Tex. Util. Code § 39.252 (2026)

Right To Recover Stranded Costs

Edition and currency
laws through the 89th Legislature (2025). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 89th Legislature (2025) cited 2001–2015 35citing cases
At a glance

Courts have cited this section in 35 opinions since 2001. The most litigated part is subsection (a) (10 cases).

Sec. 39.252. RIGHT TO RECOVER STRANDED COSTS. (a) An electric utility is allowed to recover all of its net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electric generation service.

(b)(1) Recovery of retail stranded costs by an electric utility shall be from all existing or future retail customers, including the facilities, premises, and loads of those retail customers, within the utility's geographical certificated service area as it existed on May 1, 1999. A retail customer may not avoid stranded cost recovery charges by switching to new on-site generation except as provided by Section 39.262(k). For purposes of this subchapter, "new on-site generation" means electric generation capacity greater than 10 megawatts capable of being lawfully delivered to the site without use of utility distribution or transmission facilities and which was not, on or before December 31, 1999, either:

(A) a fully operational facility; or

(B) a project supported by substantially complete filings for all necessary site-specific environmental permits under the rules of the Texas Natural Resource Conservation Commission in effect at the time of filing.

(2) If a customer commences taking energy from new on-site generation which materially reduces the customer's use of energy delivered through the utility's facilities, the customer shall pay an amount each month computed by multiplying the output of the on-site generation by the new sum of competition transition charges under Section 39.201 and transition charges under Subchapter G which are in effect during that month. Payment shall be made to the utility, its successors, an assignee, or other collection agent responsible for collecting the competition transition charges and transition charges and shall be collected in addition to the competition transition charges and transition charges applicable to energy actually delivered to the customer through the utility's facilities.

(c) In multiply certificated areas, a retail customer may not avoid stranded cost recovery charges by switching to another electric utility, electric cooperative, or municipally owned utility after May 1, 1999. A customer in a multiply certificated service area that requested to switch providers on or before May 1, 1999, or was not taking service from an electric utility on May 1, 1999, and does not do so after that date is not responsible for paying retail stranded costs of that utility.

(d) An electric utility shall pursue commercially reasonable means to reduce its potential stranded costs, including good faith attempts to renegotiate above-cost fuel and purchased power contracts or the exercise of normal business practices to protect the value of its assets. The commission shall consider the utility's efforts under this subsection when determining the amount of the utility's stranded costs; provided, however, that nothing in this section authorizes the commission to substitute its judgment for a market valuation of generation assets determined under Sections 39.262(h) and (i).

Added by Acts 1999, 76th Leg., ch. 405, Sec. 39, eff. Sept. 1, 1999.

The 20 cases that cite Tex. Util. Code § 39.252 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENCenterpoint Energy, Inc. v. Pub. Util. Comm'n, 143 S.W.3d 81 (Tex. 2004).
cites § 39.252 10×subsections: (a) 8×cited by 71 cases
Where it cites § 39.252
“10498 , 10520 (2001) (citing TEX. UTIL.CODE §§ 39.252, .262). [22] TEX.”
The case’s holding
A regulatory rule is invalid if it violates a statutory provision (regarding the scope of carrying costs and the quantification of stranded costs).
Later courts cite it for
“set forth a comprehensive scheme for estimating, finalizing, and recovering those costs.” · 8 citing courts
cites § 39.252 8×subsections: (a) 3× (d) 2×cited by 65 cases
Where it cites § 39.252
“18 See Tex. Util.Code Ann. §§ 39.252 (stating that utility is allowed to recover its “verifiable” stranded costs), .”
The case’s holding
The partial-stock-valuation method requires that common stock be actually sold and purchased by public investors through a national stock exchange.
Later courts cite it for
“we presume that every word was deliberately chosen and that excluded words were left out on purpose.” · 7 citing courts
3
GREENAEP Texas Cent. Co. v. Pub. Util. Comm'n of Texas, 258 S.W.3d 272 (Tex. App.—Austin 2008).
cites § 39.252 23×subsections: (d) 17× (a) 4×cited by 8 cases
Where it cites § 39.252
“Utilities are entitled to recover only their "net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electrical generation service," Tex. Util. Code Ann. § 39.252 (a) (West 2007) (emphasis added), and have an affirmative obligation to "pursue…”
4
GREENReliant Energy, Inc. v. Pub. Util. Comm'n, 101 S.W.3d 129 (Tex. App.—Austin 2003).
cites § 39.252 5×subsections: (a) 5×cited by 61 cases
Where it cites § 39.252
“” Tex. Util.Code Ann. § 39.252(a). The utilities challenge the Commission’s authority to net a utility’s final stranded-cost calculation with other true-up items such as a utility’s final-fuel balance.”
The case’s holding
Statutory provisions provide incentives for utilities to maintain or increase the market value of generation assets to prevent the depression of asset values for stranded-cost recovery.
Later courts cite it for
“two parallel true-up tracks--one for stranded costs and one for the several other true-up items.” · 8 citing courts
cites § 39.252 2×subsections: (a) 2×cited by 225 cases
Where it cites § 39.252
“[69] Tex. Util.Code § 39.252(a) (emphasis added).”
The case’s holding
A party challenging a statute on its face must establish that the statute, by its terms, always operates unconstitutionally.
Later courts cite it for
“failure to follow procedural requirements of statutes or rules is not reversible error without a showing of harm” · 9 citing courts
cites § 39.252 2×subsections: (a)cited by 64 cases
Where it cites § 39.252
“3d at 238 (citing Tex. Util.Code § 39.252). 16 . Tex. Util.”
The case’s holding
An agency action is arbitrary and capricious if the agency fails to follow the clear and unambiguous language of its own regulation.
Later courts cite it for
“if an agency 'does not follow the clear, unambiguous language of its own regulation, we reverse its action as arbitrary and capricious” · 3 citing courts
7
GREENCenterpoint Energy Houston Elec., LLC v. Gulf Coast Coalition of Cities, 263 S.W.3d 448 (Tex. App.—Austin 2008).
cites § 39.252 4×subsections: (b)(1) 2× (b)cited by 13 cases
Where it cites § 39.252
“” See Tex. Util. Code Ann. § 39.252 (a) (West 2007).”
8
GREENIn re TXU Elec. Co., 67 S.W.3d 130 (Tex. 2001).
cites § 39.252 2×subsections: (a) 2×cited by 48 cases
Where it cites § 39.252
“254 and that has a service area exclusively located within the Electric Reliability Council of Texas does not have positive stranded costs based on a computation under Subsection (h), the commission shall order that mitigation attributable to positive differences identified…”
The case’s holding
Stranded costs may arise as a byproduct of the transition from a rate-regulated electricity system to a competitive market.
Later courts cite it for
“electricity to end-use customers” · 5 citing courts
9
GREENState v. Pub. Util. Com'n of Texas, 344 S.W.3d 349 (Tex. 2011).
cites § 39.252 1×cited by 33 cases
Where it cites § 39.252
“3d at 238 (citing Tex. Util.Code § 39.252). 14 . Tex. Util.”
The case’s holding
A regulatory commission may not exercise new powers beyond its statutory grant simply because doing so is expedient for administrative purposes.
Later courts cite it for
“may not exercise what is effectively a new power' in addition to powers expressly conferred by statute or necessary to accomplish its express duties 'on the theory that such exercise is expedient for administrative purposes.” · 3 citing courts
10
GREENGulf Coast Coalition of Cities v. Pub. Util. Comm'n, 161 S.W.3d 706 (Tex. App.—Austin 2005).
cites § 39.252 1×subsections: (a)cited by 31 cases
Where it cites § 39.252
“” Tex. UtiLCode Ann. § 39.252(a). The legislature provided a comprehensive scheme for estimating, finalizing, and recovering those costs.”
The case’s holding
An agency rule is valid unless it contravenes the governing statute or runs counter to its objectives, and courts defer to agency interpretation where policy room exists.
Later courts cite it for
“in harmony' with the general objectives of the legislation involved” · 2 citing courts
11
GREENState ex rel. Off. of the Attorney Gen. v. Pub. Util. Comm'n of Texas, 246 S.W.3d 324 (Tex. App.—Austin 2008).
cites § 39.252 4×subsections: (a) 4×cited by 5 cases
Where it cites § 39.252
“As part of the transition from regulation to retail competition, the legislature authorized each electric utility to recover “all of its net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electric generation service.”
12
GREENOff. of Pub. Util. Couns. v. Pub. Util. Comm'n, 303 S.W.3d 904 (Tex. App.—Austin 2010).
cites § 39.252 1×cited by 3 cases
Where it cites § 39.252
“See Tex. UtiLCode Ann. §§ 39.252 (right to recover stranded costs), 39.”
13
GREENState v. Pub. Util. Com's of Texas, 246 S.W.3d 324 (Tex. App.—Austin 2008).
cites § 39.252 4×subsections: (a) 4×cited by 0 cases
Where it cites § 39.252
“As part of the transition from regulation to retail competition, the legislature authorized each electric utility to recover "all of its net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electric generation service.”
The case’s holding
The Commission may use the statutory definition of market value to determine asset value when a utility fails to establish market value through statutory methods.
Later courts cite it for
“the value the asset would have if bought and sold in a bona fide third-party transaction on the open market” · 5 citing courts
14
NO FLAGCenterpoint Energy Houston Elec., LLC v. Pub. Util. Comm'n of Texas, No. 03-05-00557-CV (Tex. App.—Austin Dec. 20, 2007).
cites § 39.252 8×cited by 0 cases
Where it cites § 39.252
“The utility was required to mitigate the amount of stranded costs it incurs from purchasing electricity and "providing electric generation service," Tex. Util. Code Ann. § 39.252 (a), and was required to "pursue commercially reasonable means to reduce its potential stranded…”
15
NO FLAGCenterpoint Energy Houston Elec., LLC v. Pub. Util. Comm'n of Texas, No. 03-05-00557-CV (Tex. App.—Austin Apr. 17, 2008).
cites § 39.252 8×cited by 0 cases
Where it cites § 39.252
“The utility was required to mitigate the amount of stranded costs it incurs from purchasing electricity and "providing electric generation service," Tex. Util. Code Ann. § 39.252 (a), and was required to "pursue commercially reasonable means to reduce its potential stranded…”
16
NO FLAGCenterpoint Energy Houston Elec., LLC v. Pub. Util. Comm'n of Texas, No. 03-05-00557-CV (Tex. App.—Austin Dec. 20, 2007).
cites § 39.252 6×cited by 0 cases
Where it cites § 39.252
“See Tex. Util. Code Ann. §§ 39.252 (a), .262(c), (d)(2).”
cites § 39.252 6×cited by 0 cases
Where it cites § 39.252
“See Tex. Util. Code Ann. § 39.051 (West 2007).”
cites § 39.252 6×cited by 0 cases
Where it cites § 39.252
“LEXIS 9919 , at *10. Utilities are entitled to recover only their "net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electrical generation service," Tex.”
cites § 39.252 6×cited by 0 cases
Where it cites § 39.252
“Utilities are entitled to recover only their “net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electrical generation service,” Tex. Util. Code Ann. § 39.252 (a) (West 2007) (emphasis added), and have an affirmative obligation to “pursue…”
cites § 39.252 6×cited by 0 cases
Where it cites § 39.252
“See Tex. Util. Code Ann. § 39.051 (West 2007).”

Show all 35 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200120082015

One bar per year. Tallest: 19 cases in 2008. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Tex. App.30Tex.5
By subsection
(a)10 cases
Centerpoint Energy, Inc. v. Pub. Util. Comm'n, 143 S.W.3d 81 (Tex. 2004).“10498 , 10520 (2001) (citing TEX. UTIL.CODE §§ 39.252, .262). [22] TEX.”
Reliant Energy, Inc. v. Pub. Util. Comm'n, 101 S.W.3d 129 (Tex. App.—Austin 2003).“” Tex. Util.Code Ann. § 39.252(a). The utilities challenge the Commission’s authority to net a utility’s final stranded-cost calculation with other true-up items such as a utility’s final-fuel balance.”
City of Corpus Christi v. Pub. Util. Comm'n of Texas, 51 S.W.3d 231 (Tex. 2001).“[69] Tex. Util.Code § 39.252(a) (emphasis added).”
CenterPoint Energy Houston Elec., LLC v. Gulf Coast Coalition of Cities, 252 S.W.3d 1 (Tex. App.—Austin 2008).“18 See Tex. Util.Code Ann. §§ 39.252 (stating that utility is allowed to recover its “verifiable” stranded costs), .”
In re TXU Elec. Co., 67 S.W.3d 130 (Tex. 2001).“254 and that has a service area exclusively located within the Electric Reliability Council of Texas does not have positive stranded costs based on a computation under Subsection (h), the commission shall order that mitigation attributable to positive differences identified…”
Showing the top 5 of 10. More in the list view →
(b)1 case
Centerpoint Energy Houston Elec., LLC v. Gulf Coast Coalition of Cities, 263 S.W.3d 448 (Tex. App.—Austin 2008).“” See Tex. Util. Code Ann. § 39.252 (a) (West 2007).”
(b)(1)1 case
(d)2 cases
AEP Texas Cent. Co. v. Pub. Util. Comm'n of Texas, 258 S.W.3d 272 (Tex. App.—Austin 2008).“Utilities are entitled to recover only their "net, verifiable, nonmitigable stranded costs incurred in purchasing power and providing electrical generation service," Tex. Util. Code Ann. § 39.252 (a) (West 2007) (emphasis added), and have an affirmative obligation to "pursue…”

Show all 35 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 89th Legislature (2025). Syfert holds no earlier or later version of this section.

Texas Codes Home  |  Search Texas  |  Search cases for this section  |  syfert.com