Or. Rev. Stat. § 469.402 (2026)

Delegation of review of future action required by site certificate

Edition and currency
laws through the 2025 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2025 session (checked Sept. 2026) ACTIVE · 1 IN 5Y cited 2023 1citing case
At a glance

Courts have cited this section in 1 opinion since 2023, 1 of them in the last five years.

      469.402 Delegation of review of future action required by site certificate. If the Energy Facility Siting Council elects to impose conditions on a site certificate or an amended site certificate, that require subsequent review and approval of a future action, the council may delegate the future review and approval to the State Department of Energy if, in the council’s discretion, the delegation is warranted under the circumstances of the case. [1995 c.505 §27; 1999 c.385 §3]

 

      Note: 469.402 was added to and made a part of 469.300 to 469.563 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.

The 1 case that cites Or. Rev. Stat. § 469.402 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENStop B2H Coalition v. Dept. of Energy, 525 P.3d 864 (Or. 2023).
cites § 469.402 1×cited by 15 cases
Where it cites § 469.402
“That argument fails because ORS 469.402 expressly authorizes EFSC to delegate future review and approval to ODOE: “If the Energy Facility Siting Council elects to impose conditions on a site certificate or an amended site certif- icate, that require subsequent review and…”
The case’s holding
Courts construing a statute seek to discern the intent of the legislature that enacted it, and agency action is reviewable where it is directed at identifiable regulated conduct.
Later courts cite it for
“modification of the one-mile requirement applied only to the site certificate for this specific proposed transmission line” · 3 citing courts

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2025 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.