Wyoming Statutes

Wyo. Stat. § 29-1-201 (2026)

Definitions; agency relationships presumed.

✓ text as retrieved May 2026 (this copy records no edition or section history)
SyfertCases citing this section WY-LEGwyoleg.gov JustiaTitle on Justia CornellLII Search CasesGoogle Scholar
(a)   Except as otherwise provided, as used in this act:

          (i)   "Contractor" means:

               (A) A person employed by and contracting with an
owner to improve an owner's property including:
                      (I)    An architect;

                      (II)    A professional engineer; and

                      (III)   A surveyor.

         (ii)    "Furnish" includes selling or renting;

         (iii)   "Improve or improvement" means:

               (A) Demolition, erection, alteration or repair
of any property for its permanent benefit;

               (B) Any work performed or material furnished for
the permanent change of any real property; and

                (C)   Materials manufactured pursuant to contract.

          (iv) "Lien claimant" means any person who claims a
lien under this act pursuant to a contract for improvement of
property entered into by an owner of the property;

         (v)    "Owner" means:

               (A) With respect to construction liens: any
person with a legal or equitable interest in the property to be
changed, altered or improved, for whose use or benefit any
improvement shall be made or any materials furnished;

               (B) With respect to mines, quarries, oil, gas or
other wells: a person holding any interest in the legal or
equitable title, or both, to any leasehold for oil or gas
purposes and purchasers under executory contract, receivers and
trustees;

               (C) With respect to ditches, canals and
reservoirs: a person holding any interest in the legal or
equitable title to any ditch, canal or reservoir including
rights-of-way, water permits, ditch rights and related easements
of any type or kind. "Owner" includes purchasers under executory
contract, receivers and trustees.

          (vi) "Subcontractor" means a person, other than a
contractor performing work for a contractor or subcontractor
under contract;
          (vii) "Work" shall be as requested, authorized or
ratified under contract.

           (viii)    "Material" means:

               (A)    Component parts incorporated into the
project;

               (B) Equipment and machinery, whether or not
incorporated into the project; and

               (C)    Fuel and lubricants consumed in a project.

          (ix) "Materialman" means a person other than a
contractor who furnishes material to, but does not perform work
for, an owner, a contractor or subcontractor under contract;

          (x) "Property" means real property, personal
property, or both;

          (xi) "Real property" means all interests in real
property, including but not limited to, the fee estate,
leasehold interests, easements and rights of way;

          (xii) "Send" or "sent" means, in connection with any
writing or written notice, to deposit in the mail or deliver for
transmission by any other usual means of communication with
postage or cost of transmission provided for and properly
addressed and, in the case of an instrument to an address
specified thereon or otherwise agreed, or if no address is
specified, to any address reasonable under the circumstances.
The foregoing method of delivery includes delivery by any
commercial carrier that requests and maintains a receipt for
delivery of written documents and also includes an electronic
record as set forth in the Uniform Electronic Transactions Act
if the sender and recipient have previously communicated by
electronic means. In the event any writing is transmitted by
mail with the United States postal service, such writing shall
be mailed by first class mail, by certified mail, return receipt
requested, or by mail delivery requiring a receipt for delivery.
The time a writing is deemed to have been sent is the time at
which the writing is deposited in the mail or delivered for
transmission by any other means and, in the case of an
electronic record, the time of sending is as specified in W.S.
40-21-115;
          (xiii) "Written" or "writing" means printing,
typewriting or any other intentional reduction to tangible form,
including an electronic record created, generated, sent,
communicated, received or restored by electronic means;

          (xiv)    "This act" means W.S. 29-1-103 through
29-10-106.

     (b) Only the following agency relationships are presumed
in this act:

          (i) If any spouse enters into a contract for the
performance of any work or the furnishing of any materials for
the benefit of the property of the other spouse for which a lien
is provided by this act, the spouse contracting for the work
shall be presumed to be the agent of the spouse owning the
property;

         (ii)     Between joint tenants;

         (iii)     Among tenants in common; and

         (iv)     An employee is an agent of his employer.
Notes of Decisions
Cited in 11 cases (1 in the last 5 years), 1983–2021 · leading case: Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985).
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). · cites it 29× “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Michael's Constr., Inc. v. Am. Nat'l Bank, 2012 WY 76, 278 P.3d 701. · cites it 3× “It supports its position with several definitions set forth in Wyo. Stat. Ann. § 29-1-201 (LexisNexis 2011): (a) Except as otherwise provided, as used in this title: 2 (i) "Contractor" means: (A) A person employed by and contracting with an owner to improve an owner's property…”
Alpine Lumber Co. v. Capital West Nat'l Bank, 2010 WY 62, 231 P.3d 869. · cites it 3× “[19] The statute contains the following definitions: § 29-1-201. Definitions; agency relationships presumed.”
Stricker v. Frauendienst, 669 P.2d 520 (Wyo. 1983). · cites it 6× “Appellants contend that the lien statement did not conform with the requirements of §§ 29-1-201 through 29-1-309, W.S.1977 (June 1981 replacement), because it was not signed by a person authorized by law.”
Diamond Hill Inv. Co v. Shelden, 767 P.2d 1005 (Wyo. 1989). · cites it 4× “Wyo. Stat. § 29-1-201(a)(i)(A)(I) (1977) provides that, for purposes of the Wyoming lien statutes, an architect is a contractor.”
Dobson v. Portrait Homes, Inc., 2005 WY 95, 117 P.3d 1200. · cites it 2× “See Wyo. Stat. Ann. § 29-1-201 (a)(vi) (LexisNexis 2003).”
Horning v. Penrose Plumbing & Heating Inc., 2014 WY 133, 336 P.3d 151. · cites it 2× “§ 29-1-201(a)Gif) (1997). ... Improvement.”
Bredthauer v. TSP, 864 P.2d 442 (Wyo. 1993). “§ 29-1-201(a)(iii) (1981) (emphasis added).”
D & L Bldg., Inc. v. State ex rel. Maltby Tank & Barge, Inc., 747 P.2d 517 (Wyo. 1987). · cites it 2× “We are not persuaded by appellants’ arguments that § 16-6-112 should receive a narrower construction based on an analogy to federal statutes, or by applying definitions of terms set out in § 29-1-201, W.S. 1977 (June 1981 Replacement).”
MARY'S BAKE SHOPPE v. City of Cheyenne, 2008 WY 116, 193 P.3d 252. · cites it 2× “" Wyo. Stat. Ann. § 29-1-201 (a)@iv) (Lex-isNexis 2007).”
Douglas Matthew Schrier Living Trust Dated April 22, 2015 v. Excel Concrete & Excavation, LLC, 2021 WY 86, 492 P.3d 273. · cites it 3× “See Wyo. Stat. Ann. § 29-1-201 (a)(i), (vi) (LexisNexis 2021).”
Wyo. Stat. § 29-1-201(a): 3 cases
Alpine Lumber Co. v. Capital West Nat'l Bank, 2010 WY 62, 231 P.3d 869. “[19] The statute contains the following definitions: § 29-1-201. Definitions; agency relationships presumed.”
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Horning v. Penrose Plumbing & Heating Inc., 2014 WY 133, 336 P.3d 151. “§ 29-1-201(a)Gif) (1997). ... Improvement.”
Wyo. Stat. § 29-1-201(a)(i): 1 case
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Wyo. Stat. § 29-1-201(a)(i)(A): 1 case
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Wyo. Stat. § 29-1-201(a)(i)(A)(I): 1 case
Diamond Hill Inv. Co v. Shelden, 767 P.2d 1005 (Wyo. 1989). “Wyo. Stat. § 29-1-201(a)(i)(A)(I) (1977) provides that, for purposes of the Wyoming lien statutes, an architect is a contractor.”
Wyo. Stat. § 29-1-201(a)(iii): 2 cases
Bredthauer v. TSP, 864 P.2d 442 (Wyo. 1993). “§ 29-1-201(a)(iii) (1981) (emphasis added).”
Horning v. Penrose Plumbing & Heating Inc., 2014 WY 133, 336 P.3d 151. “§ 29-1-201(a)Gif) (1997). ... Improvement.”
Wyo. Stat. § 29-1-201(a)(iii)(B): 1 case
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Wyo. Stat. § 29-1-201(a)(v)(A): 2 cases
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Diamond Hill Inv. Co v. Shelden, 767 P.2d 1005 (Wyo. 1989). “Wyo. Stat. § 29-1-201(a)(i)(A)(I) (1977) provides that, for purposes of the Wyoming lien statutes, an architect is a contractor.”
Wyo. Stat. § 29-1-201(a)(vi): 1 case
Weyerhaeuser Co. v. Walters, 707 P.2d 733 (Wyo. 1985). “Appellant Weyerhaeuser Company raises a single issue for our consideration: "Whether, under the present construction lien statutes of Wyoming, W.S. § 29-1-201 (1981) et seq., the Appellant is a `contractor', entitled to one hundred twenty (120) days in which to file its lien…”
Wyo. Stat. § 29-1-201(b): 1 case
Stricker v. Frauendienst, 669 P.2d 520 (Wyo. 1983). “Appellants contend that the lien statement did not conform with the requirements of §§ 29-1-201 through 29-1-309, W.S.1977 (June 1981 replacement), because it was not signed by a person authorized by law.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.