Wis. Stat.Chapter 182 — Miscellaneous Corporate Provisions; Turnpike Corporations

Wis. Stat. § 182.017 (2026)

Transmission lines; privileges; damages

Edition and currency
laws through the 2025-26 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2025-26 session (checked Sept. 2026) cited 1961–2025 12citing cases
At a glance

Courts have cited this section in 12 opinions since 1961, 2 of them in the last five years. The most litigated part is subsection (2) (3 cases).

182.017182.017 Transmission lines; privileges; damages.
182.017(1g)(1g) Definitions. In this section:
182.017(1g)(a)(a) “Commission” means the public service commission.
182.017(1g)(b)(b) “Company” means any of the following:
182.017(1g)(b)1.1. A corporation, limited liability company, partnership, or other business entity organized to furnish telegraph or telecommunications service or transmit heat, power, or electric current to the public or for public purposes.
182.017(1g)(b)2.2. An independent system operator, as defined in s. 196.485 (1) (d).
182.017(1g)(b)3.3. An independent transmission owner, as defined in s. 196.485 (1) (dm).
182.017(1g)(b)4.4. A cooperative association organized under ch. 185 or 193 to furnish telegraph or telecommunications service.
182.017(1g)(b)5.5. A cooperative association organized under ch. 185 to transmit heat, power, or electric current to its members.
182.017(1g)(b)6.6. An interim cable operator, as defined in s. 66.0420 (2) (n).
182.017(1g)(b)7.7. A video service provider, as defined in s. 66.0420 (2) (zg).
182.017(1g)(bm)(bm) “Municipal regulation” means any contract, ordinance, resolution, order, or other regulation entered into, enacted, or issued by a municipality before, on, or after July 2, 2013.
182.017(1g)(c)(c) “Municipality” means a city, village, or town.
182.017(1g)(cq)(cq) “Telecommunications service” means the offering for sale of the conveyance of voice, data, or other information, including the sale of service for collection, storage, forwarding, switching, and delivery incidental to such communication regardless of the technology or mode used to make such offering.
182.017(1g)(ct)(ct) “Urban rail transit system” means a system, either publicly or privately owned, which provides transportation by rail in a municipality to the public on a regular and continuing basis and which begins service on or after July 2, 2013.
182.017(1g)(d)(d) “Video service network” has the meaning given in s. 66.0420 (2) (zb).
182.017(1r)(1r) Right-of-way for. Any company may, subject to ss. 30.44 (3m), 30.45, 86.16, and 196.491 (3) (d) 3m. and to reasonable regulations made by any municipality through which its transmission lines or systems may pass, construct and maintain such lines or systems with all necessary appurtenances in, across or beneath any public highway or bridge or any stream or body of water, or upon any lands of any owner consenting thereto, and for such purpose may acquire lands or the necessary easements; and may connect and operate its lines or system with other lines or systems devoted to like business, within or without this state, and charge reasonable rates for the transmission and delivery of messages or the furnishing of heat, power, or electric light.
182.017(2)(2) Not to obstruct public use. But no such line or system or any appurtenance thereto shall at any time obstruct or incommode the public use of any highway, bridge, stream or body of water.
182.017(3)(3) Abandoned lines removed. The commission after a public hearing as provided in s. 196.26, and subject to the right of review as provided in ch. 227, may declare any line to have been abandoned or discontinued, if the facts warrant such finding. Whenever such a finding shall have been made the company shall remove such line, and on failure for 3 months after such finding of abandonment or discontinuance, any person owning land over, through or upon which such line shall pass, may remove the same, or the supervisors of any town within which said lines may be situated, may remove the said lines from the limits of its highways, and such person or supervisors shall be entitled to recover from the company owning the lines the expense for labor involved in removing the property.
182.017(4)(4) Location of poles. In case of dispute as to the location of poles, pipes or conduits, the commissioners appointed in condemnation proceedings under ch. 32 may determine the location. In no case, except where the owner consents, shall poles be set in front of or upon any residence property, or in front of a building occupied for business purposes, unless the commissioners find that the same is necessary and the court may review the finding.
182.017(5)(5) Tree trimming. Any company which shall in any manner destroy, trim or injure any shade or ornamental trees along any such lines or systems, or, in the course of tree trimming or removal, cause any damage to buildings, fences, crops, livestock or other property, except by the consent of the owner, or after the right so to do has been acquired, shall be liable to the person aggrieved in 3 times the actual damage sustained, besides costs.
182.017(6)(6) Municipal franchise required. No lighting or heating corporation or lighting or heating cooperative association shall have any right hereunder in any municipality until it has obtained a franchise or written consent for the erection or installation of its lines from such municipality.
182.017(7)(7) High-voltage transmission lines. Any easement for rights-of-way for high-voltage transmission lines as defined under s. 196.491 (1) (f) shall be subject to all of the following conditions and limitations:
182.017(7)(a)(a) The conveyance under ch. 706 and, if applicable, the petition under s. 32.06 (7), shall describe the interest transferred by specifying, in addition to the length and width of the right-of-way, the number, type and maximum height of all structures to be erected thereon, the minimum height of the transmission lines above the landscape, and the number and maximum voltage of the lines to be constructed and operated thereon.
182.017(7)(b)(b) In determining just compensation for the interest under s. 32.09, damages shall include losses caused by placement of the line and associated facilities near fences or natural barriers such that lands not taken are rendered less readily accessible to vehicles, agricultural implements and aircraft used in crop work, as well as damages resulting from ozone effects and other physical phenomena associated with such lines, including but not limited to interference with telephone, television and radio communication.
182.017(7)(c)(c) In constructing and maintaining high-voltage transmission lines on the property covered by the easement the utility shall:
182.017(7)(c)1.1. If excavation is necessary, ensure that the top soil is stripped, piled and replaced upon completion of the operation.
182.017(7)(c)2.2. Restore to its original condition any slope, terrace, or waterway which is disturbed by the construction or maintenance.
182.017(7)(c)3.3. Insofar as is practicable and when the landowner requests, schedule any construction work in an area used for agricultural production at times when the ground is frozen in order to prevent or reduce soil compaction.
182.017(7)(c)4.4. Clear all debris and remove all stones and rocks resulting from construction activity upon completion of construction.
182.017(7)(c)5.5. Satisfactorily repair to its original condition any fence damaged as a result of construction or maintenance operations. If cutting a fence is necessary, a temporary gate shall be installed. Any such gate shall be left in place at the landowner’s request.
182.017(7)(c)6.6. Repair any drainage tile line within the easement damaged by such construction or maintenance.
182.017(7)(c)7.7. Pay for any crop damage caused by such construction or maintenance.
182.017(7)(c)8.8. Supply and install any necessary grounding of a landowner’s fences, machinery or buildings.
182.017(7)(d)(d) The utility shall control weeds and brush around the transmission line facilities. No herbicidal chemicals may be used for weed and brush control without the express written consent of the landowner. If weed and brush control is undertaken by the landowner under an agreement with the utility, the landowner shall receive from the utility a reasonable amount for such services.
182.017(7)(e)(e) The landowner shall be afforded a reasonable time prior to commencement of construction to harvest any trees located within the easement boundaries, and if the landowner fails to do so, the landowner shall nevertheless retain title to all trees cut by the utility.
182.017(7)(f)(f) The landowner shall not be responsible for any injury to persons or property caused by the design, construction or upkeep of the high-voltage transmission lines or towers.
182.017(7)(g)(g) The utility shall employ all reasonable measures to ensure that the landowner’s television and radio reception is not adversely affected by the high-voltage transmission lines.
182.017(7)(h)(h) The utility may not use any lands beyond the boundaries of the easement for any purpose, including ingress to and egress from the right-of-way, without the written consent of the landowner.
182.017(7)(i)(i) The rights conferred under pars. (c) to (h) may be specifically waived by the landowner in an easement conveyance which contains such paragraphs verbatim.
182.017(8)(8) Commission review.
182.017(8)(a)(a) Upon complaint by a company that a regulation by a municipality under sub. (1r) is unreasonable, the commission shall set a hearing and, if the commission finds that the regulation is unreasonable, the regulation shall be void. Subject to pars. (am) to (c), if the commission determines that a municipal regulation that was in effect on January 1, 2007, and immediately prior to January 9, 2008, or that a community standard, as demonstrated through consistent practice and custom in the municipality, that was in effect on January 1, 2007, and immediately prior to January 9, 2008, is substantially the same as the municipal regulation complained of, there is a rebuttable presumption that the latter regulation is reasonable.
182.017(8)(am)(am) A municipal regulation is unreasonable if it has the effect of creating a moratorium on the placement of company lines or systems under sub. (1r) or on the entrance into the municipality of a video service provider, as defined in s. 66.0420 (2) (zg), or is inconsistent with the purposes of s. 66.0420.
182.017(8)(as)(as) Notwithstanding sub. (2), a municipal regulation is unreasonable if it requires a company to pay any part of the cost to modify or relocate the company’s facilities to accommodate an urban rail transit system.
182.017(8)(b)(b) A municipal regulation is unreasonable if it requires a company to pay more than the actual cost of functions undertaken by the municipality to manage company access to and use of municipal rights-of-way. These management functions include all of the following:
182.017(8)(b)1.1. Registering companies, including the gathering and recording of information necessary to conduct business with a company.
182.017(8)(b)2.2. Except as provided in provided in par. (c), issuing, processing, and verifying excavation or other company permit applications, including supplemental applications.
182.017(8)(b)3.3. Inspecting company job sites and restoration projects.
182.017(8)(b)4.4. Maintaining, supporting, protecting, or moving company equipment during work in municipal rights-of-way.
182.017(8)(b)5.5. Undertaking restoration work inadequately performed by a company after providing notice and the opportunity to correct the work.
182.017(8)(b)6.6. Revoking company permits.
182.017(8)(b)7.7. Maintenance of databases.
182.017(8)(b)8.8. Scheduling and coordinating highway, street, and right-of-way work relevant to a company permit.
182.017(8)(c)(c) A municipal regulation is unreasonable if it requires a company to be responsible for fees under s. 182.0175 (1m) (bm) that may be assessed to a municipality as a member of the one-call system under s. 182.0175.
182.017(8)(d)(d) It is reasonable for a municipal regulation to provide for the recovery of costs incurred under par. (b) 1., 2., 3., and 7. through a preexcavation permit fee.
182.017(8)(e)(e) It is reasonable for a municipal regulation to provide for the recovery of costs incurred under par. (b) 4., 5., and 6. only from the company that is responsible for causing the municipality to incur the costs.
182.017(9)(9) Time limit for permits. If a municipality establishes a permit process under sub. (1r), the municipality shall approve or deny a permit application no later than 60 days after receipt of the application, and, if the municipality fails to do so, the municipality shall be considered to have approved the application and granted the permit. If a municipality denies a permit application, the municipality shall provide the applicant a written explanation of the reasons for the denial at the time that the municipality denies the application.
182.017 AnnotationSub. (2) is a safety statute, the violation of which constitutes negligence per se. An allegation that a power pole located within four feet of the traveled portion of a roadway violated this provision stated a cause of action. Weiss v. Holman, 58 Wis. 2d 608, 207 N.W.2d 660 (1973).
182.017 AnnotationSub. (5) is limited to damages arising from the construction, maintenance, or abandonment of facilities within a right-of-way. Vogel v. Grant-Lafayette Electric Cooperative, 195 Wis. 2d 198, 536 N.W.2d 140 (Ct. App. 1995), 94-0822.
182.017 AnnotationSub. (7) (a) governs what must be specified in a conveyance of an easement. Because the easements here were conveyed prior to the enactment of the statute, the conveyances were not subject to the statute’s requirements. The circuit court’s conclusion that the utility was required to obtain new easements complying with sub. (7) (a) was premised on its erroneous conclusion that the utility’s easement rights were limited by the easements’ current use. Wisconsin Public Service Corp. v. Andrews, 2009 WI App 30, 316 Wis. 2d 734, 766 N.W.2d 232, 07-2673.
182.017 AnnotationSub. (7) (a) requires a utility to specify the length and width of the transmission line right-of-way, but sub. (7) (a) does not require the utility to specify the length and width of the entirety of its easement. Sub. (7) (h) prohibits a utility from using lands beyond the boundaries of the easement, but it does not impose any requirements on how those boundaries must be described in a jurisdictional offer or an easement conveyance. Indeed, sub. (7) (h) does not purport to circumscribe the rights that can be granted in an easement in any way. William C. & Nancy K. Hanson Revocable Trust v. American Transmission Co., 2024 WI App 55, 413 Wis. 2d 686, 12 N.W.3d 867, 23-1327.
The 12 cases that cite Wis. Stat. § 182.017 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENWisconsin Pub. Serv. Corp. v. Andrews, 2009 WI App 30, 766 N.W.2d 232.
cites § 182.017 10×subsections: (7) 2× (7)(a) 2×cited by 17 cases
Where it cites § 182.017
“WPSC contends the court erred when determining WPSC could not build the new transmission line under the 1972 easements, but was instead required to obtain new easements that complied with Wis.”
2
REDVogel v. Grant-Lafayette Elec. Coop., 536 N.W.2d 140 (Wis. Ct. App. 1995).
cites § 182.017 22×subsections: (5) 18× (2) 2×cited by 9 cases
Reversed by Vogel v. Grant-Lafayette Electric Cooperative (1996): the Wisconsin Supreme Court's own opinion in this case.
Where it cites § 182.017
“Section 182.017 deals generally with acquisition of easements for electric transmission and the construction and maintenance of power lines, poles and towers on the acquired lands.”
3
GREENGallagher v. Grant-Lafayette Elec. Coop., 2001 WI App 276, 637 N.W.2d 80.
cites § 182.017 11×subsections: (5) 3×cited by 9 cases
Where it cites § 182.017
“The court also ruled that damages for annoyance and inconvenience were not available in the absence of a nuisance claim, which the Gallaghers were not asserting; and it ruled that the Gallaghers were not entitled to punitive damages for damages occurring outside the right-of-way…”
4
GREENWeiss v. Holman, 207 N.W.2d 660 (Wis. 1973).
cites § 182.017 5×cited by 43 cases
Where it cites § 182.017
“” 9 Lacking specific exclusion or inclusion of sec. 182.017, Stats., in the class of cases in which the statutory violation results in per se negligence, the general rules relating thereto must be examined.”
The case’s holding
Statutes in pari materia dealing with the same subject matter must be read together and harmonized whenever possible.
Later courts cite it for
“it has long been settled in this state that statutes in pari materia, i.e., dealing with the same subject matter, must be read together and harmonized if possible.” · 3 citing courts
5
GREENMorris v. Juneau Cnty., 579 N.W.2d 690 (Wis. 1998).
cites § 182.017 3×subsections: (2)cited by 26 cases
Where it cites § 182.017
“01(22) to interpret Wis. Stat. § 182.017 (2) (1973) regarding the duties of public utilities in placing power poles.”
The case’s holding
Statutory definitions provided in one section of the criminal code apply to other sections of the chapter (applying § 340.01(22) in a case involving a different section of ch. 81).
Later courts cite it for
“insufficiency or want of repairs of any highway.” · 1 citing court
6
GREENFields v. Am. Transmission Co., 2010 WI App 59, 782 N.W.2d 729.
cites § 182.017 4×cited by 4 cases
Where it cites § 182.017
“" The circuit court initially agreed with the Fields that the statute precluded any expanded use of the transmission line easement beyond its existing use, and granted the motion to exclude. ¶ 3. After permitting further argument, however, the court determined the statute did…”
7
GREENWeyauwega Tel. Co. v. Pub. Serv. Comm'n, 111 N.W.2d 559 (Wis. 1961).
cites § 182.017 2×cited by 10 cases
Where it cites § 182.017
“is operating in the town under an indeterminate permit, but contends that the area to which such permit extends is confined to that in which it has made a profession of service as evidenced by its exchange-area map filed with the PSC.”
8
NO FLAGMark T. Hodgson v. Am. Transmission Co. (Wis. Ct. App. 2024).
cites § 182.017 37×subsections: (7)(h) 28× (7) 7× (7)(a)cited by 0 cases
Where it cites § 182.017
“017(7)(h) is part of a more comprehensive statutory section, § 182.017, that specifically governs transmission lines.”
9
NEUTRALGray v. Wisconsin Tel. Co., 140 N.W.2d 203 (Wis. 1966).
cites § 182.017 1×cited by 14 cases
Where it cites § 182.017
“The legislative history of sec. 182.017, Stats., was not specifically alluded to by counsel but it is significant in construing the statute.”
10
GREENIn Interest of EJH, 334 N.W.2d 77 (Wis. 1983).
cites § 182.017 1×subsections: (2)cited by 3 cases
Where it cites § 182.017
“He alleged that the utility pole, placed within four feet of the roadway, obstructed the public use of the highway in violation of sec. 182.017(2), Stats. *444 The court applied the definition of highway in sec.”
11
NO FLAGTschanz, Shawn v. WPPI Energy, No. 3:19-cv-00896 (W.D. Wis. May 4, 2020).
cites § 182.017 4×cited by 0 casesunknown
Where it cites § 182.017
“The proposed new easement that defendants outlined for plaintiffs included the property rights contained in Wis. Stat. § 182.017 (7) for easements for high-voltage transmission lines.”
12
NO FLAGJT Props. of Mt Horeb, LLC v. Am. Transmission Co., 21 N.W.3d 122 (Wis. Ct. App. 2025).
cites § 182.017 2×subsections: (7)(a) (7)(h)cited by 0 casesunpublished
Where it cites § 182.017
“§ 182.017(7)(a). The parties do not dispute that 20.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196019922025

One bar per 2 years. Tallest: 2 cases in 2024–2025. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Wis. Ct. App.6Wis.5W.D. Wis.1
By subsection
(2)3 cases
Vogel v. Grant-Lafayette Elec. Coop., 536 N.W.2d 140 (Wis. Ct. App. 1995).“Section 182.017 deals generally with acquisition of easements for electric transmission and the construction and maintenance of power lines, poles and towers on the acquired lands.”
Morris v. Juneau Cnty., 579 N.W.2d 690 (Wis. 1998).“01(22) to interpret Wis. Stat. § 182.017 (2) (1973) regarding the duties of public utilities in placing power poles.”
In Interest of EJH, 334 N.W.2d 77 (Wis. 1983).“He alleged that the utility pole, placed within four feet of the roadway, obstructed the public use of the highway in violation of sec. 182.017(2), Stats. *444 The court applied the definition of highway in sec.”
(5)2 cases
Vogel v. Grant-Lafayette Elec. Coop., 536 N.W.2d 140 (Wis. Ct. App. 1995).
Gallagher v. Grant-Lafayette Elec. Coop., 2001 WI App 276, 637 N.W.2d 80.“The court also ruled that damages for annoyance and inconvenience were not available in the absence of a nuisance claim, which the Gallaghers were not asserting; and it ruled that the Gallaghers were not entitled to punitive damages for damages occurring outside the right-of-way…”
(7)2 cases
Wisconsin Pub. Serv. Corp. v. Andrews, 2009 WI App 30, 766 N.W.2d 232.“WPSC contends the court erred when determining WPSC could not build the new transmission line under the 1972 easements, but was instead required to obtain new easements that complied with Wis.”
Mark T. Hodgson v. Am. Transmission Co. (Wis. Ct. App. 2024).“017(7)(h) is part of a more comprehensive statutory section, § 182.017, that specifically governs transmission lines.”
(7)(a)3 cases
Wisconsin Pub. Serv. Corp. v. Andrews, 2009 WI App 30, 766 N.W.2d 232.
JT Props. of Mt Horeb, LLC v. Am. Transmission Co., 21 N.W.3d 122 (Wis. Ct. App. 2025).“§ 182.017(7)(a). The parties do not dispute that 20.”
(7)(h)2 cases
JT Props. of Mt Horeb, LLC v. Am. Transmission Co., 21 N.W.3d 122 (Wis. Ct. App. 2025).
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.