Except as otherwise provided by this Act, until January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $150,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties

Edition and currency
laws through the 2026 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2026 session (checked Sept. 2026) cited 1996–2021 22citing cases
(30 ILCS 550/1) (from Ch. 29, par. 15)
    (Text of Section before amendment by P.A. 104-168)
    Sec. 1. Except as otherwise provided by this Act, until January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $150,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. The amount of the bond shall be fixed by the officials, boards, commissions, commissioners or agents, and the bond, among other conditions, shall be conditioned for the completion of the contract, for the payment of material, apparatus, fixtures, and machinery used in the work and for all labor performed in the work, whether by subcontractor or otherwise.
    Until January 1, 2029, when making contracts for public works to be constructed, the Department of Transportation and the Illinois State Toll Highway Authority shall require every contractor for those works to furnish, supply, and deliver a bond to the Department or the Authority, as the case may be, with good and sufficient sureties only if the public works contract will cost more than $500,000. The Department of Transportation and the Illinois State Toll Highway Authority shall publicly display the following information by website or annual report and shall provide that information to interested parties upon request:
        (1) a list of each of its defaulted public works
    
contracts, including the value of the award, the adjusted contract value, and the amount remaining unpaid by the Department or Authority, as applicable;
        (2) the number and the aggregate amount of payment
    
claims made under the Mechanics Lien Act along with the number of contracts in which payment claims are made under the Mechanics Lien Act;
        (3) for each of its public improvement contracts,
    
regardless of the contract value, the aggregate annual revenue of the contractor derived from contracts with the State;
        (4) for each of its public works contracts,
    
regardless of contract value, the identity of the surety providing the contract bond, payment and performance bond, or both; and
        (5) for each of its public works contracts,
    
regardless of the bond threshold, a list of bidders for each public works contract, and the amount bid by each bidder.
    Until January 1, 2029, local governmental units may require a bond, by ordinance or resolution, for public works contracts valued at $150,000 or less.
    On and after January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $50,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. The amount of the bond shall be fixed by the officials, boards, commissions, commissioners or agents, and the bond, among other conditions, shall be conditioned for the completion of the contract, for the payment of material, apparatus, fixtures, and machinery used in the work and for all labor performed in the work, whether by subcontractor or otherwise.
    If the contract is for emergency repairs as provided in the Illinois Procurement Code, proof of payment for all labor, materials, apparatus, fixtures, and machinery may be furnished in lieu of the bond required by this Section.
    Each such bond is deemed to contain the following provisions whether such provisions are inserted in such bond or not:
    "The principal and sureties on this bond agree that all the undertakings, covenants, terms, conditions and agreements of the contract or contracts entered into between the principal and the State or any political subdivision thereof will be performed and fulfilled and to pay all persons, firms and corporations having contracts with the principal or with subcontractors, all just claims due them under the provisions of such contracts for labor performed or materials furnished in the performance of the contract on account of which this bond is given, when such claims are not satisfied out of the contract price of the contract on account of which this bond is given, after final settlement between the officer, board, commission or agent of the State or of any political subdivision thereof and the principal has been made.".
    Each bond securing contracts between the Capital Development Board or any board of a public institution of higher education and a contractor shall contain the following provisions, whether the provisions are inserted in the bond or not:
    "Upon the default of the principal with respect to undertakings, covenants, terms, conditions, and agreements, the termination of the contractor's right to proceed with the work, and written notice of that default and termination by the State or any political subdivision to the surety ("Notice"), the surety shall promptly remedy the default by taking one of the following actions:
        (1) The surety shall complete the work pursuant to a
    
written takeover agreement, using a completing contractor jointly selected by the surety and the State or any political subdivision; or
        (2) The surety shall pay a sum of money to the
    
obligee, up to the penal sum of the bond, that represents the reasonable cost to complete the work that exceeds the unpaid balance of the contract sum.
    The surety shall respond to the Notice within 15 working days of receipt indicating the course of action that it intends to take or advising that it requires more time to investigate the default and select a course of action. If the surety requires more than 15 working days to investigate the default and select a course of action or if the surety elects to complete the work with a completing contractor that is not prepared to commence performance within 15 working days after receipt of Notice, and if the State or any political subdivision determines it is in the best interest of the State to maintain the progress of the work, the State or any political subdivision may continue to work until the completing contractor is prepared to commence performance. Unless otherwise agreed to by the procuring agency, in no case may the surety take longer than 30 working days to advise the State or political subdivision on the course of action it intends to take. The surety shall be liable for reasonable costs incurred by the State or any political subdivision to maintain the progress to the extent the costs exceed the unpaid balance of the contract sum, subject to the penal sum of the bond.".
    The surety bond required by this Section may be acquired from the company, agent or broker of the contractor's choice. The bond and sureties shall be subject to the right of reasonable approval or disapproval, including suspension, by the State or political subdivision thereof concerned. Except as otherwise provided in this Section, in the case of State construction contracts, a contractor shall not be required to post a cash bond or letter of credit in addition to or as a substitute for the surety bond required by this Section.
    Prior to the completion of 50% of the contract for public works, a local governmental unit may not withhold retainage from any payment to a contractor who furnishes the bond or bond substitute required by this Act in an amount in excess of 10% of any payment made prior to the date of completion of 50% of the contract for public works. When a contract for public works is 50% complete, the local governmental unit shall reduce the retainage so that no more than 5% is held. After the contract is 50% complete, no more than 5% of the amount of any subsequent payments made under the contract for public works may be withheld as retainage.
    Prior to the completion of 50% of the contract for public works, the contractor and their respective subcontractors shall not withhold from their subcontractors retainage in excess of 10% of any payment made prior to the date of completion of 50% of the contract for public works. When the contract for public works is 50% complete, the contractor and its subcontractors shall reduce the retainage so that no more than 5% is withheld from their respective subcontractors. After the contract is 50% complete, the contractor and its subcontractors shall not withhold more than 5% of the amount of any subsequent payments made under the contract to their respective subcontractors.
    When other than motor fuel tax funds, federal-aid funds, or other funds received from the State are used, a political subdivision may allow the contractor to provide a non-diminishing irrevocable bank letter of credit, in lieu of the bond required by this Section, on contracts under $100,000 to comply with the requirements of this Section. Any such bank letter of credit shall contain all provisions required for bonds by this Section.
    In order to reduce barriers to entry for diverse and small businesses, the Department of Transportation may implement a 5-year pilot program to allow a contractor to provide a non-diminishing irrevocable bank letter of credit in lieu of the bond required by this Section on contracts under $500,000. Projects selected by the Department of Transportation for this pilot program must be classified by the Department as low-risk scope of work contracts. The Department shall adopt rules to define the criteria for pilot project selection and implementation of the pilot program.
    In this Section:
    "Local governmental unit" has the meaning ascribed to it in Section 2 of the Local Government Prompt Payment Act.
    "Material", "labor", "apparatus", "fixtures", and "machinery" include those rented items that are on the construction site and those rented tools that are used or consumed on the construction site in the performance of the contract on account of which the bond is given.
(Source: P.A. 102-968, eff. 1-1-23; 103-570, eff. 1-1-24.)
 
    (Text of Section after amendment by P.A. 104-168)
    Sec. 1. Except as otherwise provided by this Act, until January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $150,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. The amount of the bond shall be fixed by the officials, boards, commissions, commissioners or agents, and the bond, among other conditions, shall be conditioned for the completion of the contract, for the payment of material, apparatus, fixtures, and machinery used in the work and for all labor performed in the work, whether by subcontractor or otherwise.
    Until January 1, 2029, when making contracts for public works to be constructed, the Department of Transportation and the Illinois State Toll Highway Authority shall require every contractor for those works to furnish, supply, and deliver a bond to the Department or the Authority, as the case may be, with good and sufficient sureties only if the public works contract will cost more than $500,000. The Department of Transportation and the Illinois State Toll Highway Authority shall publicly display the following information by website or annual report and shall provide that information to interested parties upon request:
        (1) a list of each of its defaulted public works
    
contracts, including the value of the award, the adjusted contract value, and the amount remaining unpaid by the Department or Authority, as applicable;
        (2) the number and the aggregate amount of payment
    
claims made under the Mechanics Lien Act along with the number of contracts in which payment claims are made under the Mechanics Lien Act;
        (3) for each of its public improvement contracts,
    
regardless of the contract value, the aggregate annual revenue of the contractor derived from contracts with the State;
        (4) for each of its public works contracts,
    
regardless of contract value, the identity of the surety providing the contract bond, payment and performance bond, or both; and
        (5) for each of its public works contracts,
    
regardless of the bond threshold, a list of bidders for each public works contract, and the amount bid by each bidder.
    Until January 1, 2029, local governmental units may require a bond, by ordinance or resolution, for public works contracts valued at $150,000 or less.
    On and after January 1, 2029, all officials, boards, commissions, or agents of this State, or of any political subdivision thereof, in making contracts for public work of any kind costing over $50,000 to be performed for the State, or of any political subdivision thereof, shall require every contractor for the work to furnish, supply and deliver a bond to the State, or to the political subdivision thereof entering into the contract, as the case may be, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. The amount of the bond shall be fixed by the officials, boards, commissions, commissioners or agents, and the bond, among other conditions, shall be conditioned for the completion of the contract, for the payment of material, apparatus, fixtures, and machinery used in the work and for all labor performed in the work, whether by subcontractor or otherwise.
    If the contract is for emergency repairs as provided in the Illinois Procurement Code, proof of payment for all labor, materials, apparatus, fixtures, and machinery may be furnished in lieu of the bond required by this Section.
    Each such bond is deemed to contain the following provisions whether such provisions are inserted in such bond or not:
    "The principal and sureties on this bond agree that all the undertakings, covenants, terms, conditions and agreements of the contract or contracts entered into between the principal and the State or any political subdivision thereof will be performed and fulfilled and to pay all persons, firms and corporations having contracts with the principal or with subcontractors, all just claims due them under the provisions of such contracts for labor performed or materials furnished in the performance of the contract on account of which this bond is given, when such claims are not satisfied out of the contract price of the contract on account of which this bond is given, after final settlement between the officer, board, commission or agent of the State or of any political subdivision thereof and the principal has been made.".
    Each bond securing contracts between the Capital Development Board or any board of a public institution of higher education and a contractor shall contain the following provisions, whether the provisions are inserted in the bond or not:
    "Upon the default of the principal with respect to undertakings, covenants, terms, conditions, and agreements, the termination of the contractor's right to proceed with the work, and written notice of that default and termination by the State or any political subdivision to the surety ("Notice"), the surety shall promptly remedy the default by taking one of the following actions:
        (1) The surety shall complete the work pursuant to a
    
written takeover agreement, using a completing contractor jointly selected by the surety and the State or any political subdivision; or
        (2) The surety shall pay a sum of money to the
    
obligee, up to the penal sum of the bond, that represents the reasonable cost to complete the work that exceeds the unpaid balance of the contract sum.
    The surety shall respond to the Notice within 15 working days of receipt indicating the course of action that it intends to take or advising that it requires more time to investigate the default and select a course of action. If the surety requires more than 15 working days to investigate the default and select a course of action or if the surety elects to complete the work with a completing contractor that is not prepared to commence performance within 15 working days after receipt of Notice, and if the State or any political subdivision determines it is in the best interest of the State to maintain the progress of the work, the State or any political subdivision may continue to work until the completing contractor is prepared to commence performance. Unless otherwise agreed to by the procuring agency, in no case may the surety take longer than 30 working days to advise the State or political subdivision on the course of action it intends to take. The surety shall be liable for reasonable costs incurred by the State or any political subdivision to maintain the progress to the extent the costs exceed the unpaid balance of the contract sum, subject to the penal sum of the bond.".
    The surety bond required by this Section may be acquired from the company, agent or broker of the contractor's choice. The bond and sureties shall be subject to the right of reasonable approval or disapproval, including suspension, by the State or political subdivision thereof concerned. Except as otherwise provided in this Section, in the case of State construction contracts, a contractor shall not be required to post a cash bond or letter of credit in addition to or as a substitute for the surety bond required by this Section.
    Prior to the completion of 50% of the contract for public works, the State or a local governmental unit, except for the Department of Transportation, may not withhold retainage from any payment to a contractor who furnishes the bond or bond substitute required by this Act in an amount in excess of 10% of any payment made prior to the date of completion of 50% of the contract for public works. When a contract for public works is 50% complete, the State or the local governmental unit, except for the Department of Transportation, shall reduce the retainage so that no more than 5% is held. After the contract is 50% complete, no more than 5% of the amount of any subsequent payments made under the contract for public works may be withheld as retainage.
    Subject to the limitations in this Section, a State agency may withhold as retainage a portion of the moneys from the payment of a contract that is entered into on or after the effective date of this amendatory Act of the 104th General Assembly if and only if the State agency determines that satisfactory progress has not been achieved by a contractor or subcontractor during any period for which a payment is to be made. Satisfactory progress shall be clearly provided for in the contract between the State agency and the contractor or subcontractor. Retainage may not be used as a substitute for good contract management, and the State agency may not withhold funds without cause. Determinations to retain and the specific amount to be withheld must be made by the State agency on a case-by-case basis based on the performance of milestones under the current contract as provided for in the contract between the State agency and the contractor. A contractor may not withhold retainage from a subcontractor except to the extent a State agency has withheld retainage from the contractor which is attributable to that subcontractor's subcontract. This paragraph does not apply to the Illinois State Toll Highway Authority.
    Prior to the completion of 50% of the contract for public works, the contractor and their respective subcontractors shall not withhold from their subcontractors retainage in excess of 10% of any payment made prior to the date of completion of 50% of the contract for public works. When the contract for public works is 50% complete, the contractor and its subcontractors shall reduce the retainage so that no more than 5% is withheld from their respective subcontractors. After the contract is 50% complete, the contractor and its subcontractors shall not withhold more than 5% of the amount of any subsequent payments made under the contract to their respective subcontractors.
    When other than motor fuel tax funds, federal-aid funds, or other funds received from the State are used, a political subdivision may allow the contractor to provide a non-diminishing irrevocable bank letter of credit, in lieu of the bond required by this Section, on contracts under $100,000 to comply with the requirements of this Section. Any such bank letter of credit shall contain all provisions required for bonds by this Section.
    In order to reduce barriers to entry for diverse and small businesses, the Department of Transportation may implement a 5-year pilot program to allow a contractor to provide a non-diminishing irrevocable bank letter of credit in lieu of the bond required by this Section on contracts under $500,000. Projects selected by the Department of Transportation for this pilot program must be classified by the Department as low-risk scope of work contracts. The Department shall adopt rules to define the criteria for pilot project selection and implementation of the pilot program.
    In this Section:
    "Local governmental unit" has the meaning ascribed to it in Section 2 of the Local Government Prompt Payment Act.
    "Material", "labor", "apparatus", "fixtures", and "machinery" include those rented items that are on the construction site and those rented tools that are used or consumed on the construction site in the performance of the contract on account of which the bond is given.
    "Retainage" means a portion of money withheld from a payment, including, but not limited to, a payment as defined in the Local Government Prompt Payment Act or the State Prompt Payment Act, made to a contractor or subcontractor intended to ensure that the contractor or subcontractor completes the requirements of the contract or subcontract. "Retainage" does not include (i) moneys withheld due to violations of local, State, or federal laws or (ii) moneys withheld from grants to entities for capital improvements to non-State property.
    Nothing in this amendatory Act of the 104th General Assembly may be construed to modify any provision of the State Prompt Payment Act or the Local Government Prompt Payment Act.
(Source: P.A. 103-570, eff. 1-1-24; 104-168, eff. 6-1-27.)

    
The 20 cases that cite 30 ILCS 550/1 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 30 ILCS 550/1 9×cited by 40 cases
Where it cites § 30 ILCS 550/1
“The appellate court affirmed, holding that the Village breached the subject contracts by violating section 1 of the Public Construction Bond Act (Bond Act) (30 ILCS 550/1 (West 2008)). 2013 IL App (2d) 120474, ¶¶ 39-40 .”
The case’s holding
A public construction bond is deemed by statute to contain completion and payment provisions for subcontractors even if the bond does not expressly include them.
2
GREENShaw Indus., Inc. v. Cmty. Coll. Dist. No. 515, 741 N.E.2d 642 (Ill. App. Ct. 1st Dist. 2000).
cites § 30 ILCS 550/1 8×cited by 9 cases
Where it cites § 30 ILCS 550/1
“(PSA), pursuant to the Illinois Public Construction Bond Act (30 ILCS 550/1 et seq. (West 1998)) (Bond Act).”
Later courts cite it for
“compliance with the limitation period in section 2 of the bond act is a jurisdictional requirement.” · 1 citing court
3
GREENWalker Process Equip. v. Advance Mech. Sys., Inc., 668 N.E.2d 132 (Ill. App. Ct. 1st Dist. 1996).
cites § 30 ILCS 550/1 6×cited by 10 cases
Where it cites § 30 ILCS 550/1
“(Advance), seeking: (1) an accounting pursuant to section 23 of the Mechanics Lien Act (770 ILCS 60/23 (West 1992)); (2) relief pursuant to the Public Construction Bond Act (30 ILCS 550/1 et seq. (West 1992)); and (3) relief for a breach of contract.”
4
GREENLake Cnty. Grading Co. v. Vill. of Antioch, 2014 IL 115805, 19 N.E.3d 615.
cites § 30 ILCS 550/1 7×cited by 4 casesunpublished
Where it cites § 30 ILCS 550/1
“The appellate court affirmed, holding that the Village breached the subject contracts by violating section 1 of the Public Construction Bond Act (Bond Act) (30 ILCS 550/1 (West 2008)). 2013 IL App (2d) 120474, ¶¶ 39-40 .”
5
REDLake Cnty. Grading Co. v. Vill. of Antioch, 2013 IL App (2d) 120474, 985 N.E.2d 638.
cites § 30 ILCS 550/1 5×cited by 5 cases
Reversed by Lake County Grading Co. v. Village of Antioch (2014): the Illinois Supreme Court's own opinion in this case.
Where it cites § 30 ILCS 550/1
“30 ILCS 550/1 (West 2010). Neumann defaulted on its contract with the Village and also failed to pay plaintiff, Lake County Grading Co.”
6
GREENArdon Elec. Co. v. Winterset Constr. Inc., 820 N.E.2d 21 (Ill. App. Ct. 1st Dist. 2004).
cites § 30 ILCS 550/1 2×cited by 17 cases
Where it cites § 30 ILCS 550/1
“Bond Act Section 1 of the Bond Act (30 ILCS 550/1 (West 1998)) provides: “Except as otherwise provided by this Act, all officials, boards, commissions or agents of this State, or of any political subdivision thereof in making contracts for public work of any kind to be performed…”
7
GREENWilliam J. Templeman Co. v. United States Fid. & Guar. Co., 317 Ill. App. 3d 764 (Ill. App. Ct. 1st Dist. 2000).
cites § 30 ILCS 550/1 2×cited by 15 cases
Where it cites § 30 ILCS 550/1
“The trial court granted summary judgment to USF&G, finding that an unverified letter dated May 7, 1987, from Premier to USF&G which did not state an amount was not a notice of claim within the meaning of section 2 of the Illinois Public Construction Bond Act (30 ILCS 550/1 et…”
8
GREENCarroll Seating Co. JJL v. Verdico, 861 N.E.2d 1045 (Ill. App. Ct. 1st Dist. 2006).
cites § 30 ILCS 550/1 3×cited by 4 cases
Where it cites § 30 ILCS 550/1
“As required by section 1 of the Public Construction Bond Act (Bond Act) (30 ILCS 550/1 (West 2002)), Verdico posted a payment bond for the project, with Travelers Casualty and Surety Company of America (Travelers) acting as the surety for the bond.”
9
GREENSacramento Crushing Corp. v. Correct/All Sewer, Inc., 742 N.E.2d 829 (Ill. App. Ct. 1st Dist. 2000).
cites § 30 ILCS 550/1 1×cited by 32 cases
Where it cites § 30 ILCS 550/1
“Nine subcontractors and/or material suppliers filed complaints against Cox and Correct/All for mechanics’ liens against public funds pursuant to section 23 of the Mechanics Lien Act (770 ILCS 60/23 (West 1998)) and for bond claims against Fidelity and Cox pursuant to section 1…”
The case’s holding
A party opposing summary judgment cannot create a genuine issue of material fact through unsupported suggestions; without supporting evidence such as counter-affidavits, such assertions are insufficient to defeat summary judgment.
Later courts cite it for
“the suggestion that an issue of material fact exists, without supporting evidence, is insufficient to create one.” · 5 citing courts
10
GREENIn re Petroleum Piping Contractors, Inc., 211 B.R. 290 (Bankr. N.D. Ind. 1997).
cites § 30 ILCS 550/1 3×cited by 5 cases
Where it cites § 30 ILCS 550/1
“(c) Pursuant to Sections 770 ILCS 60/23 and 30 ILCS 550/1 and 2 of the Illinois Compiled Statutes, WaterPro has filed a Mechanics’ Lien claim against the project funds and a claim against the payment bond submitted by Semford Contracting and United States Fidelity and Guaranty…”
cites § 30 ILCS 550/1 1×cited by 6 casesunpublished
Where it cites § 30 ILCS 550/1
“¶ 11 The complaint alleged that, on July 24, 2009, plaintiffs served Nicholas, KMC, and Kaneland School District with a notice of a lien claim on a public improvement (see 770 ILCS 60/23 (West 2010)) and a bond claim (see 30 ILCS 550/1, 2 (West 2010)). At the time of the notice,…”
12
GREENState ex rel. Chemco Indus., Inc. v. Employers Mut. Cas. Co., 708 N.E.2d 1224 (Ill. App. Ct. 4th Dist. 1999).
cites § 30 ILCS 550/1 1×cited by 4 cases
Where it cites § 30 ILCS 550/1
“” 30 ILCS 550/1 (West 1994). Section 2 of the Bond Act provides, in relevant part: “Every person furnishing material or performing labor, either as an individual or as a sub-contractor for any contractor, with the State, or a political subdivision thereof where bond or letter of…”
13
GREENWilliam J. Templeman Co. v. US Fid. & Guar. Co., 739 N.E.2d 883 (Ill. App. Ct. 1st Dist. 2000).
cites § 30 ILCS 550/1 2×cited by 2 cases
Where it cites § 30 ILCS 550/1
“The trial court granted summary judgment to USF&G, finding that an unverified letter dated May 7, 1987, from Premier to USF&G which did not state an amount was not a notice of claim within the meaning of section 2 of the Illinois Public Construction Bond Act (30 ILCS 550/1 et…”
Later courts cite it for
“we are free to consider any pleadings, depositions, admissions, and affidavits on file at the time of the hearing regardless of whether facts contained therein were presented to the trial court in response to the motion for summary judgment.” · 4 citing courts
14
GREENCent. LABORERS' v. Nicholas & Assocs., 956 N.E.2d 609 (Ill. App. Ct. 2d Dist. 2011).
cites § 30 ILCS 550/1 1×cited by 2 cases
Where it cites § 30 ILCS 550/1
“¶ 11 The complaint alleged that, on July 24, 2009, plaintiffs served Nicholas, KMC, and Kaneland School District with a notice of a lien claim on a public improvement (see 770 ILCS 60/23 (West 2010)) and a bond claim (see 30 ILCS 550/1, 2 (West 2010)). At the time of the notice,…”
cites § 30 ILCS 550/1 7×cited by 0 casesunpublished
Where it cites § 30 ILCS 550/1
“The appellate court affirmed, holding that the Village breached the subject contracts by violating section 1 of the Public Construction Bond Act (Bond Act) (30 ILCS 550/1 (West 2008)). 2013 IL App (2d) 120474, ¶¶ 39-40 .”
16
GREENShaw Indus., Inc. v. Cmty. Coll. Dist. No. 515, No. 1-99-4076 Rel (Ill. App. Ct. 1st Dist. Dec. 12, 2000).
cites § 30 ILCS 550/1 7×cited by 0 cases
Where it cites § 30 ILCS 550/1
“(PSA), pursuant to the Illinois Public Construction Bond Act (30 ILCS 550/1 et seq. (West 1998)) (Bond Act).”
17
GREENArdon Elec. Co. v. Winterset Constr., Inc., No. 1-03-0957 Rel (Ill. App. Ct. 1st Dist. Nov. 2, 2004).
cites § 30 ILCS 550/1 2×cited by 0 cases
Where it cites § 30 ILCS 550/1
“Bond Act Section 1 of the Bond Act (30 ILCS 550/1 (West 1998)) provides: "Except as otherwise provided by this Act, all officials, boards, commissions or agents of this State, or of any political subdivision thereof in making contracts for public work of any kind to be performed…”
18
GREENCarroll Seating Co. v. Verdico J.J.L. Inc., No. 1-04-3026 & 1-04-3457 Rel (Ill. App. Ct. 1st Dist. Dec. 21, 2006).
cites § 30 ILCS 550/1 2×cited by 0 cases
Where it cites § 30 ILCS 550/1
“As required by section 1 of the Public Construction Bond Act (Bond Act) (30 ILCS 550/1 (West 2002)), Verdico posted a payment bond for the project, with Travelers Casualty and Surety Company of America (Travelers) acting as the surety for the bond.”
19
NO FLAGH.B.D. Constr., Inc. v. Eco Jazz, Inc., 2021 IL App (5th) 180187-U.
cites § 30 ILCS 550/1 1×cited by 0 casesunpublished
Where it cites § 30 ILCS 550/1
“Notice was given pursuant to both the lien on public funds law (770 ILCS 60/23 (West 2012)) and the Public Construction Bond Act (30 ILCS 550/1, 2 (West 2012)). Town & Country asserted that, under the contract, it was owed $955,181.”
20
NO FLAGWilliam J. Templeman Co. v. United States Fid. & Guar. Co. Modification of Sep. 14, 2000, No. 1-99-3043 Rel (Ill. App. Ct. 1st Dist. Nov. 16, 2000).
cites § 30 ILCS 550/1 2×cited by 0 cases
Where it cites § 30 ILCS 550/1
“The trial court granted summary judgment to USF&G, finding that an unverified letter dated May 7, 1987, from Premier to USF&G which did not state an amount was not a notice of claim within the meaning of section 2 of the Illinois Public Construction Bond Act (30 ILCS 550/1 et…”

Show all 22 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
199620082021

One bar per year. Tallest: 7 cases in 2000. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Ill. App. Ct.18Ill.3Bankr. N.D. Ind.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 22 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2026 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.