10 C.F.R. § 50.59 (2026)

Changes, tests, and experiments

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1994–2021 8citing cases
At a glance

Courts have cited this section in 8 opinions since 1994, 1 of them in the last five years.

(a) Definitions for the purposes of this section:

(1) Change means a modification or addition to, or removal from, the facility or procedures that affects a design function, method of performing or controlling the function, or an evaluation that demonstrates that intended functions will be accomplished.

(2) Departure from a method of evaluation described in the FSAR (as updated) used in establishing the design bases or in the safety analyses means:

(i) Changing any of the elements of the method described in the FSAR (as updated) unless the results of the analysis are conservative or essentially the same; or

(ii) Changing from a method described in the FSAR to another method unless that method has been approved by NRC for the intended application.

(3) Facility as described in the final safety analysis report (as updated) means:

(i) The structures, systems, and components (SSC) that are described in the final safety analysis report (FSAR) (as updated),

(ii) The design and performance requirements for such SSCs described in the FSAR (as updated), and

(iii) The evaluations or methods of evaluation included in the FSAR (as updated) for such SSCs which demonstrate that their intended function(s) will be accomplished.

(4) Final Safety Analysis Report (as updated) means the Final Safety Analysis Report (or Final Hazards Summary Report) submitted in accordance with § 50.34, as amended and supplemented, and as updated per the requirements of § 50.71(e) or § 50.71(f), as applicable.

(5) Procedures as described in the final safety analysis report (as updated) means those procedures that contain information described in the FSAR (as updated) such as how structures, systems, and components are operated and controlled (including assumed operator actions and response times).

(6) Tests or experiments not described in the final safety analysis report (as updated) means any activity where any structure, system, or component is utilized or controlled in a manner which is either:

(i) Outside the reference bounds of the design bases as described in the final safety analysis report (as updated) or

(ii) Inconsistent with the analyses or descriptions in the final safety analysis report (as updated).

(b) This section applies to each holder of an operating license issued under this part or a combined license issued under part 52 of this chapter, including the holder of a license authorizing the operation of a nuclear power reactor that has submitted the certification of permanent cessation of operations required under § 50.82(a)(1) or § 50.110, a reactor licensee whose license has been amended to allow possession of nuclear fuel but not operation of the facility, or a non-power production or utilization facility that has permanently ceased operations.

(c)(1) A licensee may make changes in the facility as described in the final safety analysis report (as updated), make changes in the procedures as described in the final safety analysis report (as updated), and conduct tests or experiments not described in the final safety analysis report (as updated) without obtaining a license amendment pursuant to § 50.90 only if:

(i) An amendment to the technical specifications incorporated in the license is not required, and

(ii) The change, test, or experiment does not meet any of the criteria in paragraph (c)(2) of this section.

(2) A licensee shall obtain a license amendment pursuant to § 50.90 prior to implementing a proposed change, test, or experiment if the change, test, or experiment would:

(i) Result in more than a minimal increase in the frequency of occurrence of an accident previously evaluated in the final safety analysis report (as updated);

(ii) Result in more than a minimal increase in the likelihood of occurrence of a malfunction of a structure, system, or component (SSC) important to safety previously evaluated in the final safety analysis report (as updated);

(iii) Result in more than a minimal increase in the consequences of an accident previously evaluated in the final safety analysis report (as updated);

(iv) Result in more than a minimal increase in the consequences of a malfunction of an SSC important to safety previously evaluated in the final safety analysis report (as updated);

(v) Create a possibility for an accident of a different type than any previously evaluated in the final safety analysis report (as updated);

(vi) Create a possibility for a malfunction of an SSC important to safety with a different result than any previously evaluated in the final safety analysis report (as updated);

(vii) Result in a design basis limit for a fission product barrier as described in the FSAR (as updated) being exceeded or altered; or

(viii) Result in a departure from a method of evaluation described in the FSAR (as updated) used in establishing the design bases or in the safety analyses.

(3) In implementing this paragraph, the FSAR (as updated) is considered to include FSAR changes resulting from evaluations performed pursuant to this section and analyses performed pursuant to § 50.90 since submittal of the last update of the final safety analysis report pursuant to § 50.71 of this part.

(4) The provisions in this section do not apply to changes to the facility or procedures when the applicable regulations establish more specific criteria for accomplishing such changes.

(d)(1) The licensee shall maintain records of changes in the facility, of changes in procedures, and of tests and experiments made pursuant to paragraph (c) of this section. These records must include a written evaluation which provides the bases for the determination that the change, test, or experiment does not require a license amendment pursuant to paragraph (c)(2) of this section.

(2) The licensee shall submit, as specified in § 50.4 or § 52.3 of this chapter, as applicable, a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each. A report must be submitted at intervals not to exceed 24 months. For combined licenses, the report must be submitted at intervals not to exceed 6 months during the period from the date of application for a combined license to the date the Commission makes its findings under 10 CFR 52.103(g).

(3) The records of changes in the facility must be maintained until the termination of an operating license issued under this part, a combined license issued under part 52 of this chapter, or the termination of a license issued under 10 CFR part 54, whichever is later. Records of changes in procedures and records of tests and experiments must be maintained for a period of 5 years.

[64 FR 53613, Oct. 4, 1999, as amended at 66 FR 64738, Dec. 14, 2001; 72 FR 49500, Aug. 28, 2007; 89 FR 57720, July 16, 2024; 89 FR 106251, Dec. 30, 2024]
The 8 cases that cite 10 C.F.R. § 50.59 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 50.59 7×cited by 248 cases
Where it cites § 50.59
“” 10 C.F.R. § 50.59 (a)(1). If the proposed change is inconsistent with the license, or does involve an unreviewed safety question (as that term is defined in 10 C.”
The case’s holding
An agency must provide a reasoned explanation when significantly departing from its own precedent to avoid being arbitrary and capricious.
Later courts cite it for
“it is not sufficient for a party to mention a possible argument in the most skeletal way, leaving the court to ... put flesh on its bones.” · 12 citing courts
2
GREENBabcock & Wilcox Co. v. Areva NP, Inc., 788 S.E.2d 237 (Va. 2016).
cites § 50.59 1×cited by 80 cases
Where it cites § 50.59
“The contract's scope included the performance of "[a] Loop Nuclear Steam Supply System (NSSS) structural analysis"; "[e]valuations and reanalyses, where required, of plant events and accidents"; and "a Licensing Report for input to Buyer's 10CFR50.59 Safety Evaluation." 24 J.A.…”
The case’s holding
The search for intent in an unambiguous contract provision ends with the plain, usual, and ordinary meaning of the words themselves.
Later courts cite it for
“there can be no misappropriation where acquisition, disclosure, and use of a trade secret have been expressly authorized by contract.” · 4 citing courts
3
GREENWisconsin Elec. Power Co. v. United States, 90 Fed. Cl. 714 (Fed. Cl. 2009).
cites § 50.59 1×cited by 24 cases
Where it cites § 50.59
“(PX 652 at WXE0001 0156; 10 C.F.R. § 50.59 .) James Becka, 51 Project *755 Manager, Dry Fuel Storage Group, had no hesitancy about adding this load to the slab.”
The case’s holding
A party may recover reasonable mitigation costs incurred to limit damages from a partial breach, where those costs were reasonably foreseeable, substantially caused by the breach, and proven with reasonable certainty.
Later courts cite it for
“would have occurred in 1999 even if doe had begun performance in 1998.” · 5 citing courts
4
GREENKelley v. Selin, 42 F.3d 1501 (6th Cir. 1995).
cites § 50.59 1×cited by 35 cases
Where it cites § 50.59
“10 C.F.R. § 50.59 . The record does not support petitioners’ suggestion that the NRC blindly listens to the “self serving” assertions of licensees.”
The case’s holding
Landowners alleging harm to aesthetic interests, physical health, or property value from nuclear waste storage have sufficient injury to establish standing.
Later courts cite it for
“determine whether the agency has, in fact, adequately studied the issue and taken a hard look at the environmental consequences of its decision.” · 5 citing courts
cites § 50.59 2×cited by 1 case
Where it cites § 50.59
“entitled under the terms of its POL and without further NRC approval, to undertake any decommissioning activity that does not (a) foreclose the release of the site for possible unrestricted use, (b) significantly increase decommissioning costs, (c) cause any significant…”
6
NO FLAGDairyland Power Coop. v. United States, No. 18-1922 (Fed. Cl. Dec. 7, 2021).
cites § 50.59 4×cited by 0 casesunpublished
Where it cites § 50.59
“42 (Christians); see also 10 C.F.R. §50.59 (regulations requiring Nuclear Regulatory Commission (“NRC”) pre-approval of dismantlement of equipment or systems necessary to run a nuclear power plant) Dairyland represents that during this Round (2013-18), they distinguished…”
7
GREENBabcock & Wilcox v. AREVA, No. 150830 (Va. June 30, 2016).
cites § 50.59 1×cited by 0 cases
Where it cites § 50.59
“The contract’s scope included the performance of “[a] Loop Nuclear Steam Supply System (NSSS) structural analysis”; “[e]valuations and reanalyses, where required, of plant events and accidents”; and “a Licensing Report for input to Buyer’s 10CFR50.59 Safety Evaluation.” 24 J.A.…”
8
GREENCitizens Awareness v. NRC, No. 94-1562 (1st Cir. July 20, 1995).
cites § 50.59 1×cited by 0 cases
Where it cites § 50.59
“2 On June 30, 1993, the Commission issued another SRM reiterating its new decommissioning policy, and stating that it had voted to formally amend 10 C.F.R. 50.59 to reflect this new position.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
199420072021

One bar per year. Tallest: 3 cases in 1995. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
1st Cir.2Fed. Cl.2Va.26th Cir.1D. Mass.1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.