Colo. Rev. Stat. § 40-4-106 (2024)

Rules for public safety - crossings - civil fines - allocation of expenses

Edition and currency
C.R.S. 2024: the 2025 and 2026 sessions are not included. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTC.R.S. 2024: the 2025 and 2026 sessions are not included cited 1976–1990 10citing cases
At a glance

Courts have cited this section in 10 opinions since 1976. The most litigated part is subsection (3) (3 cases).

(1)

(a) The commission may, after a hearing on its own motion or upon complaint, make general or special orders, promulgate rules, or act by other means to require each public utility to maintain and operate its lines, plant, system, equipment, electrical wires, apparatus, tracks, and premises in such a manner as to promote and safeguard the health and safety of its employees, passengers, customers, subscribers, and the public and to require the performance of any other act that the health or safety of its employees, passengers, customers, subscribers, or the public may demand.

(b) If, pursuant to this subsection (1), the commission issues an order or promulgates a rule requiring a railroad company to comply with railroad crossing safety regulations, the commission may impose a civil penalty pursuant to article 7 of this title 40, in an amount not to exceed the maximum amount set forth in section 40-7-105 (1), against a railroad company that fails to comply with the order or rule.

(2) (a) The commission has the power to determine, order, and prescribe, in accordance with the plans and specifications to be approved by it, the just and reasonable manner including the particular point of crossing at which the tracks or other facilities of any public utility may be constructed across the facilities of any other public utility at grade, or above or below grade, or at the same or different levels, or at which the tracks or other facilities of any railroad corporation may be constructed across any public highway at grade, or above or below grade, or at which any public highway may be constructed across the tracks or other facilities of any railroad corporation at grade, or above or below grade and to determine, order, and prescribe the terms and conditions of installation and operation, maintenance, and warning at all such crossings that may be constructed, including the posting of personnel or the installation and regulation of lights, block, interlocking, or other system of signaling, safety appliance devices, or such other means or instrumentalities as may to the commission appear reasonable and necessary to the end, intent, and purpose that accidents may be prevented and the safety of the public promoted.

(b) Whenever the commission orders in any proceeding before it, regardless of by whom or how such proceeding was commenced, that automatic or other safety appliance signals or devices be installed, reconstructed, or improved and operated at any crossing at grade of any public highway or road over the tracks of any railroad corporation, the commission shall also determine and order, after notice and hearing, how the cost of installing, reconstructing, or improving such signals or devices shall be divided between and paid by the interested railroad corporation whose tracks are located at the crossing on the one hand and the chief engineer and the interested city, city and county, town, county, or other political subdivision of the state on the other hand. In determining how much of the cost shall be paid by the railroad corporation, consideration shall be given to the benefit, if any, that will accrue from the signals or devices to the railroad corporation, but in every case the part to be paid by the railroad corporation shall be not less than twenty percent of the total cost of the signals or devices at any crossing, and the orders shall provide that every signal or device installed will be maintained by the railroad corporation for the life of the crossing to be so signalized. In order to compensate for the use of the crossings by the public generally, the commission shall also order that such part of the cost of installing, reconstructing, or improving the signals or devices as will not be paid by the railroad corporation be divided between the highway-rail crossing signalization fund and the city, town, city and county, county, or other political subdivision in which the crossing is located, and the commission shall fix in each case the amount to be paid from the highway-rail crossing signalization fund and the amount to be paid by the city, town, city and county, county, or other political subdivision. Any order of the commission under this section for the payment of any part of any such costs from the highway-rail crossing signalization fund is authority for the state treasurer to pay out of said fund to the person, firm, or corporation entitled thereto under the commission's order the amount so determined to be paid from said fund. The requirement of notice and hearing in this section is deemed to have been complied with by the commission's giving notice of and holding a hearing upon the question of whether any such signals or devices are required at any crossing; but in such cases the notice shall state that the question of how the costs will be borne and paid will be considered at and determined as a result of the hearing for which the notice is given. This paragraph (b) shall not apply to any grade crossing when all or any part of the cost of the installation, reconstruction, or improvement of the signals or devices at the crossing will be paid from funds available under any federal or federal-aid highway act.

(3) (a) (I) The commission also has power upon its own motion or upon complaint and after hearing, of which all the parties in interest including the owners of adjacent property shall have due notice, to order any crossing constructed at grade or at the same or different levels to be relocated, altered, or abolished, according to plans and specifications to be approved and upon just and reasonable terms and conditions to be prescribed by the commission, and to prescribe the terms upon which the separation should be made and the proportion in which the expense of the alteration or abolition of the crossing or the separation of the grade should be divided between the railroad corporations affected or between the corporation and the state, county, municipality, or public authority in interest.

(II) Notwithstanding the provisions of subparagraph (I) of this paragraph (a), the affected railroad corporation, the commission, the department of transportation, or the local government responsible for supervising and maintaining the intersecting public highway or road may abolish any crossing at grade of any public highway or road over the tracks of a corporation if:

(A) The crossing is without gates, signals, alarm bells, or warning personnel and is located within one-quarter mile of a crossing with gates, signals, alarm bells, or warning personnel or a separated grade crossing;

(B) The crossing is not the only crossing that provides access to property;

(C) No less than sixty days prior to the proposed abolition date, the railroad corporation, commission, department of transportation, or local government posts conspicuous notice of the proposed abolition at the crossing and gives written notice of the proposed abolition to all other entities authorized to initiate abolition of the crossing pursuant to this subparagraph (II); and

(D) Neither any entity given notice nor any other interested party files an objection to the abolition pursuant to subparagraph (III) of this paragraph (a).

(III) A crossing shall not be abolished pursuant to subparagraph (II) of this paragraph (a) if an entity given notice pursuant to sub-subparagraph (C) of subparagraph (II) of this paragraph (a) or any other interested party, within sixty days of receiving such notice, files with the commission and provides to the entity that gave notice of the proposed abolition a written objection to the abolition. The written objection shall include a statement by a professional engineer licensed to practice in Colorado that indicates that the engineer is familiar with the requirements of subparagraph (II) of this paragraph (a) and all relevant aspects of the crossing and has examined the crossing and believes that it is safe as designed. However, nothing in this subparagraph (III) shall preclude the abolition of the crossing pursuant to subparagraph (I) of this paragraph (a).

(b) (I) (A) The commission is authorized to approve individual projects wherein the allocation of the total expenses of the separation of grades to be paid by the railroad corporation or railroad corporations may exceed two million five hundred thousand dollars. The commission may approve more than one project, the sum totals of which may exceed the two-million-five- hundred-thousand-dollar cap set forth in this subparagraph (I), but in no event shall an individual class I railroad corporation pay more than two million five hundred thousand dollars of the cost of a single project or the cost of more than one project in any calendar year. Nothing in this subparagraph (I) shall preclude any railroad corporation from voluntarily contributing more than its allotted share for grade separation construction in one year, and, in such event, all amounts contributed by such railroad exceeding its allotted share in any one year shall be credited to and shall serve to reduce any payment for grade separation construction expenses by that railroad in subsequent years.

(B) Repealed.

(II) If the cost of a project is such that it calls for payment by a railroad corporation in more than one calendar year or if the amount due from the railroad corporation exceeds two million five hundred thousand dollars and thus must be made in consecutive calendar years, nothing in this section shall be construed to require that the approved project must be subjected to reapplication or rereview by the commission.

(III) In determining how much of the total expense of the separation of grades shall be paid by the railroad corporation or railroad corporations and by the state, county, municipality, or public authority in interest, consideration shall be given to the benefits, if any, which accrue from the grade separation project and the responsibility for need, if any, for such project. The railroad corporation or railroad corporations and the state, county, municipality, or public authority in interest shall share the costs for that portion of the project which separates the grades and constructs the approaches thereto. The commission shall consider the costs of obtaining rights-of-way, the costs of construction, and the costs of engineering. To the extent that the requirements of the railroad corporation or railroad corporations and the state, county, municipality, or public authority in interest generate additional costs beyond that necessary to provide the grade separation, such costs shall be borne by the responsible entity.

(IV) This paragraph (b) shall not apply to any project for the elimination of hazards at any railway-highway crossing when all or any part of the cost of such project will be paid from moneys made available for expenditure under title 23, U.S.C.; except that any amount paid by a railroad corporation for such an exempt project shall be credited against the two-million-five- hundred-thousand-dollar cap set forth in subparagraph (I) of this paragraph (b).

(c) (I) The state, county, municipality, or public authority, at its discretion, may withdraw its request for allocation determination at any time prior to the issue of the final order of the commission.

(II) The state, county, municipality, or public authority, at its discretion, after the hearing and prior to final order of the commission, may make a motion for a declaratory ruling on the cost allocation. In response to such a request, the commission shall make a declaratory ruling and shall provide the movant reasonable time to withdraw the request for allocation determination.

(III) After the final order is issued, the project shall proceed, unless the commission revises the order after consideration of a request for change by the state, county, municipality, or public authority in interest.

(d) The commission shall not order the abolition of any crossing for which a grade separation is determined to be necessary until this separation is constructed. (e) and (f) Repealed.

(4) Repealed.

Source: L. 13: p. 478, § 29. L. 17: p. 415, § 1. C.L. § 2940. CSA: C. 137, § 30. L. 41: p. 602, § 1. L. 43: p. 476, § 1. CRS 53: § 115-4-6. L. 55: p. 698, § 1. L. 63: p. 758, § 1. C.R.S. 1963: § 115-4-6. L. 65: p. 926, § 1. L. 69: pp. 935, 964, §§ 24, 75. L. 72: p. 615, § 144. L. 80:

(4) added, p. 750, § 1, effective April 16. L. 81: (1) amended, p. 1918, § 1, effective June 19. L. 83: (3) amended, p. 1558, § 1, effective July 1. L. 86: (3)(b) and (3)(c) R&RE and (3)(e) and

(3)(f) repealed, pp. 1157, 1158, §§ 1, 2, effective July 1. L. 91: (2)(b) amended, p. 1075, § 62, effective July 1. L. 93: (3)(b)(I)(B) repealed, p. 2063, § 15, effective July 1. L. 99: (3)(b)(I), (3)(b)(II), and (3)(b)(IV) amended, p. 140, § 1, effective August 4. L. 2003: (2)(b) amended, p. 1702, § 11, effective May 14. L. 2007: (3)(a) amended, p. 313, § 1, effective August 3. L. 2008:

(2) amended, p. 1794, § 12, effective July 1. L. 2015: (2)(b) amended, (HB 15-1209), ch. 64, p. 173, § 2, effective March 30. L. 2019: (1) amended, (SB 19-236), ch. 359, p. 3311, § 14, effective May 30.

Editor's note: Subsection (4)(b) provided for the repeal of subsection (4), effective July 1, 1982. (See L. 80, p. 750.)

Cross references: For liability under provisions of subsection (2) of this section, see § 43-4-216; for rule-making procedures, see article 4 of title 24.

The 9 cases that cite Colo. Rev. Stat. § 40-4-106 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 40-4-106 37×subsections: (3) 9× (2)(b) 2×cited by 41 cases
Where it cites § 40-4-106
“XX, § 6 over the construction and apportionment of costs for viaducts within a .home-rule municipality.”
The case’s holding
A state statute supersedes a home-rule city charter provision when the construction and cost apportionment of railroad-highway viaducts is a matter of mixed local and state-wide concern.
Later courts cite it for
“considerable interest in the construction of railroad-highway crossings within its municipal limits.” · 1 citing court
cites § 40-4-106 64×subsections: (3)(c)(II) 14× (3)(c)(I) 12× (3)(b) 8× (3)(c) 8×cited by 11 cases
Where it cites § 40-4-106
“1569, codified as subsections (3)(b) and (3)(c) of section 40-4-106. These subsections were approved June 10, 1983, and made effective July 1, 1983.”
cites § 40-4-106 11×subsections: (2)(b) 6× (2)(a) 5×cited by 18 cases
Where it cites § 40-4-106
“” Section 40-4-106(2)(a), C.R.S. 1973. Further, whenever the PUC orders the installation of safety devices at railroad crossings, it must order the railroad corporation to maintain the equipment and to pay “not less than ten percent” of the total cost of *267 installing the…”
Later courts cite it for
“we adhere to the proposition that the legislature contemplated that the reviewing court, since it does not have the aid of a staff and the expertise of the puc, should not undertake to duplicate the evaluation and judgment processes followed by the puc in arriving at its decision.” · 2 citing courts
4
GREENCity of Craig v. PUC of State of Colo., 656 P.2d 1313 (Colo. 1983).
cites § 40-4-106 15×subsections: (3) 6×cited by 9 cases
Where it cites § 40-4-106
“The district court held that Craig's authority under sections 31-15-501 and 31-15-706 is limited to a determination of the points of crossing which Craig deems to be in its best interests, subject to the overriding authority vested in the PUC by section 40-4-106, C.”
5
GREENMountain View Elec. Ass'n v. Pub. Utils. Comm'n, 686 P.2d 1336 (Colo. 1984).
cites § 40-4-106 12×subsections: (1) 12×cited by 9 cases
Where it cites § 40-4-106
“In addition, section 40-4-106(1), 17 C.R.S. (1973) states: The commission shall have power, after hearing on its own motion or upon complaint, to make general or special orders, rules, or regulations or otherwise to require each public utility to maintain and operate its .”
Later courts cite it for
“make general or special orders, rules or regulations or otherwise to require each public utility to maintain and operate its ... electrical wires ... in such manner as to promote and safeguard the health and safety of ... the public” · 1 citing court
cites § 40-4-106 4×cited by 15 cases
Where it cites § 40-4-106
“The trial court granted Highways’ condemnation of a private crossing over the Railroad’s property based on its conclusion that the crossing was for a private way of necessity and, as such, was not subject to the jurisdiction of the Public Utilities Commission (PUC) in accord…”
cites § 40-4-106 2×subsections: (2) 2×cited by 3 cases
Where it cites § 40-4-106
“The statute provides, in part: "(b) Whenever the public utilities commission orders in any proceeding before it, regardless of by whom or how such proceeding was commenced, that automatic or other safety appliance signals or devices be installed, reconstructed, or improved, and…”
8
NO FLAGCity of Craig v. Pub. Utils. Comm'n, 656 P.2d 1309 (Colo. 1983).
cites § 40-4-106 11×subsections: (3) 4×
Where it cites § 40-4-106
“The district court held that Craig’s authority under sections 31-15-501 and 31-15-706 is limited to a determination of the points of crossing which Craig deems to be in its best interests, subject to the overriding authority vested in the PUC by section 40-4-106, C.”
9
GREENBuck v. Dist. Court for the Cnty. of Kiowa, 608 P.2d 350 (Colo. 1980).
cites § 40-4-106 3×cited by 30 cases
Where it cites § 40-4-106
“The trial court was therefore correct in concluding that the railroad possesses statutory authority for the condemnation of lands outside its statutory right-of-way for the proposed construction of dust levees. III. As their final argument, the petitioners contend that approval…”
The case’s holding
Railroad corporations may condemn private property outside their standard right-of-way for facilities that maintain a sufficiently direct functional relationship to railroad operations.
Later courts cite it for
“private property may not be condemned, even for a purpose which is judicially determined to be a public use within the meaning of colo. const. art. ii, sec. 15, in the absence of express or necessarily implied statutory condemnation authority.” · 1 citing court

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197619831990

One bar per year. Tallest: 3 cases in 1983. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By subsection
(1)1 case
Mountain View Elec. Ass'n v. Pub. Utils. Comm'n, 686 P.2d 1336 (Colo. 1984).“In addition, section 40-4-106(1), 17 C.R.S. (1973) states: The commission shall have power, after hearing on its own motion or upon complaint, to make general or special orders, rules, or regulations or otherwise to require each public utility to maintain and operate its .”
(2)1 case
Atchison, Topeka & Santa Fe Ry. Co. v. Pub. Utils. Comm'n, 547 P.2d 234 (Colo. 1976).“The statute provides, in part: "(b) Whenever the public utilities commission orders in any proceeding before it, regardless of by whom or how such proceeding was commenced, that automatic or other safety appliance signals or devices be installed, reconstructed, or improved, and…”
(2)(a)1 case
Atchison, Topeka & Santa Fe Ry. Co. v. Pub. Utils. Comm'n, 572 P.2d 138 (Colo. 1977).“” Section 40-4-106(2)(a), C.R.S. 1973. Further, whenever the PUC orders the installation of safety devices at railroad crossings, it must order the railroad corporation to maintain the equipment and to pay “not less than ten percent” of the total cost of *267 installing the…”
(2)(b)2 cases
Denver & Rio Grande W. R.R. v. City & Cnty. of Denver, 673 P.2d 354 (Colo. 1983).“XX, § 6 over the construction and apportionment of costs for viaducts within a .home-rule municipality.”
(3)3 cases
City of Craig v. PUC of State of Colo., 656 P.2d 1313 (Colo. 1983).“The district court held that Craig's authority under sections 31-15-501 and 31-15-706 is limited to a determination of the points of crossing which Craig deems to be in its best interests, subject to the overriding authority vested in the PUC by section 40-4-106, C.”
City of Craig v. Pub. Utils. Comm'n, 656 P.2d 1309 (Colo. 1983).“The district court held that Craig’s authority under sections 31-15-501 and 31-15-706 is limited to a determination of the points of crossing which Craig deems to be in its best interests, subject to the overriding authority vested in the PUC by section 40-4-106, C.”
(3)(b)1 case
Atchison, Topeka & Santa Fe Ry. Co. v. Pub. Utils. Comm'n, 763 P.2d 1037 (Colo. 1988).“1569, codified as subsections (3)(b) and (3)(c) of section 40-4-106. These subsections were approved June 10, 1983, and made effective July 1, 1983.”
(3)(c)1 case
(3)(c)(I)1 case
(3)(c)(II)1 case
(3)(c)(III)1 case
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: C.R.S. 2024: the 2025 and 2026 sessions are not included. Syfert holds no earlier or later version of this section.