20 U.S.C. § 76m (2026)
Photovoltaic system
Edition and currency
Other sources
Courts have cited this section in 1 opinion since 2026, 1 of them in the last five years.
The Board may study, plan, design, engineer, and construct a photovoltaic system for the main roof of the John F. Kennedy Center for the Performing Arts.
Not later than 60 days before beginning construction of the photovoltaic system pursuant to subsection (a), the Board shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the feasibility and design of the project.
A prior section 76m, Pub. L. 85–874, § 7,
- Where it cites § 76m
- “As for the seemingly less intrusive addition of a “photovoltaic system” on the roof of the main building, see 20 U.S.C. § 76m, the Kennedy Center had to go to Congress anyway to secure a specific appropriation for the work, see id.”
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.