Missouri Revised Statutes homeSearch Missouri
Mo. Rev. Stat.Chapter 290

Mo. Rev. Stat. § 290.230 (2026)

Prevailing wage rates required on construction of public works

Edition and currency
laws through the 2026 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2026 session (checked Sept. 2026) cited 1969–2021 16citing cases
At a glance

Courts have cited this section in 16 opinions since 1969, 1 of them in the last five years.

  290.230.  Prevailing wage rates required on construction of public works — who is deemed employed upon public works — inapplicability of prevailing wage, when. — 1.  (1)  Except as otherwise provided in this section, not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work.

  (2)  For all work performed on a Sunday or a holiday, not less than twice the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work.  For purposes of this subdivision, "holiday" shall include each of the following:

  (a)  January first;

  (b)  The last Monday in May;

  (c)  July fourth;

  (d)  The first Monday in September;

  (e)  November eleventh;

  (f)  The fourth Thursday in November; and

  (g)  December twenty-fifth;

­­

­

If any holiday falls on a Sunday, the following Monday shall be considered a holiday.

  (3)  For all overtime work performed, not less than one and one-half the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed or the public works contracting minimum wage, whichever is applicable, shall be paid to all workers employed by or on behalf of any public body engaged in the construction of public works, exclusive of maintenance work or contractual obligation.  For purposes of this subdivision, "overtime work" shall include work that exceeds ten hours in one day and work in excess of forty hours in one calendar week; and

  (4)  A thirty-minute lunch period on each calendar day shall be allowed for each worker on a public works project, provided that such time shall not be considered as time worked.

  2.  Only workers that are directly employed by contractors or subcontractors in actual construction work on the site of the building or construction job shall be deemed to be employed upon public works.

  3.  Any worker who agrees in writing to volunteer his or her labor without pay shall not be deemed to be employed upon public works, and shall not be entitled to the wage rates required pursuant to sections 290.210 to 290.340.  For the purposes of this section, the term "worker who agrees in writing to volunteer his or her labor without pay" shall mean a worker who volunteers his or her labor without any promise of benefit or remuneration for such voluntary activity, and who is not a prisoner in any jail or prison facility and who is not performing community service pursuant to disposition of a criminal case against him or her, and is not otherwise employed for compensation at any time in the construction or maintenance work on the same public works for which the worker is a volunteer.  Under no circumstances may an employer or a public body force, compel or otherwise intimidate a worker into performing work otherwise paid at a prevailing wage rate or at a public works contracting minimum wage rate as a volunteer.

  4.  When the hauling of materials or equipment includes some phase of construction other than the mere transportation to the site of the construction, workers engaged in this dual capacity shall be deemed employed directly on public works.

  5.  (1)  The provisions of sections 290.210 to 290.340 shall not apply to the construction of public works for which either the engineer's estimate or the bid accepted by the public body for the total project cost is in the amount of seventy-five thousand dollars or less.

  (2)  The total project cost shall be based upon the entire project and not individual projects within a larger project.

  (3)  The total project cost shall include the value of work performed on the project by every person paid by a contractor or subcontractor for that person's work on the project.  The total project cost shall additionally include all materials and supplies purchased for the project.

  6.  A public body shall not divide a project into multiple contracts for the purpose of lowering the total project cost below the threshold described in subsection 5 of this section.

  7.  For any public works project for which either the engineer's estimate or the bid accepted by the public body for the total project cost is in the amount of seventy-five thousand dollars or less that becomes subject to a change order that increases the total project cost in excess of seventy-five thousand dollars, the provisions of sections 290.210 to 290.340 shall apply only to that portion of the project that was in excess of seventy-five thousand dollars.

  8.  Notwithstanding any provision of law to the contrary, for the purposes of construction of public works for which either the engineer's estimate or the bid accepted by the public body for the total project cost is in the amount of ten thousand dollars or less for all occupational titles, public bodies shall be exempt from any law requiring the use of competitive bids.

­­--------

(L. 1957 p. 574 § 3, A.L. 2014 H.B. 1594, A.L. 2018 H.B. 1729, et al.)

The 16 cases that cite Mo. Rev. Stat. § 290.230 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENLong v. Interstate Ready-Mix, L.L.C., 83 S.W.3d 571 (Mo. Ct. App. 2002).
cites § 290.230 13×cited by 19 cases
Where it cites § 290.230
“020, was invalid *573 because it conflicted with § 290.230 of the Prevailing Wage Act. 1 Therefore, the trial court concluded that the appellants had not alleged any facts that entitled them to a judgment as a matter of law.”
Later courts cite it for
“due to the remedial nature of the act, we must interpret it broadly so as to accomplish the greatest public good.” · 3 citing courts
2
GREENState ex rel. Evans v. Brown Builders Elec. Co., 254 S.W.3d 31 (Mo. 2008).
cites § 290.230 4×cited by 32 cases
Where it cites § 290.230
“Section 290.230; State Dep’t of Labor and Indus.”
Later courts cite it for
“in determining the intent and meaning of statutory language, the words must be considered in context and sections of the statutes in pari materia, as well as cognate sections, must be considered in order to arrive at the true meaning and scope of the words.” · 7 citing courts
3
GREENDouglas White v. R.L. Persons Constr., Inc., 503 S.W.3d 339 (Mo. Ct. App. 2016).
cites § 290.230 4×cited by 6 cases
Where it cites § 290.230
“the trial court did not commit error in finding that Employee quantitatively “failed to meet his burden of proving he performed actual construction work on a public works project as required by Section 290.230.” Employee’s second point is denied.”
4
GREENKoehler v. Warren Skinner, Inc., 804 S.W.2d 780 (Mo. Ct. App. 1990).
cites § 290.230 6×cited by 10 cases
Where it cites § 290.230
“Plaintiff appeals after the trial court, in a bench tried case, found against him on his civil conspiracy count and denied him punitive damages for the non-payment of wages required by the Prevailing Wage Law, § 290.230, RSMo 1986. We affirm in part and reverse and remand in…”
Later courts cite it for
“in determining the submissibility of a case we must consider the evidence in the light most favorable to the plaintiff and must accord him the benefit of all supporting inferences fairly and reasonably deducible from the evidence.” · 3 citing courts
5
cites § 290.230 4×cited by 16 cases
Where it cites § 290.230
“Section 290.230; City of Joplin v. Industrial Commission, 329 S.”
cites § 290.230 4×cited by 11 cases
Where it cites § 290.230
“Section 290.230[J” Id. However, § 290.230 does not require that the prevailing wage be paid for “construction” work that is “maintenance work.”
Later courts cite it for
“sections 290.210(4), 290.220, and 290.230(1) provide that any repair ... of existing facilities is work excluded from the act, provided that the repair ... of existing facilities does not change or increase the size, type or extent of the existing facilities.” · 1 citing court
7
GREENThomas v. A.G. Elec., Inc., 304 S.W.3d 179 (Mo. Ct. App. 2009).
cites § 290.230 2×cited by 9 cases
Where it cites § 290.230
“the project was covered by the Act, as set forth in Section 290.230. The bonding company has not contested the adequacy of these allegations.”
8
GREENState ex rel. Laszewski v. R.L. Persons Constr., Inc., 136 S.W.3d 863 (Mo. Ct. App. 2004).
cites § 290.230 2×cited by 6 cases
Where it cites § 290.230
“3 As both the Cape project and the New Madrid project met the definitions of Missouri’s Prevailing Wage Act (“the Act”) as “new construction by a public body,” RLP was required by Section 290.230 to pay “[n]ot less than the prevailing hourly rate of wages for work of a similar…”
9
GREENBonney v. Env't Eng'g, Inc., 224 S.W.3d 109 (Mo. Ct. App. 2007).
cites § 290.230 3×cited by 13 cases
Summary
No passage or summary on file for this case yet.
10
GREENRyburn v. Gen. Heating & Cooling Co., 887 S.W.2d 604 (Mo. Ct. App. 1994).
cites § 290.230 2×cited by 7 cases
Where it cites § 290.230
“1990) (claim of violation of the Prevailing Wage Law, § 290.230 RSMo.1986; the Burnett standard was the appropriate standard).”
Later courts cite it for
“a knowing and conscious disregard of the right or the welfare of another.” · 2 citing courts
11
GREENBranson R-IV Sch. Dist. v. Labor & Indus. Relations Comm'n, 888 S.W.2d 717 (Mo. Ct. App. 1994).
cites § 290.230 1×cited by 18 cases
Where it cites § 290.230
“§ 290.230. In this case, “locality” means the county where the physical work is to be done.”
Later courts cite it for
“the only 'rules' implicated in that adjudication are the statutory rules (i.e., the laws) by which the legislature defined the term 'prevailing hourly rate of wages' and directed how prevailing wage rates should be determined.” · 2 citing courts
cites § 290.230 1×cited by 13 cases
Where it cites § 290.230
“It further noted that since contractors are currently obligated by §§ 290.230 and 290.250 to pay the prevailing wage rate for each type of work performed by each employee during the course of each work day, any contractor who maintains that the rule requires new public…”
13
GREENWoodman Eng'g Co. v. Butler, 442 S.W.2d 83 (Mo. Ct. App. 1969).
cites § 290.230 2×cited by 4 cases
Where it cites § 290.230
“Such a wage rate is required in the construction of public works, Section 290.230 V.A.M.S. The Industrial Commission, Department of Labor, shall determine and ascertain such prevailing wage rates, Section 290.”
14
GREENHershaw v. Fender-Mason Elec. Co., 664 S.W.2d 628 (Mo. Ct. App. 1984).
cites § 290.230 1×cited by 2 cases
Where it cites § 290.230
“It is apparent that this result plainly violates the public policy of this state and the requirements of §§ 290.230 and 290.250. It is apparent, as well, that the regulation declaring the determination to be void after 120 days if no contract is executed within that time is…”
15
NEUTRALState ex rel. Nixon v. Fru-Con Constr. Corp., 90 S.W.3d 533 (Mo. Ct. App. 2002).
cites § 290.230 4×cited by 1 case
Where it cites § 290.230
“The Western District disagreed, holding that the regulation “is not so inconsistent and unreasonable so as to be in conflict with § 290.230.” We elect to follow the Western District.”
16
NO FLAGAlvin Brockington v. New Horizons Enter., LLC, No. WD83838 (Mo. Ct. App. Nov. 23, 2021).
cites § 290.230 4×cited by 0 cases
Where it cites § 290.230
“” Case Law Interpreting the Applicable Provisions of the Prevailing Wage Act As noted above, Section 290.230 provides that, prevailing wages “shall be paid to all work[ers] employed by or on behalf of any public body engaged in the construction of public works, exclusive of…”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196919952021

One bar per year. Tallest: 2 cases in 1994. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Mo. Ct. App.14Mo.2
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2026 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.

Missouri Revised Statutes Home  |  Search Missouri  |  Search cases for this section  |  syfert.com