Ala. Code § 6-5-220 (2026)
Definitions.
Edition and currency
Other sources
Courts have cited this section in 12 opinions since 2003, 4 of them in the last five years. The most litigated part is subsection (e) (7 cases).
As used in this article, the following words and phrases used herein shall have the following meaning ascribed to them:
(a) BUILDER. Any individual, partnership, firm, or corporation that constructed, or performed or managed the construction of, an improvement, or any portion thereof, on or to real estate, and at the time of the construction was licensed as a general contractor in the State of Alabama.
(b) ARCHITECT. Any individual who, at the time the architectural services were performed, was legally qualified to practice architecture and held an unexpired registration as an architect in the State of Alabama; any partnership, corporation, professional corporation, or professional association which, at the time the architectural services were performed, was legally qualified to practice architecture in the State of Alabama; and all employees or agents of the registered architect or of his or her entity or firm acting under the instruction, control, or supervision of the registered architect.
(c) ENGINEER. Any individual who, at the time the engineering services were performed, was legally qualified to practice engineering and held an unexpired registration as a professional engineer in the State of Alabama; any individual who, at the time the engineering services were performed, was legally qualified to practice engineering and was certified as an engineer-in-training in the State of Alabama; any partnership, firm, or corporation which, at the time the engineering services were performed, was legally qualified to practice engineering and held an unexpired certificate of authorization to practice engineering in the State of Alabama; and all employees or agents of the registered engineer or of his or her entity or firm acting under the instruction, control, or supervision of the registered engineer.
(d) SUBSTANTIAL COMPLETION OF CONSTRUCTION OR CONSTRUCTION OF IMPROVEMENT. The time at which the construction of the improvement on or to real estate is sufficiently completed so that the owner, tenant, or other person can occupy or utilize the improvement, or a designated portion thereof, for the use for which it is intended.
(e) CAUSE OF ACTION ACCRUES OR ARISES. The time when a person is injured, including injury which results in death, or when property is damaged as a proximate result of a defect or deficiency in design, planning, testing, supervision, administration, or observation of construction of an improvement by an architect or engineer or in the construction of an improvement on or to real estate, constructed, performed, or managed by a builder; or where the damage or injury either is latent or by its nature is not discoverable in the exercise of reasonable diligence at the time of its occurrence, the claim for relief shall be deemed to arise or accrue at the time the damage or injury is or in the exercise of reasonable diligence should have been first discovered, whichever is earlier. The cause of action accrues or arises whether or not the full amount of damages is apparent at the time of the first injury or damage, and cannot be extended as a continuous wrong. Property damage shall include both physical damages to, and defective condition of, the property.
(f) CONSTRUCTION or CONSTRUCTED. Includes building, constructing, erecting, fabricating, or assembling.
(g) IMPROVEMENT ON OR TO REAL PROPERTY. Anything that is constructed on or to real property, whether on, under, or over land or water, that enhances the value of real property permanently for general uses, including, without limitation, buildings, structures, fixtures, walls, fences, locks, dams, embankments, bulkheads, docks, jetties, drilling and other platforms and rigs, highways, bridges, canals, ditches, waterways, railroads, sewers, pipelines, pole lines, storage tanks, machinery, equipment and other improvements, and any extension, alteration, addition, or portion thereof.
(Acts 1994, No. 94-138, p. 183, §1.)
- Where it cites § 6-5-220
- “This "discovery rule," however, is limited to actions against an "architect, engineer, or builder, as defined in [§§ 6-5-220 through -228]." Ala.Code 1975, § 6-5-221(b) (emphasis added).”
- The case’s holding
- Summary judgment cannot be entered against a nonmoving party based on a failure of proof unless the moving party specifically challenges that failure of proof in its motion.
- Later courts cite it for
- “an action alleging a breach of warranty is a subset of a breach-of-contract action.” · 4 citing courts
- Where it cites § 6-5-220
- “The Dickinsons concede that Ala.Code 1975, §§ 6-5-220 through 6-5-225 govern their claims against Land Developers.”
- The case’s holding
- The discovery rule does not apply where a homeowner discovered overt problems that should have led to the latent defect's source more than two years before suit, starting limitations.
- Where it cites § 6-5-220
- “See Ala. Code § 6-5-220 et seq. Therefore, the court must determine which Alabama statute controls the limitations period for each of ATCU's claims.”
- Later courts cite it for
- “rule 9(b) exists to prevent complainants from crying 'fraud' only to go on a fishing expedition during discovery to try to find some evidence of fraud.” · 2 citing courts
- Where it cites § 6-5-220
- “Statute of Limitations Burkes first argues that this case is controlled by Ala.Code 1975, §§ 6-5-220 to -228, applicable to civil actions against, among others, "builders who constructed, or performed or managed the construction of, an improvement on or to real property designed…”
- Later courts cite it for
- “the notice must be timely in that it must not come so late that the indemnitor is prejudiced in preparing the defense.” · 2 citing courts
- Where it cites § 6-5-220
- “" Section 6-5-220(e), Ala. Code 1975, further provides that the two-year period described in § 6-5-221(a) begins to run "at the time the damage or injury is or in the exercise of reasonable diligence should *921 have been first discovered, whichever is earlier.”
- The case’s holding
- A negligence or breach-of-fiduciary-duty claim requires a duty owed to the plaintiff, and whether a duty exists is generally a question of law for the court.
- Later courts cite it for
- “the existence of a fiduciary duty, a breach of that duty, and damage suffered as a result of that breach.” · 8 citing courts
- Where it cites § 6-5-220
- “The statutory scheme of which § 6-5-220 is a part has no application here because Walter Mitchell d/b/a Southern Classic was not a “builder” within the meaning of § 6-5-220(a).”
- Later courts cite it for
- “under alabama law, the test of agency is the right of control, whether exercised or not. ... for one to be an agent, the other party must retain the right to direct the manner in which the business shall be done, as well as the results to be accomplished ....” · 3 citing courts
- Where it cites § 6-5-220
- “At the times pertinent to this appeal, § 6-5-221 (a) provided: “(a) All civil actions in tort, contract, or otherwise against any architect or engineer performing or furnishing the design, planning, specifications, testing, supervision, administration, or observation of any…”
- Where it cites § 6-5-220
- “Code §§ 6-5-220 (a) & 6-5-221(a). Specifically, § 6-5-221(a) provides, in pertinent part: All civil actions in tort, contract, or otherwise .”
- Where it cites § 6-5-220
- “§ 6-5-220 et seq. Section § 6-5-223 of Article 13A sets out the general applicability of the article, and it does not apply to naval architects or vessels.”
- Where it cites § 6-5-220
- “Section 6-5-220, Ala. Code 1975, which concerns actions against contractors, architects, and engineers, defines an "improvement on or to real property" as: "Anything that is constructed on or to real property, whether on, under, or over land or water, that enhances the value of…”
- Where it cites § 6-5-220
- “First, we note that the record reflects that, in its complaints against each of the Pharmacies, OptumRx alleged, among other things, that "[a] real, bona fide controversy exists, as defined by [the Declaratory Judgment Act, see] Alabama Code § 6-5-220 (1975), et seq., between…”
- Where it cites § 6-5-220
- “2000) (applying both the vested-rights approach and the common-law-rights approach in examining whether the statute of repose found in § 6-5-220 et seq., Ala. Code 1975, violates § 13).”
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 3 cases in 2024. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
(a)4 cases
(e)7 cases
(g)1 case