Skip to main content
C.F.R.Title 29Part 1—Procedures for Predetermination of Wage Rates

29 C.F.R. § 1.5 (2026)

Publication of general wage determinations and procedure for requesting project wage determinations

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1975–2014 6citing cases

(a) General wage determinations. A “general wage determination” contains, among other information, a list of wage and fringe benefit rates determined to be prevailing for various classifications of laborers or mechanics for specified type(s) of construction in a given area. The Department of Labor publishes “general wage determinations” under the Davis-Bacon Act on the DOL-approved website.

(b) Project wage determinations. (1) A “project wage determination” is specific to a particular project. An agency may request a “project wage determination” for an individual project under any of the following circumstances:

(i) The project involves work in more than one county and will employ workers who may work in more than one county;

(ii) There is no general wage determination in effect for the relevant area and type(s) of construction for an upcoming project, or

(iii) All or virtually all of the work on a contract will be performed by a classification that is not listed in the general wage determination that would otherwise apply, and contract award (or bid opening, in contracts entered into using sealed bidding procedures) has not yet taken place.

(2) To request a project wage determination, the agency must submit Standard Form (SF) 308, Request for Wage Determination and Response to Request, to the Department of Labor, either by mailing the form to U.S. Department of Labor, Wage and Hour Division, Branch of Construction Wage Determinations, Washington, DC 20210, or by submitting the form through other means directed by the Administrator.

(3) In completing Form SF-308, the agency must include the following information:

(i) A sufficiently detailed description of the work to indicate the type(s) of construction involved, as well as any additional description or separate attachment, if necessary, for identification of the type(s) of work to be performed. If the project involves multiple types of construction, the requesting agency must attach information indicating the expected cost breakdown by type of construction.

(ii) The location (city, county, state, zip code) or locations in which the proposed project is located.

(iii) The classifications needed for the project. The agency must identify only those classifications that will be needed in the performance of the work. Inserting a note such as “entire schedule” or “all applicable classifications” is not sufficient. Additional classifications needed that are not on the form may be typed in the blank spaces or on a separate list and attached to the form.

(iv) Any other information requested in Form SF-308.

(4) A request for a project wage determination must be accompanied by any pertinent wage information that may be available. When the requesting agency is a State highway department under the Federal-Aid Highway Acts as codified in 23 U.S.C. 113, such agency must also include its recommendations as to the wages which are prevailing for each classification of laborers and mechanics on similar construction in the area.

(5) The time required for processing requests for project wage determinations varies according to the facts and circumstances in each case. An agency should anticipate that such processing by the Department of Labor will take at least 30 days.

[88 FR 57724, Aug. 23, 2023]
The 6 cases that cite 29 C.F.R. § 1.5 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 1.5 3×cited by 30 cases
Where it cites § 1.5
“29 C.F.R. § 1.5 (b) (1979) provides: Whenever the wage patterns in a particular area for a particular type of construction are well settled and whenever it may be reasonably anticipated that there will be a large volume of procurement in that area for such a type of…”
2
GREENUniversities Rsch. Assn., Inc. v. Coutu, 450 U.S. 754 (1981).
cites § 1.5 1×cited by 388 cases
Where it cites § 1.5
“See 29 CFR §§ 1.5 , 1.6 (1980); Thieblot, at 31-34.”
The case’s holding
The Davis-Bacon Act does not create a private right of action because such litigation would disrupt the balance of interests between contractors and employees.
Later courts cite it for
“conversely, it has noted that there 'would be far less reason to infer a private remedy in favor of individual persons' where congress, rather than drafting the legislation 'with an unmistakable focus on the benefited class,' instead has framed the statute simply as a general prohibition or a command to a federal agency.” · 16 citing courts
3
GREENFasse v. Lower Heating & Air Conditioning, Inc., 736 P.2d 930 (Kan. 1987).
cites § 1.5 2×cited by 45 cases
Where it cites § 1.5
“The first type of determination is made when a federal agency awards a contract and requests the Secretary to determine the prevailing wage.”
The case’s holding
A third party may enforce a contract if the agreement was made for their benefit as its object and they were the intended beneficiary.
Later courts cite it for
“the intention of the parties and the meaning of the contract are to be determined from the instrument itself where the terms are plain and unambiguous.” · 2 citing courts
4
GREENUnited States ex rel. Krol v. Arch Ins., 46 F. Supp. 3d 347 (S.D.N.Y. 2014).
cites § 1.5 1×cited by 6 cases
Where it cites § 1.5
“29 C.F.R. §§ 1.5 , 1.6. Disputes between the contracting agency and contractors “concerning payment of prevailing wage rates, overtime pay, or proper classification” are resolved, in the first instance, by the Administrator of the Wage and Hour Division of the DOL’s Employment…”
cites § 1.5 2×cited by 7 cases
Where it cites § 1.5
“29 C.F. R. § 1.5 (1974). Alternately, in a geographical area in which wage scales are well settled and numerous federal contracts are awarded annually, the Secretary has granted himself discretion to publish general wage rate determinations for an area.”
6
GREENVirginia ex rel. Comm'r v. Marshall, 599 F.2d 588 (4th Cir. 1979).
cites § 1.5 1×cited by 4 cases
Where it cites § 1.5
“” See 29 C.F.R. § 1.5 (a). On October 11,1977, the Wage and Hour Division of the Department of Labor issued a wage determination which was effective for 120 days under 29 C.”
Later courts cite it for
“due regard' does not mean 'deference” · 2 citing courts

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197519942014

One bar per year. Tallest: 1 case in 1975. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
4th Cir.15th Cir.1N.D. Ga.1Kan.1S.D.N.Y.1SCOTUS1
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.