C.F.R.Title 18Chapter I—Federal Energy Regulatory Commission, Department of EnergySubchapter B—Regulations Under the Federal Power ActPart 4—Licenses, Permits, Exemptions, And Determination of Project CostsSubpart D—Application for Preliminary Permit, License or Exemption: General Provisions

18 C.F.R. § 4.30 (2026)

Applicability and definitions

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1977–2011 15citing cases
At a glance

Courts have cited this section in 15 opinions since 1977. The most litigated part is subsection (b)(9)(iii) (3 cases).

(a) (1) This subpart applies to applications for preliminary permit, license, or exemption from licensing.

(2) Any potential applicant for an original license for which prefiling consultation begins on or after July 23, 2005 and which wishes to develop and file its application pursuant to this part, must seek Commission authorization to do so pursuant to the provisions of part 5 of this chapter.

(b) For the purposes of this part—

(1)(i) Competing development application means any application for a license or exemption from licensing for a proposed water power project that would develop, conserve, and utilize, in whole or in part, the same or mutually exclusive water resources that would be developed, conserved, and utilized by a proposed water power project for which an initial preliminary permit or initial development application has been filed and is pending before the Commission.

(ii) Competing preliminary permit application means any application for a preliminary permit for a proposed water power project that would develop, conserve, and utilize, in whole or in part, the same or mutually exclusive water resources that would be developed, conserved and utilized by a proposed water power project for which an initial preliminary permit or initial development application has been filed and is pending before the Commission.

(2) Conduit means any tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. The term not primarily for the generation of electricity includes but is not limited to a conduit:

(i) Which was built for the distribution of water for agricultural, municipal, or industrial consumption and is operated for such a purpose; and

(ii) To which a hydroelectric facility has been or is proposed to be added.

(3) Construction of a dam, for the purposes of provisions governing application for exemption of a small conduit hydroelectric facility, means any construction, repair, reconstruction, or modification of a dam that creates a new impoundment or increases the normal maximum surface elevation or the normal maximum surface area of an existing impoundment.

(4)(i) Dam, for the purposes of provisions governing application for license of a major project—existing dam, means any structure for impounding or diverting water.

(ii) Dam, for the purposes of provisions governing an application for exemption of a small conduit hydroelectric facility or a notice of intent to construct a qualifying conduit hydropower facility, means any structure that impounds water.

(iii) Dam, for the purposes of provisions governing application for exemption of a small hydroelectric power project, means any structure for impounding water, including any diversion structure that is designed to obstruct all or substantially all of the flow of a natural body of water.

(5) Development application means any application for either a license or exemption from licensing for a proposed water power project.

(6)(i) Existing dam, for the purposes of provisions governing application for license of a major project—existing dam, means any dam (as defined in paragraph (b)(4)(i) of this section) that has already been constructed and which does not require any construction or enlargement of impoundment structures other than repairs or reconstruction.

(ii) Existing dam, for the purposes of provisions governing application for exemption of a small hydroelectric power project, means any dam, the construction of which was completed on or before July 22, 2005, and which does not require any construction or enlargement of impoundment structures (other than repairs or reconstruction) in connection with the installation of any small hydroelectric power project.

(7) Existing impoundment, for the purposes of provisions governing application for license of a major project—existing dam, means any body of water that an existing dam impounds.

(8) Federal lands, for the purposes of provisions governing an application for exemption of a small conduit hydroelectric facility or a small hydroelectric power project, means any lands to which the United States holds fee title.

(9)(i) Fish and wildlife agencies means the United States Fish and Wildlife Service, the National Marine Fisheries Service, and the state agency in charge of administrative management over fish and wildlife resources of the state in which a proposed hydropower project is located.

(ii) Fish and wildlife recommendation means any recommendation designed to protect, mitigate damages to, or enhance any wild member of the animal kingdom, including any migratory or nonmigratory mammal, fish, bird, amphibian, reptile, mollusk, crustacean, or other invertebrate, whether or not bred, hatched, or born in captivity, and includes any egg or offspring thereof, related breeding or spawning grounds, and habitat. A “fish and wildlife recommendation” includes a request for a study which cannot be completed prior to licensing, but does not include a request that the proposed project not be constructed or operated, a request for additional pre-licensing studies or analysis or, as the term is used in §§ 4.34(e)(1) and 4.34(f)(3), a recommendation for facilities, programs, or other measures to benefit recreation or tourism.

(10) Indian tribe means, in reference to a proposal to apply for a license or exemption for a hydropower project, an Indian tribe which is recognized by treaty with the United States, by federal statute, or by the U.S. Department of the Interior in its periodic listing of tribal governments in the Federal Register in accordance with 25 CFR 83.6(b), and whose legal rights as a tribe may be affected by the development and operation of the hydropower project proposed (as where the operation of the proposed project could interfere with the management and harvest of anadromous fish or where the project works would be located within the tribe's reservation).

(11)(i) Initial development application means any acceptable application for either a license or exemption from licensing for a proposed water power project that would develop, conserve, and utilize, in whole or in part, water resources for which no other acceptable application for a license or exemption from licensing has been submitted for filing and is pending before the Commission.

(ii) Initial preliminary permit application means any acceptable application for a preliminary permit for a proposed water power project that would develop, conserve, and utilize, in whole or in part, water resources for which no other acceptable preliminary permit application has been submitted for filing and is pending before the Commission.

(12) Install or increase, for the purposes of provisions governing application for exemption of a small hydroelectric power project, means to add new generating capacity at a site that has no existing generating units, to replace or rehabilitate an abandoned or unused existing generating unit, or to increase the generating capacity of any existing power plant by installing an additional generating unit or by rehabilitating an operable generating unit in a way that increases its rated electric power output.

(13) Licensed water power project means a project, as defined in section 3(11) of the Federal Power Act, that is licensed under Part I of the Federal Power Act.

(14) Major modified project means any major project—existing dam, as defined in paragraph (b)(16) of this section, that would include:

(i) Any repair, modification or reconstruction of an existing dam that would result in a significant change in the normal maximum surface area or the normal maximum surface elevation of an existing impoundment; or

(ii) Any change in existing project works or operations that would result in a significant environmental impact.

(15) Major unconstructed project means any unlicensed water power project that would:

(i) Have a total installed generating capacity of more than 1.5 MW; and

(ii) Use the water power potential of a dam and impoundment which, at the time application is filed, have not been constructed.

(16) Major project—existing dam means a licensed or unlicensed, existing or proposed water power project that would:

(i) Have a total installed generating capacity or more than 2,000 horsepower (1.5 MW); and

(ii) Not use the water power potential provided by any dam except an existing dam.

(17) Minor water power project means any licensed or unlicensed, existing or proposed water power project that would have a total installed generation capacity of 2,000 horsepower (1.5 MW), or less.

(18) New development, for the purposes of provisions governing application for license of a major project—existing dam, means any construction, installation, repair, reconstruction, or other change in the existing state of project works or appurtenant facilities, including any dredging and filling in project waters.

(19) New license means any license, except an annual license issued under section 15 of the Federal Power Act, for a water power project that is issued under the Federal Power Act after the initial license for that project.

(20) Non-Federal lands, for the purposes of provisions governing application for exemption of a small conduit hydroelectric facility or a small hydroelectric power project, means any lands except lands to which the United States holds fee title.

(21) Non-federally owned conduit, for the purposes of provisions governing the notice of intent to construct qualifying conduit hydropower facilities, means any conduit except a conduit to which the United States holds fee title.

(22) Person means any individual and, as defined in section 3 of the Federal Power Act, any corporation, municipality, or state.

(23) Project, for the purposes of provisions governing application for exemption of a small hydroelectric power project, means:

(i) The impoundment and any associated dam, intake, water conveyance facility, power plant, primary transmission line, and other appurtenant facility if a lake or similar natural impoundment or a manmade impoundment is used for power generation; or

(ii) Any diversion structure other than a dam and any associated water conveyance facility, power plant, primary transmission line, and other appurtenant facility if a natural water feature other than a lake or similar natural impoundment is used for power generation.

(24) Qualified exemption applicant, means any person who meets the requirements specified in § 4.31(c)(2) with respect to a small hydroelectric power project for which exemption from licensing is sought.

(25) Qualified license applicant means any person to whom the Commission may issue a license, as specified in section 4(e) of the Federal Power Act.

(26) Qualifying conduit hydropower facility, means a facility, not including any dam or impoundment, that is not required to be licensed under Part I of the FPA because it is determined to meet the following criteria:

(i) Generates electric power using only the hydroelectric potential of a non-federally owned conduit;

(ii) Has an installed capacity that does not exceed 40 megawatts (MW); and,

(iii) Was not licensed or exempted from the licensing requirements of Part I of the FPA on or before August 9, 2013.

(27) Ready for environmental analysis means the point in the processing of an application for an original or new license or exemption from licensing which has been accepted for filing, where substantially all additional information requested by the Commission has been filed and found adequate.

(28) Real property interests, for the purposes of provisions governing application for exemption of a small conduit hydroelectric facility or a small hydroelectric power project, includes ownership in fee, rights-of-way, easements, or leaseholds.

(29) Resource agency means a Federal, state, or interstate agency exercising administration over the areas of flood control, navigation, irrigation, recreation, fish and wildlife, water resource management (including water rights), or cultural or other relevant resources of the state or states in which a project is or will be located.

(30) Small conduit hydroelectric facility, means an existing or proposed hydroelectric facility that is constructed, operated, or maintained for the generation of electric power, and includes all structures, fixtures, equipment, and lands used and useful in the operation or maintenance of the hydroelectric facility, but excludes the conduit on which the hydroelectric facility is located and the transmission lines associated with the hydroelectric facility and which:

(i) Utilizes for electric power generation the hydroelectric potential of a conduit;

(ii) Has an installed generating capacity that does not exceed 40 MW;

(iii) Is not an integral part of a dam;

(iv) Discharges the water it uses for power generation either:

(A) Into a conduit;

(B) Directly to a point of agricultural, municipal, or industrial consumption; or

(C) Into a natural water body if a quantity of water equal to or greater than the quantity discharged from the hydroelectric facility is withdrawn from that water body downstream into a conduit that is part of the same water supply system as the conduit on which the hydroelectric facility is located; and

(v) Does not rely upon construction of a dam, which construction will create any portion of the hydrostatic head that the facility uses for power generation unless that construction would occur for agricultural, municipal, or industrial consumptive purposes even if hydroelectric generating facilities were not installed.

(31) Small hydroelectric power project, means any project in which capacity will be installed or increased after the date of application under subpart K of this chapter, which will have a total installed capacity of not more than 10 MW, and which:

(i) Would utilize for electric power generation the water power potential of an existing dam that is not owned or operated by the United States or by an instrumentality of the Federal Government, including the Tennessee Valley Authority; or

(ii)(A) Would utilize for the generation of electricity a natural water feature, such as a natural lake, waterfall, or the gradient of a natural stream, without the need for a dam or man-made impoundment; and

(B) Would not retain water behind any structure for the purpose of a storage and release operation.

(32) PURPA benefits means benefits under section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). Section 210(a) of PURPA requires electric utilities to purchase electricity from, and to sell electricity to, qualifying facilities.

[Order 413, 50 FR 11676, Mar. 25, 1985] Editorial Note:For Federal Register citations affecting § 4.30, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.
The 15 cases that cite 18 C.F.R. § 4.30 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENNat'l Wildlife Fed'n v. Consumers Power Co., 862 F.2d 580 (6th Cir. 1988).
cites § 4.30 2×cited by 74 cases
Where it cites § 4.30
“" 18 C.F.R. 4.30(4); 18 C.F.R. 4.50(b)(1) (1983); 18 C.”
The case’s holding
The release of water containing entrained fish from a hydroelectric facility does not constitute an addition of pollutants to navigable waters requiring a permit under the Clean Water Act.
Later courts cite it for
“to restore and maintain the chemical, physical and biological integrity of the nation's waters.” · 3 citing courts
cites § 4.30 1×subsections: (b)(9)(iii)cited by 64 cases
Where it cites § 4.30
“Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: 84 The definition of the term `fishway' contained in 18 C.F.R. 4.30(b)(9)(iii), as in effect on the date of enactment of this Act [Oct.”
The case’s holding
An agency's reasonable interpretation of a silent statute is permissible under the Chevron framework.
Later courts cite it for
“we are mindful that this court steadfastly abides by the principle that 'legislative history - no matter how clear - can't override statutory text.” · 3 citing courts
cites § 4.30 1×cited by 15 cases
Later courts cite it for
“arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” · 4 citing courts
cites § 4.30 1×cited by 9 cases
Where it cites § 4.30
“18 C.F.R. § 4.30 (b)(ll)(i). According to Land Company, Hydro Power’s filing was an initial development application because it is an application for a license to use resources for which no license application *919 was pending — even though a preliminary-permit application had…”
cites § 4.30 1×cited by 8 cases
Where it cites § 4.30
“* FERC grants case-specific exemptions from licensing to small hydroelectric projects of five megawatts or less (18 CFR 4.30).”
Later courts cite it for
“clear legal right to relief or that prohibition would provide a more complete and efficacious remedy than the administrative proceeding and resulting judicial review” · 6 citing courts
6
GREENPuget Sound Power & Light Co. v. Pub. Util. Dist. No. 1, 565 P.2d 1221 (Wash. Ct. App. 1977).
cites § 4.30 1×cited by 13 cases
Where it cites § 4.30
“Conservation of Power and Water Resources, 18 C.F.R. §§ 4.30 and 4.41 (1975). While the scope and content of exhibit R is discretionary with Chelan, it is discretionary within its proprietary character and not within its legislative character.”
7
GREENCity of Gillette v. Fed. Energy Regulatory Comm'n, 737 F.2d 883 (10th Cir. 1984).
cites § 4.30 1×cited by 12 cases
Where it cites § 4.30
“§ 798 ; 18 C.F.R. § 4.30 (b), (c). The recipient also has priority over competing applicants for licenses after the preliminary permit expires.”
Later courts cite it for
“sufficiently detailed to allow a reviewing tribunal to appraise the agency's determination under the appropriate standards of review.” · 2 citing courts
8
GREENRivers v. Comm'n, 201 F.3d 1186 (9th Cir. 2000).
cites § 4.30 2×subsections: (b)(9)(iii)cited by 19 cases
Where it cites § 4.30
“2, 1991) (previously codified at 18 C.F.R. § 4.30 (b)(9)(iii) (1992)). Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: The definition of the term ‘fishway’ contained in 18 C.”
The case’s holding
The Commission may define the no-action alternative as continued operation under existing licenses and use existing environmental conditions as the baseline for environmental impact analysis.
Later courts cite it for
“we are mindful that this court steadfastly abides by the principle that 'legislative history-no matter how clear-can't override statutory text.” · 5 citing courts
9
GREENKamargo Corp. v. Fed. Energy Regulatory Comm'n, 852 F.2d 1392 (D.C. Cir. 1988).
cites § 4.30 1×cited by 10 cases
Where it cites § 4.30
“IV 1986); 18 C.F.R. § 4.30 (b)(19) (1987). The Commission initially said “yes” and then reversed itself; and as the issue was being litigated in several courts of appeals, 2 Congress intervened.”
Later courts cite it for
“we recognize that this case presents a difficult problem for the commission, but we think it has no alternative but to confront the questions raised by the commissioner's dissent.” · 2 citing courts
cites § 4.30 1×cited by 5 cases
Where it cites § 4.30
“18 C.F.R. § 4.30 (b)(17) (1988). The proposed New Kernsville Dam Project with a rated generation capacity of 630 kilowatts falls within the regulatory definition.”
cites § 4.30 1×cited by 10 cases
Where it cites § 4.30
“” 18 C.F.R. § 4.30 (b)(9)(ii) (1996). . We also expressed concern over the possibility of an endless cycle of rehearings in Southern Natural Gas Co.”
12
GREENAm. Rivers v. Fed. Energy Regulatory Comm'n, 187 F.3d 1007 (9th Cir. 1999).
cites § 4.30 2×subsections: (b)(9)(iii)cited by 1 case
Where it cites § 4.30
“2, 1991) (previously codified at 18 C.F.R. § 4.30 (b)(9)(iii) (1992)). Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: ' The definition of the term “fishway” contained in 18 C.”
13
GREENSteamboaters v. Fed. Energy Regulatory, Comm'n, 759 F.2d 1382 (9th Cir. 1985).
cites § 4.30 1×cited by 3 cases
Where it cites § 4.30
“11677, 11687, 11688 (1985) (to be codified at 18 C.F.R. §§ 4.30 (b)(9), 4.94(b), 4.106(b)) (issued March 20, 1985).”
The case’s holding
An agency must prepare an environmental assessment and provide a convincing statement of reasons why potential environmental effects are insignificant before deciding not to prepare an environmental impact statement.
Later courts cite it for
“agency must supply a convincing statement of reasons why potential effects are insignificant.” · 10 citing courts
14
GREENCity of Bedford v. Fed. Energy Regulatory Comm'n, 718 F.2d 1164 (D.C. Cir. 1983).
cites § 4.30 2×cited by 1 case
Where it cites § 4.30
“18 C.F.R. § 4.30 (d) (1983). Thus, any applicant for a license or permit who intends to cede operating control of the project to a nonapplicant files an invalid and perhaps unlawful application.”
15
NO FLAGGreen Island Power Auth. v. Fed. Energy Regulatory Comm'n, No. 07-1737 (2d Cir. Aug. 10, 2009).
cites § 4.30 1×
Summary
No passage or summary on file for this case yet.

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197719942011

One bar per year. Tallest: 2 cases in 1988. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.49th Cir.32d Cir.210th Cir.13rd Cir.16th Cir.1Fed. Cir.1N.Y.1

The 8 courts with the most citing cases, of 9 courts in all.

By subsection
(b)(9)(iii)3 cases
Am. Rivers Pac. Rivers Council Oregon Nat. Resources Council Waterwatch of Oregon & Friends of the Earth, United States Dep't of Interior, Petitioner-Intervenor v. Fed. Energy Regulatory Comm'n, Eugene Water & Elec. Bd., Respondent-Intervenor. Oregon Dep't of Fish & Wildlife v. Fed. Energy Regulatory Comm'n, Eugene Water & Elec. Bd., Respondent-Intervenor, 201 F.3d 1186 (Fed. Cir. 1999).“Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: 84 The definition of the term `fishway' contained in 18 C.F.R. 4.30(b)(9)(iii), as in effect on the date of enactment of this Act [Oct.”
Rivers v. Comm'n, 201 F.3d 1186 (9th Cir. 2000).“2, 1991) (previously codified at 18 C.F.R. § 4.30 (b)(9)(iii) (1992)). Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: The definition of the term ‘fishway’ contained in 18 C.”
Am. Rivers v. Fed. Energy Regulatory Comm'n, 187 F.3d 1007 (9th Cir. 1999).“2, 1991) (previously codified at 18 C.F.R. § 4.30 (b)(9)(iii) (1992)). Congress promptly rejected and overturned the amended regulatory definition as still too narrow, providing: ' The definition of the term “fishway” contained in 18 C.”
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.