Mich. Comp. Laws § 460.554 (2026)

Data and information; specifications of construction; filing; height of lines; stenciling of poles; act subject to electric transmission line certification act.

Edition and currency
laws through the 2026 session (checked Aug. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2026 session (checked Aug. 2026) cited 1968–1999 4citing cases
At a glance

Courts have cited this section in 4 opinions since 1968.

TRANSMISSION OF ELECTRICITY


Act 106 of 1909


460.554 Data and information; specifications of construction; filing; height of lines; stenciling of poles; act subject to electric transmission line certification act.

Sec. 4.

    (1) If required by the commission, an electric utility erecting lines to transmit electricity in or through the highways, streets, or public places of 1 or more counties of this state shall prepare and file with the commission data and information concerning the method and manner of the construction of those lines, the franchise or consent under which those lines were constructed or are being maintained, and other information the commission reasonably requires. The commission may require the filing of detailed specifications covering the type of construction of transmission lines. The specifications shall show the details of construction of lines of various voltages. If the commission approves the specifications, all lines built by the electric utility shall be constructed according to the specifications. Transmission lines at all highway crossings shall be not less than 22 feet high and at railroad crossings shall be in accordance with the commission's rules made under authority of law. The commission may require all poles used in transmitting electricity to be stenciled or otherwise marked with the owner's name.

    (2) This act is subject to the electric transmission line certification act.

History: 1909, Act 106, Eff. Sept. 1, 1909 ;-- CL 1915, 4845 ;-- Am. 1921, Act 274, Eff. Aug. 18, 1921 ;-- Am. 1923, Act 93, Eff. Aug. 30, 1923 ;-- CL 1929, 11096 ;-- CL 1948, 460.554 ;-- Am. 1995, Act 33, Imd. Eff. May 17, 1995

The 4 cases that cite Mich. Comp. Laws § 460.554 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSchultz v. Consumers Power Co., 506 N.W.2d 175 (Mich. 1993).
cites § 460.554 2×cited by 134 cases
Where it cites § 460.554
“The line in question, of course, was more than 24 feet above the ground.”
The case’s holding
A utility company has an obligation to reasonably inspect and repair wires and other instrumentalities to discover and remedy hazards and defects.
Later courts cite it for
“a power company has an obligation to reasonably inspect and repair wires and other instrumentalities in order to discover and remedy hazards and defects.” · 10 citing courts
2
GREENConsumers Power Co. v. Pub. Serv. Comm'n, 596 N.W.2d 126 (Mich. 1999).
cites § 460.554 2×cited by 80 cases
Where it cites § 460.554
“MCL 460.554; MSA 22.154 authorizes the PSC to require that utilities submit information and data regarding the construction of lines in or through highways, streets, and public places.”
The case’s holding
An administrative agency lacks the authority to compel a utility to provide retail wheeling services without clear and unmistakable statutory language granting such specific power.
Later courts cite it for
“an agency inteipretation cannot overcome the plain meaning of a statute.” · 2 citing courts
3
GREENWilliams v. Detroit Edison Co., 234 N.W.2d 702 (Mich. Ct. App. 1975).
cites § 460.554 4×cited by 51 cases
Where it cites § 460.554
“152, MCLA 460.554; MSA 22.154 and 1954 AACS, R 460.”
The case’s holding
Implied warranty and strict liability in tort do not apply to products that have not yet been transferred out of the defendant's control.
Later courts cite it for
“the famous english case, rylands v. fletcher, 3 h c 774, 159 eng.rep. 737 (1865), rev'd, lr 1 ex. 265 (1866), aff'd, lr 3 hl 330 (1868).” · 2 citing courts
4
GREENDetroit Edison Co. v. City of Wixom, 159 N.W.2d 230 (Mich. Ct. App. 1968).
cites § 460.554 1×cited by 6 cases
Where it cites § 460.554
“NOTES [1] CL 1948, § 460.554 (Stat Ann § 22.154). [2] CL 1948, § 125.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196819831999

One bar per year. Tallest: 1 case in 1968. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Mich.2Mich. Ct. App.2
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.