TITLE 25
FIRE PROTECTION AND SAFETY
Section 11. Fire Protection Sprinkler Contractors, 25-11-1 through 25-11-19.
ARTICLE 2
AIRPORT FIREFIGHTERS
25-11-9. Review of water-based fire protection shop drawings.
-
Water-based fire protection shop drawings shall be reviewed for code compliance with the state minimum standards by a certificate of competency holder.
-
The reviewing certificate holder's signature, printed name, and certificate number indicating such compliance shall be indicated on submitted plans.
-
Noncode compliance dictated by bid documents shall be reported by means prescribed by the rules and regulations promulgated pursuant to this chapter.
(Code 1981, §25-11-9, enacted by Ga. L. 1997, p. 1698, § 1.)
Editor's notes.
- Ga. L. 1997, p. 1698,
§
1, effective July 1, 1997, renumbered former Code Section 25-11-9 as present Code Section 25-11-15.