Skip to main content
U.S. CodeTitle 42Chapter 84— Department of EnergySubchapter III— Transfers of Functions

42 U.S.C. § 7151 (2026)

General transfers

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1978–2025 76citing cases
At a glance

Courts have cited this section in 76 opinions since 1978, 4 of them in the last five years. The most litigated part is subsection (a) (1 case).

(a) Except as otherwise provided in this chapter, there are transferred to, and vested in, the Secretary all of the functions vested by law in the Administrator of the Federal Energy Administration or the Federal Energy Administration, the Administrator of the Energy Research and Development Administration or the Energy Research and Development Administration; and the functions vested by law in the officers and components of either such Administration.(b) Except as provided in subchapter IV, there are transferred to, and vested in, the Secretary the function of the Federal Power Commission, or of the members, officers, or components thereof. The Secretary may exercise any power described in section 7172(a)(2) of this title to the extent the Secretary determines such power to be necessary to the exercise of any function within his jurisdiction pursuant to the preceding sentence.(Pub. L. 95–91, title III, § 301, Aug. 4, 1977, 91 Stat. 577.)Editorial NotesReferences in Text

This chapter, referred to in subsec. (a), was in the original “this Act”, meaning Pub. L. 95–91, Aug. 4, 1977, 91 Stat. 565, known as the Department of Energy Organization Act, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 7101 of this title and Tables.

Executive DocumentsEmergency Preparedness Functions

For assignment of certain emergency preparedness functions to the Secretary of Energy, see Parts 1, 2, and 7 of Ex. Ord. No. 12656, Nov. 18, 1988, 53 F.R. 47491, set out as a note under section 5195 of this title.

Ex. Ord. No. 12038. Transfer of Certain Functions to Secretary of Energy

Ex. Ord. No. 12038, Feb. 3, 1978, 43 F.R. 4957, as amended by Ex. Ord. No. 12156, Sept. 10, 1979, 44 F.R. 53073, provided:

By virtue of the authority vested in me as President of the United States of America, in order to reflect the responsibilities of the Secretary of Energy for the performance of certain functions previously vested in other officers of the United States by direction of the President and subsequently transferred to the Secretary of Energy pursuant to the Department of Energy Organization Act (91 Stat. 565; 42 U.S.C. 7101 et seq.) it is hereby ordered as follows:

Section 1. Functions of the Federal Energy Administration. In accordance with the transfer of all functions vested by law in the Federal Energy Administration, or the Administrator thereof, to the Secretary of Energy pursuant to Section 301(a) of the Department of Energy Organization Act [subsec. (a) of this section], hereinafter referred to as the Act, the Executive Orders and Proclamations referred to in this Section, which conferred authority or responsibility upon the Administrator of the Federal Energy Administration, are amended as follows:

(a) Executive Order No. 11647, as amended [formerly set out as a note under 31 U.S.C. 501], relating to Federal Regional Councils, is further amended by deleting “The Federal Energy Administration” in Section 1(a)(10) and substituting “The Department of Energy”, and by deleting “The Deputy Administrator of the Federal Energy Administration” in Section 3(a)(10) and substituting “The Deputy Secretary of Energy”.

(b) Executive Order No. 11790 of June 25, 1974 [set out as a note under 15 U.S.C. 761], relating to the Federal Energy Administration Act of 1974, is amended by deleting “Administrator of the Federal Energy Administration” and “Administrator” wherever they appear in Sections 1 through 6 and substituting “Secretary of Energy” and “Secretary”, respectively, and by deleting Section 7 through 10.

(c) Executive Order No. 11912, as amended [set out as a note under 42 U.S.C. 6201], relating to energy policy and conservation, and Proclamation No. 3279, as amended [formerly set out as a note under 19 U.S.C. 1862], relating to imports of petroleum and petroleum products, are further amended by deleting “Administrator of the Federal Energy Administration”, “Federal Energy Administration”, and “Administrator” (when used in reference to the Federal Energy Administration) wherever those terms appear and by substituting “Secretary of Energy”, “Department of Energy”, and “Secretary”, respectively, and by deleting “the Administrator of Energy Research and Development” in Section 10(a)(1) of Executive Order No. 11912, as amended.

Sec. 2. Functions of the Federal Power Commission. In accordance with the transfer of functions vested in the Federal Power Commission to the Secretary of Energy pursuant to Section 301(b) of the Act [subsec. (b) of this section], the Executive Orders referred to in this Section, which conferred authority or responsibility upon the Federal Power Commission, or Chairman thereof, are amended or modified as follows:

(a) Executive Order No. 10485 of September 3, 1953, [set out as a note under 15 U.S.C. 717b], relating to certain facilities at the borders of the United States is amended by deleting Section 2 thereof, and by deleting “Federal Power Commission” and “Commission” wherever those terms appear in Sections 1, 3 and 4 of such Order and substituting for each “Secretary of Energy”.

(b) Executive Order No. 11969 of February 2, 1977 [formerly set out as a note under 15 U.S.C. 717], relating to the administration of the Emergency Natural Gas Act of 1977 [formerly set out as a note under 15 U.S.C. 717], is hereby amended by deleting the second sentence in Section 1, by deleting “the Secretary of the Interior, the Administrator of the Federal Energy Administration, other members of the Federal Power Commission and in Section 2, and by deleting “Chairman of the Federal Power Commission” and “Chairman” wherever those terms appear and substituting therefor “Secretary of Energy” and “Secretary”, respectively.

(c) Paragraph (2) of Section 3 of Executive Order No. 11331, as amended [formerly set out as a note under 42 U.S.C. 1962b], relating to the Pacific Northwest River Basins Commission, is hereby amended by deleting “from each of the following Federal departments and agencies” and substituting therefor “to be appointed by the head of each of the following Executive agencies”, by deleting “Federal Power Commission” and substituting therefor “Department of Energy”, and by deleting “such member to be appointed by the head of each department or independent agency he represents,”.

Sec. 3. Functions of the Secretary of the Interior. In accordance with the transfer of certain functions vested in the Secretary of the Interior to the Secretary of Energy pursuant to Section 302 of the Act [42 U.S.C. 7152], the Executive Orders referred to in this Section, which conferred authority or responsibility on the Secretary of the Interior, are amended or modified as follows:

(a) Sections 1 and 4 of Executive Order No. 8526 of August 27, 1940, relating to functions of the Bonneville Power Administration, are hereby amended by substituting “Secretary of Energy” for “Secretary of the Interior”, by adding “of the Interior” after “Secretary” in Sections 2 and 3, and by adding “and the Secretary of Energy,” after “the Secretary of the Interior” wherever the latter term appears in Section 5.

(b) Executive Order No. 11177 of September 16, 1964, relating to the Columbia River Treaty, is amended by deleting “Secretary of the Interior” and “Department of the Interior” wherever those terms appear and substituting therefor “Secretary of Energy” and “Department of Energy”, respectively.

Sec. 4. Functions of the Atomic Energy Commission and the Energy Research and Development Administration.

(a) In accordance with the transfer of all functions vested by law in the Administrator of Energy Research and Development to the Secretary of Energy pursuant to Section 301(a) of the Act [subsec. (a) of this section] the Executive Orders referred to in this Section are amended or modified as follows:

(1) All current Executive Orders which refer to functions of the Atomic Energy Commission, including Executive Order No. 10127, as amended; Executive Order No. 10865, as amended [set out as a note under 50 U.S.C. 3161]; Executive Order No. 10899 of December 9, 1960 [set out as a note under 42 U.S.C. 2162]; Executive Order No. 11057 of December 18, 1962 [set out as a note under 42 U.S.C. 2162]; Executive Order No. 11477 of August 7, 1969 [set out as a note under 42 U.S.C. 2187]; Executive Order No. 11752 of December 17, 1973 [formerly set out as a note under 42 U.S.C. 4331]; and Executive Order No. 11761 of January 17, 1974 [formerly set out as a note under 20 U.S.C. 1221]; are modified to provide that all such functions shall be exercised by (1) the Secretary of Energy to the extent consistent with the functions of the Atomic Energy Commission that were transferred to the Administrator of Energy Research and Development pursuant to the Energy Organization Act of 1974 (Public Law 93–438; 88 Stat. 1233) [42 U.S.C. 5801 et seq.], and (2) the Nuclear Regulatory Commission to the extent consistent with the functions of the Atomic Energy Commission that were transferred to the Commission by the Energy Reorganization Act of 1974 [42 U.S.C. 5801 et seq.].

(2) [Former] Executive Order No. 11652, as amended, relating to the classification of national security matters, is further amended by substituting “Department of Energy” for “Energy Research and Development Administration” in Sections 2(A), 7(A) and 8 and by deleting “Federal Power Commission” in Section 2(B)(3).

(3) Executive Order No. 11902 of February 2, 1976 [formerly set out as a note under 42 U.S.C. 5841], relating to export licensing policy for nuclear materials and equipment, is amended by substituting “the Secretary of Energy” for “the Administrator of the United States Energy Research and Development Administration, hereinafter referred to as the Administrator” in Section 1(b) and for the “Administrator” in Sections 2 and 3.

(4) [Former] Executive Order No. 11905, as amended, relating to foreign intelligence activities, is further amended by deleting “Energy Research and Development Administration”, “Administrator or the Energy Research and Development Administration”, and “ERDA” wherever those terms appear and substituting “Department of Energy”, “Secretary of Energy”, and “DOE” respectively.

(5) Section 3(2) of each of the following Executive Orders is amended by substituting “Department of Energy” for “Energy Research and Development Administration”:

(i) Executive Order No. 11345, as amended [formerly set out as a note under 42 U.S.C. 1962b], establishing the Great Lakes River Basin Commission.

(ii) Executive Order No. 11371, as amended [formerly set out as a note under 42 U.S.C. 1962b], establishing the New England River Basin Commission.

(iii) Executive Order No. 11578, as amended [formerly set out as a note under 42 U.S.C. 1962b], establishing the Ohio River Basin Commission.

(iv) Executive Order No. 11658, as amended [formerly set out as a note under 42 U.S.C. 1962b], establishing the Missouri River Basin Commission.

(v) Executive Order No. 11659, as amended [formerly set out as a note under 42 U.S.C. 1962b], establishing the Mississippi River Basin Commission.

Sec. 5. Special Provisions Relating to Emergency Preparedness and Mobilization Functions.

(a) Executive Order No. 10480, as amended [formerly set out as a note under former 50 U.S.C. App. 2153], is further amended by adding thereto the following new Sections:

“Sec. 609. Effective October 1, 1977, the Secretary of Energy shall exercise all authority and discharge all responsibility herein delegated to or conferred upon (a) the Atomic Energy Commission, and (b) with respect to petroleum, gas, solid fuels and electric power, upon the Secretary of the Interior.

“Sec. 610. Whenever the Administrator of General Services believes that the functions of an Executive agency have been modified pursuant to law in such manner as to require the amendment of any Executive order which relates to the assignment of emergency preparedness functions or the administration of mobilization programs, he shall promptly submit any proposals for the amendment of such Executive orders to the Director of the Office of Management and Budget in accordance with the provisions of Executive Order No. 11030, as amended [set out as a note under 44 U.S.C. 1505].

(b) Executive Order No. 11490, as amended [formerly set out as a note under 50 U.S.C. App. 2251], is further amended by adding thereto the following new section:

“Sec. 3016. Effective October 1, 1977, the Secretary of Energy shall exercise all authority and discharge all responsibility herein delegated to or conferred upon (a) the Federal Power Commission, (b) the Energy Research and Development Administration, and (c) with respect to electric power, petroleum, gas and solid fuels, upon the Department of the Interior.”.

Sec. 6. This Order shall be effective as of October 1, 1977, the effective date of the Department of Energy Organization Act [this chapter] pursuant to the provisions of section 901 [42 U.S.C. 7341] thereof and Executive Order No. 12009 of September 13, 1977 [formerly set out as a note under 42 U.S.C. 7341], and all actions taken by the Secretary of Energy on or after October 1, 1977, which are consistent with the foregoing provisions are entitled to full force and effect.

Jimmy Carter.
The 20 cases that cite 42 U.S.C. § 7151 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 7151 4×cited by 1,371 cases
The case’s holding
A state moratorium on nuclear power plant construction is not preempted by federal law if it is based on economic and planning concerns rather than radiation safety.
Later courts cite it for
“the federal government has occupied the entire field of nuclear safety concerns, except the limited powers expressly ceded to the states.” · 31 citing courts
2
GREENSierra Club v. Fed. Energy Regulatory Comm'n, 827 F.3d 59 (D.C. Cir. 2016).
cites § 7151 2×cited by 52 cases
Where it cites § 7151
“565, 578, 582-84 (codified at 42 U.S.C. §§ 7151 (b), 7171(a), 7172(a)).”
The case’s holding
An organization has associational standing when at least one member has standing, the interests are germane to the organization's purpose, and the claim does not require individual participation.
Later courts cite it for
“an organization has associational standing to bring suit on its members' behalf when: (1) at least one of its members would have standing to sue in his or her own right; (2) 'the interests it seeks to protect are germane to the organization's purpose'; and (3) 'neither the claim asserted nor the relief requested requires the participation of individual members in the lawsuit.” · 5 citing courts
3
GREENEarthReports, Inc. v. Fed. Energy Regulatory Comm'n, 828 F.3d 949 (D.C. Cir. 2016).
cites § 7151 2×cited by 42 cases
Where it cites § 7151
“See 42 U.S.C. § 7151 (b). DOE, in turn, delegated to the Commission authority to approve or deny an application for the siting, construction, expansion, or operation of a LNG terminal, 15 U.”
The case’s holding
An agency is not required under NEPA to consider indirect environmental effects that fall under the regulatory authority of a different agency.
Later courts cite it for
“significant variation in output” · 2 citing courts
4
GREENSierra Club v. Fed. Energy Regulatory Comm'n, 827 F.3d 36 (D.C. Cir. 2016).
cites § 7151 1×cited by 49 cases
Where it cites § 7151
“42 U.S.C. § 7151 (b). The Natural Gas Act, though, authorizes the exportation of natural gas from the United States unless the Department specifically determines that doing so “will not be consistent with the public interest.”
The case’s holding
An agency need not address downstream environmental effects if the chain of events leading to those effects requires a critical intervening action by another agency.
Later courts cite it for
“cannot be considered a legally relevant cause of the effect for nepa purposes.” · 2 citing courts
5
GREENYounger v. Jensen, 26 Cal. 3d 397 (1980).
cites § 7151 2×cited by 82 cases
Where it cites § 7151
“( 42 U.S.C. §§ 7151 , 7172, 7341; Exec. Order No.”
The case’s holding
Federal antitrust enforcement overlaps with state antitrust laws that prohibit substantially the same conduct.
Later courts cite it for
“a federal judgment has the same effect in the courts of this state as it would have in a 28 federal court.” · 6 citing courts
cites § 7151 3×cited by 24 cases
Where it cites § 7151
“DOE Act § 301(b), 42 U.S.C. § 7151 (b). The legislative history of this section states in plain language that the section “transfers to the Secretary [of Energy] all functions of the Federal Power Commission, except those transferred to or vested in the Federal Energy Regulatory…”
Later courts cite it for
“at the lowest possible rates . . . consistent with sound business principles.” · 2 citing courts
7
GREENGoodyear Atomic Corp. v. Miller, 486 U.S. 174 (1988).
cites § 7151 1×cited by 315 cases
Where it cites § 7151
“577 , 42 U. S. C. § 7151 (a) (transferring responsibility to DOE from the Energy Research and Development Administration).”
The case’s holding
Courts presume that Congress is knowledgeable about existing law pertinent to the legislation it enacts.
Later courts cite it for
“we generally presume that congress is knowledgeable about existing law pertinent to the legislation it enacts.” · 71 citing courts
cites § 7151 1×cited by 43 cases
Where it cites § 7151
“See 42 U.S.C. §§ 7151 , 7293. In so doing, Congress expressly provided “[n]o suit, action, or other proceeding commenced by or against [the terminated agencies] shall abate” and that, instead, pending litigation “shall be continued with the Secretary or other official, as the…”
The case’s holding
A pending lawsuit abates upon the dissolution of a federal entity unless a statute provides for the extension of its existence for litigation purposes.
Later courts cite it for
“the existence of the government's consent is a prerequisite for jurisdiction.” · 2 citing courts
9
cites § 7151 1×cited by 15 cases
Where it cites § 7151
“42 U.S.C. § 7151 (b). The Department has delegated to the Commission the authority to approve or disapprove the siting, construction, expansion, or operation of an LNG terminal for exporting LNG.”
Later courts cite it for
“although the executive order requiring agencies to assess the environmental effects of their actions on environmental justice communities expressly states that it does not create a private right to judicial review, a petitioner may challenge an agency's environmental justice analysis as arbitrary and capricious under nepa and the apa.” · 3 citing courts
10
GREENStand. Oil Co. v. Dep't of Energy, 596 F.2d 1029 (Temp. Emerg. Ct. App. 1978).
cites § 7151 1×cited by 114 cases
Where it cites § 7151
“sequence of recovery rule and (b) the ban prohibiting the banking of non-product cost increases; (9) the sequence of recovery rule first adopted on February 1, 1976 was not entitled to retroactive application for the period January 1, 1975 to January 81, 1976; and (10) the…”
The case’s holding
An agency's interpretation of its own ambiguous regulations is invalid if the text does not compel that interpretation and the agency failed to follow required rulemaking procedures.
Later courts cite it for
“departure from well established practice” · 2 citing courts
11
GREEN20th Century Wear, Inc. v. Sanmark-Stardust Inc., 747 F.2d 81 (2d Cir. 1984).
cites § 7151 1×cited by 104 cases
Where it cites § 7151
“See 42 U.S.C. § 7151 (1982). 5 . While the pictures on the tags accompanying the pajamas of both companies had a woman with both hands on hips, the pictures accompanying the nightgowns differed — the 20th Century nightgown tag pictured a woman with one hand on one hip, while the…”
The case’s holding
Registration of a descriptive trademark does not shift the burden of proving a lack of secondary meaning to the defendant unless the mark was registered based on secondary meaning.
Later courts cite it for
“we hold that in the absence of evidence that the patent and trademark office registered the mark because of its secondary meaning, 15 u.s.c. 1052 (f), registration does not shift the burden of proving a lack of secondary meaning onto the defendant.” · 3 citing courts
12
GREENAtl. Richfield Co. v. United States Dep't of Energy, 769 F.2d 771 (D.C. Cir. 1985).
cites § 7151 1×cited by 82 cases
The case’s holding
The Secretary of Energy possesses plenary adjudicatory authority to impose discovery sanctions to ensure fairness and maintain the integrity of the adjudicative process.
Later courts cite it for
“arco has already been faced with the dilemma of having to choose between complying with the allegedly ultra vires discovery orders - and thus revealing materials that otherwise would remain confidential - and flouting the orders and facing the consequences should the department ultimately be found to have had the power to issue the orders.” · 4 citing courts
13
GREENPac. Power & Light Co. v. Duncan, 499 F. Supp. 672 (D. Or. 1980).
cites § 7151 3×cited by 9 cases
Where it cites § 7151
“42 U.S.C. § 7151 (b). In addition, Congress transferred to the Secretary of Energy all those functions of the Secretary of the Interior relating to the BPA.”
14
GREENCity of Oberlin v. FERC, 937 F.3d 599 (D.C. Cir. 2019).
cites § 7151 1×cited by 11 cases
Where it cites § 7151
“2, 2017) (citing 42 U.S.C. § 7151 (b)). Subsequently, the Secretary delegated back to the Commission the narrow authority to approve or disapprove the construction and siting of facilities where natural gas will be imported or exported.”
Later courts cite it for
“remanded to the commission for further explanation of why-under the act, the takings clause, and the precedent of this court and the supreme court-it is lawful to credit precedent agreements with foreign shippers serving foreign customers toward a finding that an interstate pipeline is required by the public convenience and necessity under section 7 of the act.” · 1 citing court
15
GREENMobil Oil Corp. v. Dep't of Energy, 610 F.2d 796 (Temp. Emerg. Ct. App. 1979).
cites § 7151 1×cited by 73 cases
The case’s holding
An agency violates the Administrative Procedure Act when it fails to consider statutory objectives or provides insufficient justification for dispensing with notice and comment requirements.
Later courts cite it for
“the agency neglected to fulfill its statutory command when it promulgated the amendment without considering the act's objectives.” · 1 citing court
16
GREENMotor & Equip. Mfrs. Ass'n v. Env't Prot. Agency, 627 F.2d 1095 (D.C. Cir. 1979).
cites § 7151 1×cited by 60 cases
Where it cites § 7151
“1 billion annually (in 1968 dollars). H.R.Rep. No. 294, 95th Cong.”
Later courts cite it for
“a fundamental change in the state of affairs” · 3 citing courts
17
GREENSauder v. Dep't of Energy, 648 F.2d 1341 (Temp. Emerg. Ct. App. 1981).
cites § 7151 1×cited by 59 cases
Where it cites § 7151
“The Department of Energy succeeded the Federal Energy Administration on October 1, 1977, 42 U.S.C. § 7151 (a); Executive Order No.”
The case’s holding
In equity, restitution is a remedy by which a defendant is made to disgorge illgotten gains or restore the status quo, permitting an agency to order an operator to refund total overcharges.
Later courts cite it for
“in equity, restitution is usually thought of as a remedy by which defendant is made to disgorge illgotten gains or to restore the status quo or to accomplish both objectives.” · 5 citing courts
18
GREENUnited States v. City of Fulton, 475 U.S. 657 (1986).
cites § 7151 1×cited by 56 cases
Where it cites § 7151
“3 42 U. S. C. § 7151 (b) (transferring to the Secretary of Energy all FPC functions not explicitly transferred in Subchapter IV of the Act to the new Federal Energy Regulatory Commission).”
The case’s holding
Courts apply deferential review to an agency's formulation and implementation of hydroelectric power rates (upholding agency interpretation of the Flood Control Act of 1944).
Later courts cite it for
“protect consumers by ensuring that power is sold 'at the low- est possible rates . . . consistent with sound business princi- ples.” · 4 citing courts
19
GREENCommon Cause v. Dep't of Energy, 702 F.2d 245 (D.C. Cir. 1983).
cites § 7151 1×cited by 51 cases
Where it cites § 7151
“577 (codified at 42 U.S.C. § 7151 (Supp. V 1981)). 8 . Exec.”
The case’s holding
Plaintiffs lack standing to allege price injuries if the causal connection between the defendant's conduct and the alleged injury is conjectural at best.
Later courts cite it for
“produce tangible, meaningful results in the real world.” · 7 citing courts
20
GREENAlabama Mun. Distributors Grp. v. FERC, 100 F.4th 207 (D.C. Cir. 2024).
cites § 7151 1×cited by 8 cases
Where it cites § 7151
“2016) (“Freeport”) (citing 42 U.S.C. § 7151 (b)). Thus, we end up with the following distinct scopes of authority mandated by Congress: Interstate Pipelines FERC Export Facilities FERC Natural Gas Exports Department of Energy No matter which scope of authority is invoked, FERC…”

Show all 76 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197820012025

One bar per year. Tallest: 9 cases in 1979. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.21Temp. Emerg. Ct. App.12D.D.C.4SCOTUS49th Cir.311th Cir.25th Cir.26th Cir.2

The 8 courts with the most citing cases, of 30 courts in all.

Enactment and amendments
(Pub. L. 95–91, title III, § 301, Aug. 4, 1977, 91 Stat. 577.)
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.