Wash. Rev. Code § 18.104.050

Reports of well construction or decommissioning

Find cases: SyfertCases citing this section WA-LEGapp.leg.wa.gov JustiaTitle on Justia CornellLII Search CasesGoogle Scholar
(1) Any person authorized by this chapter to construct or decommission a well shall furnish a well report to the director within thirty days after the completion of the construction or decommissioning of a well. The director, by rule, shall prescribe the form of the report and the information to be contained therein.
(2) In the case of a dewatering well project:
(a) A single well construction report may be submitted for all similar dewatering wells constructed with no significant change in geologic formation; and
(b) A single well decommissioning report may be submitted for all similar dewatering wells decommissioned that have no significant change in geologic formation.
[ 2005 c 84 s 3; 1993 c 387 s 8; 1971 ex.s. c 212 s 5.]
Notes of Decisions
Cited in 1 case (1 in the last 5 years), 2024–2024 · leading case: Aldoren Kauzlarich, V. State Dept. Of Ecology
Aldoren Kauzlarich, V. State Dept. Of Ecology (2024) washctapp “055 by failing to submit a notice to Ecology before constructing his well; (2) Kauzlarich violated WAC 173-160-231 and WAC 173-160-291(1) by constructing a well without a proper surface seal and with casing that does not extend at least six inches above the ground surface; (3)…”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.