S.1973. The state engineer is ex officio the executive director of the commission, section 37-90-104(6), C.”
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: C.R.S. 2024: the 2025 and 2026 sessions are not included. Syfert holds no earlier or later version of this section.

Colorado Revised Statutes Home  |  Search Colorado  |  Search cases for this section  |  syfert.com