Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Military Aviation and Installation Assurance Clearinghouse for review of mission obstructions
Courts have cited this section in 1 opinion since 2019. The most litigated part is subsection (c) (1 case).
The date of the enactment of the National Defense Authorization Act for Fiscal Year 2024, referred to in subsecs. (e)(1)(B)(ii) and (h)(2)(B)(i), is the date of enactment of Pub. L. 118–31, which was approved
2025—Subsec. (h)(3). Pub. L. 119–60 substituted comma for semicolon after “Francis E. Warren Air Force Base”.
2024—Subsec. (h)(2)(A)(ii). Pub. L. 118–159 substituted “by law” for “under this title”.
2023—Pub. L. 118–31, § 362(b)(1), inserted “or antenna structure projects” after “energy projects” wherever appearing and inserted “or antenna structure project” after “energy project” wherever appearing except in subsecs. (e)(1) and (h)(2).
Subsec. (c)(3). Pub. L. 118–31, § 361, inserted “The Clearinghouse shall ensure that a governor has at least 30 days after the date on which the governor receives the notice of presumed risk to provide any such comments and shall provide detailed information and other information necessary to ensure that the governor can fully understand the nature of the presumed risk.” after “to the application.”
Subsec. (d)(2)(B). Pub. L. 118–31, § 362(a)(1)(A), inserted “or any active intercontinental ballistic missile launch facility or control center” after “military training routes”.
Subsec. (d)(2)(E). Pub. L. 118–31, § 362(a)(1)(B), substituted “a Deputy Under Secretary of Defense, or, in the case of a geographic area of concern related to an active intercontinental ballistic missile launch facility or control center, the Assistant Secretary of Defense for Energy, Installations, and Environment” for “or a Deputy Under Secretary of Defense”.
Subsec. (e)(1). Pub. L. 118–31, § 362(a)(2), designated first sentence as subpar. (A) and inserted “or antenna structure project” after “energy project”, designated second sentence as subpar. (C) and substituted “Any finding of unacceptable risk to national security by the Secretary of Defense under this paragraph” for “The Secretary of Defense’s finding of unacceptable risk to national security”, and added subpar. (B) after subpar. (A) as so designated.
Subsec. (h)(2) to (11). Pub. L. 118–31, § 362(b)(2), added pars. (2) and (3) and redesignated former pars. (2) to (9) as (4) to (11), respectively.
2021—Subsec. (c)(2). Pub. L. 116–283, § 311(1), designated existing provisions as subpar. (A) and added subpar. (B).
Subsec. (c)(2)(C). Pub. L. 117–81, § 371(b)(1), added subpar. (C).
Subsec. (c)(4) to (6). Pub. L. 116–283, § 311(2), (3), added par. (4) and redesignated former pars. (4) and (5) as (5) and (6), respectively. Former par. (6) redesignated (7).
Subsec. (c)(7). Pub. L. 116–283, § 311(2), (4), redesignated par. (6) as (7) and struck out “Any setback for a project pursuant to the previous sentence shall not be more than what is determined to be necessary by a technical analysis conducted by the Lincoln Laboratory at the Massachusetts Institute of Technology or any successor entity.” before “Material marked”.
Subsec. (c)(8). Pub. L. 117–81, § 371(b)(2), added par. (8).
2019—Subsec. (c)(1). Pub. L. 116–92, § 311, substituted “75 days” for “60 days” in introductory provisions.
Subsec. (c)(6). Pub. L. 116–92, § 371(1), in second sentence, substituted “air route surveillance radar, airport surveillance radar, or wide area surveillance over-the-horizon radar” for “air route surveillance radar or airport surveillance radar” and inserted after second sentence “Any setback for a project pursuant to the previous sentence shall not be more than what is determined to be necessary by a technical analysis conducted by the Lincoln Laboratory at the Massachusetts Institute of Technology or any successor entity.”
Subsec. (d)(2)(E). Pub. L. 116–92, § 371(2)(A), substituted “the Deputy Secretary of Defense, an Under Secretary of Defense, or a Deputy Under Secretary of Defense” for “a Deputy Secretary of Defense, an Under Secretary of Defense, or a Principal Deputy Under Secretary of Defense”.
Subsec. (d)(3), (4). Pub. L. 116–92, § 371(2)(B), (C), added par. (3) and redesignated former par. (3) as (4).
Subsec. (e)(3). Pub. L. 116–92, § 371(3), substituted “an Under Secretary of Defense, or a Deputy Under Secretary of Defense” for “an under secretary of defense, or a deputy under secretary of defense”.
Subsec. (f). Pub. L. 116–92, § 371(4), which directed the substitution of “from an entity requesting a review by the Clearinghouse under this section” for “from an applicant for a project filed with the Secretary of Transportation pursuant to section 44718 of title 49”, could not be executed because of the intervening amendment by Pub. L. 116–92, § 312. See note below.
Pub. L. 116–92, § 312, substituted “for an energy project” for “for a project filed with the Secretary of Transportation pursuant to section 44718 of title 49”.
Subsec. (h)(3) to (9). Pub. L. 116–92, § 371(5), added par. (3), redesignated former pars. (3) to (6) as (4) to (7), respectively, in par. (7) substituted “the Administrator of the Federal Aviation Administration” for “the Federal Aviation Administration”, added par. (8), and redesignated former par. (7) as (9).
Pub. L. 115–91, div. A, title III, § 311(c),
Pub. L. 115–91, div. A, title III, § 311(d),
A badge such as ▸ 12 cases opens the cases that cite that subsection.
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.