Skip to main content
Okla. Stat.Title 18 — Corporations

Okla. Stat. tit. 18, § 437.2 (2026)

Powers

Edition and currency
laws through the 2025 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2025 session (checked Sept. 2026) cited 1954–2014 16citing cases
At a glance

Courts have cited this section in 16 opinions since 1954. The most litigated part is subsection (k) (6 cases).

A cooperative shall have power: (a) To sue and be sued, in its corporate name; (b) To have a perpetual existence unless a limited period of duration is stated in its charter; (c) To adopt a corporate seal and alter the same at pleasure; (d) To generate, manufacture, purchase, acquire, accumulate and transmit electric energy, and to distribute, sell, supply and dispose of electric energy in rural areas to its members, to governmental agencies and political subdivisions, and to other persons not in excess of ten percent (10%) of the number of its members; (e) To make loans to persons to whom electric energy is or will be supplied by the cooperative for the purpose of, and otherwise to assist such persons in wiring their premises and installing therein electric and plumbing fixtures, appliances, apparatus and equipment of any and all kinds of character, and to accept and otherwise acquire, and to sell, assign, transfer, endorse, pledge, hypothecate and otherwise dispose of notes, bonds, and other evidences of indebtedness and any and all types of security therefor; (f) To make loans to persons to whom electric energy is or will be supplied by the cooperative for the purpose of, and otherwise to assist such persons in constructing, maintaining and operating electric refrigeration plants; (g) To become a member in one or more other cooperatives or corporations or to own stock therein; (h) To construct, purchase, take, receive, lease as lessee, or otherwise acquire, and to own, hold, use, equip, maintain, and operate and to sell, assign, transfer, convey, exchange, lease as lessor, mortgage, pledge, or otherwise dispose of or encumber, electric transmission and distribution lines or systems, electric generating plants, electric refrigeration plants, lands, buildings, structures, dams, plants, and equipment, and any and all kinds and classes of real or personal property whatsoever, which shall be deemed necessary, convenient or appropriate to accomplish the purpose for which the cooperative is organized; provided, that any

and all such electrical construction and maintenance shall conform to the requirements and regulations of the National Electrical Safety Code; (i) To purchase or otherwise acquire, and to own, hold, use and exercise and to sell, assign, transfer, convey, mortgage, pledge, hypothecate, or otherwise dispose of or encumber, franchises, rights, privileges, licenses, rights-of-way and easements; (j) To borrow money and otherwise contract indebtedness therefor and to secure the payment thereof by mortgage, pledge, deed or trust, or any other encumbrance upon any or all of its then owned or after acquired real or personal property, assets, franchises, revenues or income; (k) To construct, maintain and operate electric transmission and distribution lines along, upon, under and across all public thoroughfares, including without limitation, all roads, highways, streets, alleys and bridges, and upon, under and across all publicly owned lands, subject, however, to the requirements in respect of the use of such thoroughfares and lands that are imposed by the respective authorities having jurisdiction thereof upon corporations, constructing or operating electric transmission and distribution lines or systems; provided that in case an area has been or shall be included, as a result of incorporation, annexation, population growth, or otherwise, within the boundaries of a city, town or village, a cooperative which was furnishing electric energy, or was constructing or operating electric facilities, in such area, prior to such inclusion, shall be entitled to construct, maintain and operate electric transmission and distribution lines and related facilities along, upon, under and across all existing and future public thoroughfares, and to continue and extend the furnishing of electric energy or the construction and operation of electric facilities in such area without obtaining the consent, franchise, license, permit or other authority of such city, town or village, subject, however, to compliance with the lawful safety requirements of such city, town or village as to the manner of constructing and maintaining facilities on such thoroughfares, and subject to payment of taxes of such city, town or village that may be levied and assessed as provided in Section 1201 of Title 68 of the Oklahoma Statutes; and provided further that if such city, town or village in which an area has been or shall be included, as aforesaid, owns and operates a system for the furnishing of electric energy to its inhabitants, the cooperative furnishing electric energy in such area shall transfer to such city, town or village, upon its request, the cooperative's electric distribution facilities used in furnishing electric energy in said area, other than facilities used in furnishing electric energy for resale or to premises of the cooperative, subject, however, to the following requirement: The city, town or village shall pay to the cooperative an amount to

compensate the cooperative for the fair value of the cooperative's facilities to be acquired by the city, town or village. If such cooperative and city, town or village cannot agree upon the amount to be paid to the cooperative, the city, town or village is authorized to file a proceeding in the district court of the county in which such city, town or village, or any part thereof, is located, for the acquisition of the cooperative's electric distribution facilities used in furnishing electric energy in said area, other than facilities used in furnishing electric energy for resale or to premises of the cooperative, and the procedure followed and the method of ascertaining just compensation to be paid the cooperative will be as provided in Article 2, Section 24, of the Oklahoma Constitution and Sections 53 to 58, inclusive, of Title 66 of the Oklahoma Statutes. (l) To conduct its business and exercise any or all of its powers within or without this state; (m) To adopt, amend and repeal bylaws; and (n) To do and perform any and other acts and things, and to have and exercise any and all other powers which may be necessary, convenient or appropriate to accomplish the purpose for which the cooperative is organized; (o) To have and exercise the right of eminent domain in the same manner and by like proceedings as provided for railroad corporations under the laws of this state. (p) To participate with, jointly own or operate or enter into loans with any person, firm, corporation, limited liability company or any other kind of business entity including, but not limited to, privately owned electric utilities for the construction, operation or maintenance of electric generation, transmission or distribution facilities. Added by Laws 1939, p. 256, § 3, emerg. eff. April 14, 1939. Amended by Laws 1939, p. 271, § 1, emerg. eff. May 12, 1939; Laws 1949, p. 128, § 1, emerg. eff. March 25, 1949; Laws 1961, p. 200, § 1; Laws 1988, c. 323, § 1, eff. Nov. 1, 1988; Laws 2002, c. 32, § 1, emerg. eff. April 10, 2002.

The 16 cases that cite Okla. Stat. tit. 18, § 437.2 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 437.2 3×cited by 35 cases
Where it cites § 437.2
“As the challenged legislative act [18 O.S.1991 § 437.2] is facially regular and is a valid exercise of recognized legislative authority, compliance with the statutorily-authorized condemnation procedure will not generate a civil wrong.”
The case’s holding
A municipal condemnation proceeding is a special statutory proceeding rather than a cause of action because a cause of action requires the presence of a civil wrong.
Later courts cite it for
“the presence of a civil wrong is a critical identifying characteristic of a 'cause of action' since 'causes of action' are to remedy civil wrongs which are threatened or committed.” · 2 citing courts
2
GREENCity of Stilwell v. Ozarks Rural Elec. Coop. Corp., 166 F.3d 1064 (10th Cir. 1999).
cites § 437.2 6×cited by 18 cases
Where it cites § 437.2
“Under authority of Okla. Stat. tit. 18, § 437.2 (k), the City of Stilwell sought to condemn Ozarks’ facilities and commence operation of its municipal electrical utility within the newly-annexed territory.”
3
GREENCity of Pryor Creek v. Pub. Serv. Co. of Oklahoma, 536 P.2d 343 (Okla. 1975).
cites § 437.2 4×subsections: (k)cited by 30 cases
Where it cites § 437.2
“, (18 O.S.1971 § 437.2 and 11 O.S.1971 § 1613) to deal with these problems.”
Later courts cite it for
“lies dormant in the state until the legislature by specific enactment designates the occasion, modes and agencies by which it may be placed in operation.” · 3 citing courts
cites § 437.2 7×subsections: (k) 6×cited by 22 cases
Where it cites § 437.2
“Okla. Stat. tit. 18, § 437.2 (h) (1991); Resh, 1973 OK 81, ¶ 38 , 516 P.”
5
GREENRoot v. KAMO Elec. Coop., Inc., 699 P.2d 1083 (Okla. 1985).
cites § 437.2 1×subsections: (o)cited by 38 cases
Where it cites § 437.2
“18 O.S.1971, § 437.2(o). 24 . 66 O.S.1971, § 53.”
The case’s holding
Condemnees may recover attorney fees from a rural electric cooperative pursuant to statutory authority (66 O.S.1981 § 55(D)).
Later courts cite it for
“to become liable or subject to.” · 3 citing courts
6
GREENMcCrady v. W. Farmers Elec. Coop., 323 P.2d 356 (Okla. 1958).
cites § 437.2 1×subsections: (d)cited by 25 cases
Where it cites § 437.2
“The pertinent provisions of this section are: “To generate, * * * and to' distribute, * * * electric energy in rural areas to its members, to governmental agencies and political subdivisions, and to other persons not in excess of ten percentum (10%) of the number of its members;…”
7
GREENBarfield v. Sho-Me Power Elec. Coop., 10 F. Supp. 3d 997 (W.D. Mo. 2014).
cites § 437.2 1×cited by 3 cases
Where it cites § 437.2
“The light signal must exist on at least a portion of the fiber optics within the cables to serve Sho-Me Power’s (and KAMO Electric’s) internal electric transmission system.”
cites § 437.2 1×cited by 10 cases
Where it cites § 437.2
“10, § 1, amending 18 O.S.1941, § 437.2 which had originally granted electric cooperatives power to construct transmission and distribution lines as defendant had been doing.”
9
REDCity of Stilwell v. Ozarks Rural Elec. Coop. Corp., 870 F. Supp. 1025 (E.D. Okla. 1994).
cites § 437.2 1×subsections: (k)cited by 3 cases
Reversed in part by City Of Stilwell, Oklahoma v. Ozarks Rural Electric Cooperative Corporation (1996): the Court of Appeals for the Tenth Circuit's own opinion in this case ("We reverse the district court's grant of summary judg…
Where it cites § 437.2
“Oklahoma's expropriation statute, 18 O.S. § 437.2(k) provides, in pertinent part: .”
Later courts cite it for
“bjeeause the proposed expropriation of ozarks' facilities and consumers would frustrate the federal purpose underlying the react, the city's condemnation proceeding is preempted under the supremacy clause of the constitution.” · 2 citing courts
cites § 437.2 1×cited by 8 cases
Where it cites § 437.2
“Okla. Stat. tit. 18, § 437.2 (d) (2001). Public Service Company of Oklahoma (PSO) owns a franchise for the purpose of providing electrical service with the Town of Chelsea, Oklahoma.”
11
NEUTRALResh, Inc. v. Oklahoma Elec. Coop., Inc., 516 P.2d 803 (Okla. 1973).
cites § 437.2 3×subsections: (k) 3×cited by 6 cases
Where it cites § 437.2
“ransmission and distribution lines and related facilities along, upon, under and across all existing and future public thoroughfares, and to continue and extend the furnishing of electric energy or the construction and operation of electric facilities in such area without…”
Later courts cite it for
“a contract in the nature of a franchise comes into being.” · 2 citing courts
12
GREENOec v. Og&e, 1999 OK 35, 982 P.2d 512.
cites § 437.2 7×subsections: (k) 6×cited by 16 cases
Where it cites § 437.2
“Okla. Stat. tit. 18, § 437.2 (k) (1991); Resh, 1973 OK 81, ¶ 38 , 516 P.”
13
GREENCaddo Elec. Coop. v. Bollinger ex rel. Bollinger, 285 P.2d 200 (Okla. 1955).
cites § 437.2 1×cited by 2 cases
Where it cites § 437.2
“Plaintiff further charged defendant with failure to comply with provisions of 18 O.S.1951 § 437.2, which provides that all electrical cpnstruction and maintenance shall comply with requirements of the National.”
14
NEUTRALCity of Anadarko v. Caddo Elec. Coop., 258 F. Supp. 441 (W.D. Okla. 1966).
cites § 437.2 1×cited by 3 cases
Where it cites § 437.2
“The provisions of the Oklahoma statute, Title 18 O.S.1961, Section 437.2 (k) cannot authorize taking of the property involved herein so long as the United States holds such interest through its mortgage, in the absence of consent of the United States to such proceedings.”
15
NEUTRALChoctaw Elec. Co-Operative, Inc. v. Redman, 293 P.2d 564 (Okla. 1954).
cites § 437.2 1×cited by 2 cases
Where it cites § 437.2
“18 O.S.1951 § 437.2. The Act, 18 O.S.1951 -§ 437.26, expressly excludes Rural Electric Co-operatives from the jurisdiction and control of the Corporation Commission.”
16
NO FLAGCity of Stillwater v. Cent. Rural Elec. Coop., 1997 OK CIV APP 51, 945 P.2d 505.
cites § 437.2 1×subsections: (k)
Where it cites § 437.2
“” 18 O.S.1991 § 437.2(k). They contend, however, that this authority merely allows a coop to carry on and expand, if necessary, the service to customers and consumers that a co-op had at the time of annexation.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
195419842014

One bar per year. Tallest: 3 cases in 1999. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Okla.1110th Cir.1W.D. Mo.1E.D. Okla.1Okla. Civ. App.1W.D. Okla.1
By subsection
(d)1 case
McCrady v. W. Farmers Elec. Coop., 323 P.2d 356 (Okla. 1958).“The pertinent provisions of this section are: “To generate, * * * and to' distribute, * * * electric energy in rural areas to its members, to governmental agencies and political subdivisions, and to other persons not in excess of ten percentum (10%) of the number of its members;…”
(k)6 cases
Oklahoma Elec. Coop., Inc. v. Oklahoma Gas & Elec. Co., 1999 OK 35, 982 P.2d 512.“Okla. Stat. tit. 18, § 437.2 (h) (1991); Resh, 1973 OK 81, ¶ 38 , 516 P.”
City of Pryor Creek v. Pub. Serv. Co. of Oklahoma, 536 P.2d 343 (Okla. 1975).“, (18 O.S.1971 § 437.2 and 11 O.S.1971 § 1613) to deal with these problems.”
City of Stilwell v. Ozarks Rural Elec. Coop. Corp., 870 F. Supp. 1025 (E.D. Okla. 1994).“Oklahoma's expropriation statute, 18 O.S. § 437.2(k) provides, in pertinent part: .”
Resh, Inc. v. Oklahoma Elec. Coop., Inc., 516 P.2d 803 (Okla. 1973).“ransmission and distribution lines and related facilities along, upon, under and across all existing and future public thoroughfares, and to continue and extend the furnishing of electric energy or the construction and operation of electric facilities in such area without…”
Oec v. Og&e, 1999 OK 35, 982 P.2d 512.“Okla. Stat. tit. 18, § 437.2 (k) (1991); Resh, 1973 OK 81, ¶ 38 , 516 P.”
Showing the top 5 of 6. More in the list view →
(o)1 case
Root v. KAMO Elec. Coop., Inc., 699 P.2d 1083 (Okla. 1985).“18 O.S.1971, § 437.2(o). 24 . 66 O.S.1971, § 53.”
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2025 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.