Road grades not to obstruct natural drainage, landowners not to obstruct highway drainage; remedies

Edition and currency
laws through the 2025-26 session (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2025-26 session (checked Sept. 2026) cited 1967–2023 15citing cases
At a glance

Courts have cited this section in 15 opinions since 1967, 3 of them in the last five years. The most litigated part is subsection (2)(c) (8 cases).

88.8788.87 Road grades not to obstruct natural drainage, landowners not to obstruct highway drainage; remedies.
88.87(1)(1) It is recognized that the construction of highways and railroad grades must inevitably result in some interruption of and changes in the preexisting natural flow of surface waters and that changes in the direction or volume of flow of surface waters are frequently caused by the erection of buildings, dikes and other facilities on privately owned lands adjacent to highways and railroad grades. The legislature finds that it is necessary to control and regulate the construction and drainage of all highways and railroad grades so as to protect property owners from damage to lands caused by unreasonable diversion or retention of surface waters due to a highway or railroad grade construction and to impose correlative duties upon owners and users of land for the purpose of protecting highways and railroad grades from flooding or water damage.
88.87(2)(2) 
88.87(2)(a)(a) Whenever any county, town, city, village, railroad company or the department of transportation has heretofore constructed and now maintains or hereafter constructs and maintains any highway or railroad grade in or across any marsh, lowland, natural depression, natural watercourse, natural or man-made channel or drainage course, it shall not impede the general flow of surface water or stream water in any unreasonable manner so as to cause either an unnecessary accumulation of waters flooding or water-soaking uplands or an unreasonable accumulation and discharge of surface waters flooding or water-soaking lowlands. All such highways and railroad grades shall be constructed with adequate ditches, culverts, and other facilities as may be feasible, consonant with sound engineering practices, to the end of maintaining as far as practicable the original flow lines of drainage. This paragraph does not apply to highways or railroad grades used to hold and retain water for cranberry or conservation management purposes.
88.87(2)(b)(b) Drainage rights and easements may be purchased or condemned by the public authority or railroad company having control of the highway or railroad grade to aid in the prevention of damage to property owners which might otherwise occur as a result of failure to comply with par. (a).
88.87(2)(c)(c) If a city, village, town, county or railroad company or the department of transportation constructs and maintains a highway or railroad grade not in accordance with par. (a), any property owner damaged by the highway or railroad grade may, within 3 years after the alleged damage occurred, file a claim with the appropriate governmental agency or railroad company. The claim shall consist of a sworn statement of the alleged faulty construction and a description, sufficient to determine the location of the lands, of the lands alleged to have been damaged by flooding or water-soaking. Within 90 days after the filing of the claim, the governmental agency or railroad company shall either correct the cause of the water damage, acquire rights to use the land for drainage or overflow purposes, or deny the claim. If the agency or company denies the claim or fails to take any action within 90 days after the filing of the claim, the property owner may bring an action in inverse condemnation under ch. 32 or sue for such other relief, other than damages, as may be just and equitable.
88.87(2)(d)(d) Failure to give the requisite notice by filing a claim under par. (c) does not bar action on the claim if the city, village, town, county, railroad company or department of transportation had actual notice of the claim within 3 years after the alleged damage occurred and the claimant shows to the satisfaction of the court that the delay or failure to give the requisite notice has not been prejudicial to the defendant city, village, town, county, railroad company or department of transportation.
88.87(3)(3) 
88.87(3)(a)(a) It is the duty of every owner or user of land who constructs any building, structure or dike or otherwise obstructs the flow of stream water through any watercourse or natural or man-made channel or obstructs the flow of surface water through any natural or man-made channel, natural depression or natural draw through which surface waters naturally flow:
88.87(3)(a)1.1. To provide and at all times maintain a sufficient drainage system to protect a downstream highway or railroad grade from water damage or flooding caused by such obstruction, by directing the flow of surface waters into existing highway or railroad drainage systems; and
88.87(3)(a)2.2. To protect an upstream highway or railroad grade from water damage or flooding caused by such obstruction, by permitting the flow of such water away from the highway or railroad grade substantially as freely as if the obstruction had not been created.
88.87(3)(b)(b) Whoever fails or neglects to comply with a duty imposed by par. (a) is liable for all damages to the highway or railroad grade caused by such failure or neglect. The authority in charge of maintenance of the highway or the railroad company which constructed or maintains the railroad grade may bring an action to recover such damages. An action under this paragraph shall be commenced within the time provided by s. 893.59 or be barred.
88.87(3)(c)(c) The authorities in charge of maintenance of highways or railroad companies maintaining railroad grades and their agents and employees may enter any lands for the purpose of removing an obstruction in a watercourse or highway drainage ditch which is in violation of par. (a) and which is flooding or causing damage to a highway under its jurisdiction.
88.87(4)(4) If a railway company fails to comply with sub. (2), any person aggrieved thereby may file a complaint with the office of the commissioner of railroads setting forth the facts. The office shall investigate and determine the matter in controversy in accordance with ch. 195, and any order it makes in such proceeding has the same effect as an order in any other proceeding properly brought under ch. 195.
88.87 HistoryHistory: 1977 c. 29 s. 1654 (8) (c), (9) (f); 1979 c. 323; 1981 c. 347; 1993 a. 16, 123, 456.
88.87 AnnotationSub. (2) (c) requirements are mandatory conditions precedent to bringing an action under this section. Van v. Town of Manitowoc Rapids, 150 Wis. 2d 929, 442 N.W.2d 557 (Ct. App. 1989).
88.87 AnnotationThis statute preempts common law claims; the claims period under sub. (2) (c) begins to run when the damage is first discovered and is not extended if damage continues. Pruim v. Town of Ashford, 168 Wis. 2d 114, 483 N.W.2d 242 (Ct. App. 1992). But see Southport Commons, LLC v. DOT, 2021 WI 52, 397 Wis. 2d 362, 960 N.W.2d 17, 19-0130.
88.87 AnnotationDespite a finding that a railroad was not responsible for increased water flow that resulted in flooding, an order to the railroad to install a drainage pipe was proper. Soo Line Railroad v. Office of Commissioner of Transportation, 170 Wis. 2d 543, 489 N.W.2d 672 (Ct. App. 1992).
88.87 AnnotationSub. (2) (a) imposes a duty on railroads to refrain from impeding water flow. The railroad commissioner may act prospectively under sub. (4) to prevent flooding. Sub. (2) (c) applies when there has been actual damage, but does not require actual damage for the commissioner to act under sub. (4). Chicago & North Western Transportation Co. v. Office of Commissioner of Railroads, 204 Wis. 2d 1, 553 N.W.2d 845 (Ct. App. 1996), 95-2509.
88.87 AnnotationThis section does not impose on a circuit court a positive duty to grant injunctive relief under specified conditions, but provides an alternative remedy to an action for damages under ch. 32. The common law preference for legal over equitable relief applies. As such, to obtain an injunction it must be shown that the injunction is necessary to prevent future harm to the property and there is no adequate legal remedy. Kohlbeck v. Reliance Construction Co., 2002 WI App 142, 256 Wis. 2d 235, 647 N.W.2d 277, 01-1404.
88.87 AnnotationParties who can state a claim against the Department of Transportation under both this section and s. 32.10 may choose to file suit in either Dane County or the county in which the property lies. Kohlbeck v. Reliance Construction Co., 2002 WI App 142, 256 Wis. 2d 235, 647 N.W.2d 277, 01-1404.
88.87 AnnotationThe state was not a proper party for claims against the Department of Transportation (DOT) as the two are distinct legal entities. Service on the state of a summons and complaint that named the state and not DOT as a party did not constitute service on DOT necessary to establish personal jurisdiction over DOT. Hoops Enterprises, III, LLC v. Super Western, Inc., 2013 WI App 7, 345 Wis. 2d 733, 827 N.W.2d 120, 12-0062.
88.87 Annotation“Occurred” in the context of sub. (2) (c) does not mean “discovered.” The notice of claim period in sub. (2) (c) begins to run when the damage happens or takes place. Southport Commons, LLC v. DOT, 2021 WI 52, 397 Wis. 2d 362, 960 N.W.2d 17, 19-0130.
88.87 AnnotationSub. (2) (c) provides the remedies for property owners for damages manifested by flooding allegedly caused by the construction or repair of a highway. The only claims that are permitted under sub. (2) (c) are those for inverse condemnation under ch. 32 and equitable claims for relief other than damages. Sub. (2) (d) merely confirms that the remedies listed in sub. (2) (c) are still available even if the property owner fails to strictly comply with the requirements of sub. (2) (c), provided that the governmental entity has actual notice of the claim and the owner can prove no prejudice. Ricciardi v. Town of Lake, 2024 WI App 3, 410 Wis. 2d 490, 2 N.W.3d 793, 22-1567.
88.87 AnnotationUnder sub. (2) (c), damage occurs when a governmental entity fails to construct or maintain a highway or railroad grade pursuant to sub. (2) (a), regardless of when any resultant water accumulation is discovered. If flooding does not occur or does not occur within three years of the governmental entity’s faulty maintenance or construction, the claim is barred. Ricciardi v. Town of Lake, 2024 WI App 3, 410 Wis. 2d 490, 2 N.W.3d 793, 22-1567.
88.87 AnnotationThis section, by its terms, is not limited to faults in the construction of a railroad grade. If negligent maintenance, by itself or in conjunction with shortcomings in construction, results in flooding, this section, and its limitations on the available remedies, applies to the claims of an injured property owner. Nothing in this section itself supports the notion that its scope is limited to conduct that gives rise to repeated flooding. Boyer v. BNSF Railway Co., 824 F.3d 694 (2016).
The 15 cases that cite Wis. Stat. § 88.87 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSouthport Commons, LLC v. DOT, 2021 WI 52, 397 Wis. 2d 362.
cites § 88.87 54×subsections: (2)(c) 12×cited by 15 cases
Where it cites § 88.87
“2019AP130 determining that its notice of claim pursuant to Wis. Stat. § 88.87 (2)(c) (2017-18)2 was not timely filed.”
The case’s holding
For the highway drainage notice-of-claim statute, the three-year period runs from when the damage occurs, not from when the owner discovers it.
Later courts cite it for
“the legislature is presumed to 'carefully and precisely' choose statutory language to express a desired meaning.” · 4 citing courts
2
cites § 88.87 129×subsections: (4) 34× (2)(c) 22× (2) 13× (1) 9×cited by 8 cases
Where it cites § 88.87
“CNW challenges the Commissioner's interpretation and application of § 88.87, STATS. Interpretation of a statute and its application to the undisputed facts of a case are questions of law which we review de novo.”
3
GREENKohlbeck v. Reliance Const. Co., 2002 WI App 142, 647 N.W.2d 277.
cites § 88.87 45×subsections: (2)(a) 2× (2)(c)cited by 21 cases
Where it cites § 88.87
“We conclude that the Kohlbecks have stated a claim under Wis. Stat. §§ 88.87 and 32.10, as well as art.”
The case’s holding
A complaint is tested only for legal sufficiency and dismissal is proper only if no relief can be granted under any provable set of facts.
Later courts cite it for
“in determining whether a party has stated a claim, we are concerned only with the legal sufficiency of the complaint.” · 2 citing courts
4
GREENSoo Line R.R. v. Off. of the Comm'r of Transp., 489 N.W.2d 672 (Wis. Ct. App. 1992).
cites § 88.87 24×subsections: (2)(a) 4× (3) 4× (1) 3× (4)cited by 8 cases
Where it cites § 88.87
“Relying on the provisions of sec. 88.87, Stats., 1 Knuth requested the Office of the Commissioner of *548 Transportation (OTC) to order Soo Line to install an additional 60" drainage pipe to alleviate the backed-up floodwaters.”
Later courts cite it for
“any grade across any drainage course, sec. 88.87(2)(a), even if the increased flow arises from” · 1 citing court
5
GREENLins v. Blau, 584 N.W.2d 183 (Wis. Ct. App. 1998).
cites § 88.87 44×subsections: (2)(c) 32× (2)(d) 2× (1) (2)(a)cited by 3 cases
Where it cites § 88.87
“In December 1995, the Linses filed a complaint alleging, among other claims, that the Town and the County violated § 88.87, Stats., when it impeded the general flow of water so as to cause an unnecessary accumulation and discharge of waters, which flooded the Linses' property.”
Later courts cite it for
“was enacted to regulate the construction and drainage of all highways in order to protect property owners from damage to lands caused by unreasonable diversion or retention of surface waters due to the construction of highways or railroad beds.” · 2 citing courts
6
GREENBoyer v. BNSF Ry. Co., 824 F.3d 694 (7th Cir. 2016).
cites § 88.87 3×cited by 33 cases
Where it cites § 88.87
“In relevant part, the court held that Wis. Stat. § 88.87 provides the exclusive remedy when the negligent design and maintenance of a railroad grade has caused an obstruction to a waterway or drainage course and resulted in flooding.”
Later courts cite it for
“does not prohibit a court from revisiting an issue when there is a legitimate reason to do so, whether it be a change in circumstances, new evidence, or something the court overlooked earlier.” · 6 citing courts
7
GREENHoops Enter., III, LLC v. Super W., Inc., 2013 WI App 7, 827 N.W.2d 120.
cites § 88.87 12×subsections: (2)(a)cited by 6 cases
Where it cites § 88.87
“The circuit court denied the State's motion, concluding that Wis. Stat. §§ 88.87 and 32.18 2 authorized the claims asserted by Hoops against *736 the State.”
Later courts cite it for
“a motion to dismiss on the grounds of sovereign immunity is a challenge to a court's personal jurisdiction.” · 2 citing courts
8
GREENTrinity Petroleum, Inc. v. Scott Oil Co., 2007 WI 88, 735 N.W.2d 1.
cites § 88.87 4×cited by 33 cases
Where it cites § 88.87
“38 (2) (1961-62), which permitted a suit for damages under factual circumstances such as Niesen presented, was repealed and recreated as Wis. Stat. § 88.87 by ch. 572, Laws of 1963.”
The case’s holding
A new procedural rule applies retroactively unless it diminishes a contract, disturbs vested rights, or imposes an unreasonable burden on the party required to comply.
Later courts cite it for
“if these factors are met, the judicial holding in question should not be applied retroactively.” · 2 citing courts
9
GREENPruim v. Town of Ashford, 483 N.W.2d 242 (Wis. Ct. App. 1992).
cites § 88.87 11×subsections: (1) 2× (2)(c)cited by 6 cases
Where it cites § 88.87
“The two issues in this case relate to sec. 88.87, Stats., the statute addressing a property owner's right to sue the government for flooding or water damage due to faulty construction or repair of highways.”
10
GREENVan v. Town of Manitowoc Rapids, 442 N.W.2d 557 (Wis. Ct. App. 1989).
cites § 88.87 7×subsections: (2) 5×cited by 12 cases
Where it cites § 88.87
“Section 88.87, Stats., has no "savings clause.”
11
NO FLAGCarl A. Ricciardi v. Town of Lake, 2 N.W.3d 793 (Wis. Ct. App. 2023).
cites § 88.87 78×subsections: (2)(c) 25× (2)(d) 11× (2)(a) 9× (2) 6×
Where it cites § 88.87
“¶5 We also conclude that the Ricciardis’ inverse condemnation claim was untimely. Under WIS. STAT. § 88.87, the damage occurs when the governmental entity fails to construct or maintain a highway or railroad grade pursuant to para.”
12
GREENIrish v. BNSF Ry. Co., 674 F.3d 710 (7th Cir. 2012).
cites § 88.87 3×cited by 3 cases
Where it cites § 88.87
“at *2-*3, but agreed that Wis. Stat. § 88.87 provided the exclusive remedy based on the types of facts alleged in this case and that relief was foreclosed to the plaintiffs under that statute because they had not filed a timely notice of claim, id.”
13
NEUTRALSouthport Commons, LLC v. DOT, 2020 WI App 26, 392 Wis. 2d 207.
cites § 88.87 17×subsections: (2)(c) 16× (2)(d)cited by 1 case
Where it cites § 88.87
“§ 88.87(2)(c) (2017-18)1 (emphasis added), really means the claim needed to be filed within three years after the alleged damage was discovered.”
14
NO FLAGUnited Am., LLC v. Wisconsin Dep't of Transp., 3 N.W.3d 514 (Wis. Ct. App. 2023).
cites § 88.87 9×subsections: (2)(c) 6× (2)(a) 2× (2)unpublished
Where it cites § 88.87
“§ 88.87(2) further illustrates our conclusion that WIS.”
15
NO FLAGNiesen v. State, 154 N.W.2d 316 (Wis. 1967).
cites § 88.87 1×
Where it cites § 88.87
“1963, and recreated it as a part of sec. 88.87, Stats. 1965 by the enactment of ch.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196719952023

One bar per year. Tallest: 2 cases in 1992. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Wis. Ct. App.10Wis.37th Cir.2
By subsection
(1)4 cases
Chicago & North W. Transp. Co. v. Off. of the Comm'r of Railroads, 553 N.W.2d 845 (Wis. Ct. App. 1996).“CNW challenges the Commissioner's interpretation and application of § 88.87, STATS. Interpretation of a statute and its application to the undisputed facts of a case are questions of law which we review de novo.”
Soo Line R.R. v. Off. of the Comm'r of Transp., 489 N.W.2d 672 (Wis. Ct. App. 1992).“Relying on the provisions of sec. 88.87, Stats., 1 Knuth requested the Office of the Commissioner of *548 Transportation (OTC) to order Soo Line to install an additional 60" drainage pipe to alleviate the backed-up floodwaters.”
Pruim v. Town of Ashford, 483 N.W.2d 242 (Wis. Ct. App. 1992).“The two issues in this case relate to sec. 88.87, Stats., the statute addressing a property owner's right to sue the government for flooding or water damage due to faulty construction or repair of highways.”
Lins v. Blau, 584 N.W.2d 183 (Wis. Ct. App. 1998).“In December 1995, the Linses filed a complaint alleging, among other claims, that the Town and the County violated § 88.87, Stats., when it impeded the general flow of water so as to cause an unnecessary accumulation and discharge of waters, which flooded the Linses' property.”
(2)4 cases
Van v. Town of Manitowoc Rapids, 442 N.W.2d 557 (Wis. Ct. App. 1989).“Section 88.87, Stats., has no "savings clause.”
Carl A. Ricciardi v. Town of Lake, 2 N.W.3d 793 (Wis. Ct. App. 2023).“¶5 We also conclude that the Ricciardis’ inverse condemnation claim was untimely. Under WIS. STAT. § 88.87, the damage occurs when the governmental entity fails to construct or maintain a highway or railroad grade pursuant to para.”
United Am., LLC v. Wisconsin Dep't of Transp., 3 N.W.3d 514 (Wis. Ct. App. 2023).“§ 88.87(2) further illustrates our conclusion that WIS.”
(2)(a)7 cases
Kohlbeck v. Reliance Const. Co., 2002 WI App 142, 647 N.W.2d 277.“We conclude that the Kohlbecks have stated a claim under Wis. Stat. §§ 88.87 and 32.10, as well as art.”
Soo Line R.R. v. Off. of the Comm'r of Transp., 489 N.W.2d 672 (Wis. Ct. App. 1992).
Hoops Enter., III, LLC v. Super W., Inc., 2013 WI App 7, 827 N.W.2d 120.“The circuit court denied the State's motion, concluding that Wis. Stat. §§ 88.87 and 32.18 2 authorized the claims asserted by Hoops against *736 the State.”
Lins v. Blau, 584 N.W.2d 183 (Wis. Ct. App. 1998).
Showing the top 5 of 7. More in the list view →
(2)(b)1 case
(2)(c)8 cases
Southport Commons, LLC v. DOT, 2021 WI 52, 397 Wis. 2d 362.“2019AP130 determining that its notice of claim pursuant to Wis. Stat. § 88.87 (2)(c) (2017-18)2 was not timely filed.”
Lins v. Blau, 584 N.W.2d 183 (Wis. Ct. App. 1998).
Kohlbeck v. Reliance Const. Co., 2002 WI App 142, 647 N.W.2d 277.
Southport Commons, LLC v. DOT, 2020 WI App 26, 392 Wis. 2d 207.“§ 88.87(2)(c) (2017-18)1 (emphasis added), really means the claim needed to be filed within three years after the alleged damage was discovered.”
Showing the top 5 of 8. More in the list view →
(2)(d)3 cases
Lins v. Blau, 584 N.W.2d 183 (Wis. Ct. App. 1998).
Carl A. Ricciardi v. Town of Lake, 2 N.W.3d 793 (Wis. Ct. App. 2023).
Southport Commons, LLC v. DOT, 2020 WI App 26, 392 Wis. 2d 207.
(3)1 case
Soo Line R.R. v. Off. of the Comm'r of Transp., 489 N.W.2d 672 (Wis. Ct. App. 1992).
(4)2 cases
Soo Line R.R. v. Off. of the Comm'r of Transp., 489 N.W.2d 672 (Wis. Ct. App. 1992).
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2025-26 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.