TITLE 8
BUILDINGS AND HOUSING
Section 2. Standards and Requirements for Construction, Alteration, Etc., of Buildings and Other Structures, 8-2-1 through 8-2-222.
ARTICLE 2
FACTORY BUILT BUILDINGS AND DWELLING UNITS
8-2-164. License required; permit purchase.
During such time as the Commissioner has contracted or entered into cooperative agreements pursuant to his or her authority under Code Section 8-2-160.1:
-
Any installer performing any installation of a manufactured home or a mobile home in this state shall first obtain a license from the Commissioner; provided, however, that persons employed by or contracting with a licensed installer to perform installations shall not be required to obtain such license; and
-
In addition to the requirements of paragraph (1) of this Code section, any installer performing any installation of any new or pre-owned manufactured or mobile home in this state shall first purchase a permit from the Commissioner. The cost of such permit shall be $60.00 for each manufactured or mobile home. Each installer shall provide any information required by the Commissioner to be submitted to obtain a permit. A permit shall be attached by the installer to the panel box of each manufactured or mobile home upon completion of installation.
(Code 1981, §8-2-164, enacted by Ga. L. 1992, p. 2750, § 3; Ga. L. 2004, p. 607, § 2; Ga. L. 2010, p. 9, § 1-22/HB 1055.)