26 U.S.C. § 48A
Qualifying advanced coal project credit
Rules similar to section 48(a)(4) (without regard to subparagraph (D) thereof) shall apply for purposes of this section.
Rules similar to the rules of subsections (c)(4) and (d) of section 46 (as in effect on the day before the enactment of the Revenue Reconciliation Act of 1990) shall apply for purposes of this section.
The term “qualifying advanced coal project” means a project which meets the requirements of subsection (e).
The term “advanced coal-based generation technology” means a technology which meets the requirements of subsection (f).
The term “coal” means anthracite, bituminous coal, subbituminous coal, lignite, and peat.
The term “greenhouse gas capture capability” means an integrated gasification combined cycle technology facility capable of adding components which can capture, separate on a long-term basis, isolate, remove, and sequester greenhouse gases which result from the generation of electricity.
The term “electric generation unit” means any facility at least 50 percent of the total annual net output of which is electrical power, including an otherwise eligible facility which is used in an industrial application.
The term “integrated gasification combined cycle” means an electric generation unit which produces electricity by converting coal to synthesis gas which is used to fuel a combined-cycle plant which produces electricity from both a combustion turbine (including a combustion turbine/fuel cell hybrid) and a steam turbine.
Not later than 180 days after the date of enactment of this section, the Secretary, in consultation with the Secretary of Energy, shall establish a qualifying advanced coal project program for the deployment of advanced coal-based generation technologies.
An application under subparagraph (A) shall contain such information as the Secretary may require in order to make a determination to accept or reject an application for certification as meeting the requirements under subsection (e)(1). Any information contained in the application shall be protected as provided in section 552(b)(4) of title 5, United States Code.
The Secretary shall issue a determination as to whether an applicant has met the requirements under subsection (e)(1) within 60 days following the date of submittal of the application for certification.
Each applicant for certification shall have 2 years from the date of acceptance by the Secretary of the application during which to provide to the Secretary evidence that the criteria set forth in subsection (e)(2) have been met.
An applicant which receives a certification shall have 5 years from the date of issuance of the certification in order to place the project in service and if such project is not placed in service by that time period then the certification shall no longer be valid.
The aggregate credits allowed under subsection (a) for projects certified by the Secretary under paragraph (2) may not exceed $2,550,000,000.
Not later than 6 years after the date of enactment of this section, the Secretary shall review the credits allocated under this section as of the date which is 6 years after the date of enactment of this section.
If the Secretary determines that credits under clause (i) or (ii) of paragraph (3)(B) are available for reallocation pursuant to the requirements set forth in paragraph (2), the Secretary is authorized to conduct an additional program for applications for certification.
The Secretary shall, upon making a certification under this subsection or section 48B(d), publicly disclose the identity of the applicant and the amount of the credit certified with respect to such applicant.
Performance characteristic: | Design level for project: |
|---|---|
SO2 (percent removal) | 99 percent |
NOx (emissions) | 0.07 lbs/MMBTU |
PM* (emissions) | 0.015 lbs/MMBTU |
Hg (percent removal) | 90 percent |
The Secretary shall provide for recapturing the benefit of any credit allowable under subsection (a) with respect to any project which fails to attain or maintain the separation and sequestration requirements of subsection (e)(1)(G).
The enactment of the Revenue Reconciliation Act of 1990, referred to in subsec. (b)(3), is the date of enactment of title XI of Pub. L. 101–508, which was approved
The date of enactment of this section, referred to in subsecs. (d)(1), (4)(A) and (f)(3), is the date of enactment of Pub. L. 109–58, which was approved
Pub. L. 110–234 and Pub. L. 110–246 made identical amendments to this section. The amendments by Pub. L. 110–234 were repealed by section 4(a) of Pub. L. 110–246.
2009—Subsec. (b)(2). Pub. L. 111–5 inserted “(without regard to subparagraph (D) thereof)” after “section 48(a)(4)”.
2008—Subsec. (a)(3). Pub. L. 110–343, § 111(a), added par. (3).
Subsec. (d)(2)(A). Pub. L. 110–343, § 111(c)(2), reenacted heading without change and amended text generally. Prior to amendment, text read as follows: “Each applicant for certification under this paragraph shall submit an application meeting the requirements of subparagraph (B). An applicant may only submit an application during the 3-year period beginning on the date the Secretary establishes the program under paragraph (1).”
Subsec. (d)(3)(A). Pub. L. 110–343, § 111(b), substituted “$2,550,000,000” for “$1,300,000,000”.
Subsec. (d)(3)(B). Pub. L. 110–343, § 111(c)(1), reenacted heading without change and amended text generally. Prior to amendment, text read as follows: “Of the dollar amount in subparagraph (A), the Secretary is authorized to certify—
“(i) $800,000,000 for integrated gasification combined cycle projects, and
“(ii) $500,000,000 for projects which use other advanced coal-based generation technologies.”
Subsec. (d)(5). Pub. L. 110–343, § 111(d), added par. (5).
Subsec. (e)(1)(G). Pub. L. 110–343, § 111(c)(3)(A), added subpar. (G).
Subsec. (e)(3). Pub. L. 110–343, § 111(c)(5), substituted “certain” for “integrated gasification combined cycle” in heading.
Subsec. (e)(3)(B)(iii), (iv). Pub. L. 110–343, § 111(c)(4), added cl. (iii) and redesignated former cl. (iii) as (iv).
Subsec. (e)(3)(C). Pub. L. 110–343, § 111(c)(3)(B), added subpar. (C).
Subsec. (h). Pub. L. 110–246, § 15346(a), added subsec. (h).
Subsec. (i). Pub. L. 110–343, § 111(c)(3)(C), added subsec. (i).
2007—Subsec. (d)(4)(B)(ii). Pub. L. 110–172 struck out “subsection” before “paragraph” in two places.
2006—Subsec. (f)(1). Pub. L. 109–432 inserted concluding provisions.
Amendment by Pub. L. 111–5 applicable to periods after
Pub. L. 110–343, div. B, title I, § 111(e),
Amendment of this section and repeal of Pub. L. 110–234 by Pub. L. 110–246 effective
Pub. L. 110–234, title XV, § 15346(b),
[Pub. L. 110–234 and Pub. L. 110–246 enacted identical provisions. Pub. L. 110–234 was repealed by section 4(a) of Pub. L. 110–246, set out as a note under section 8701 of Title 7, Agriculture.]
Pub. L. 109–432, div. A, title II, § 203(b),
Section applicable to periods after