Skip to main content
C.F.R.Title 40Chapter I—Environmental Protection AgencySubchapter D—Water ProgramsPart 122—Epa Administered Permit Programs: The National Pollutant Discharge Elimination SystemSubpart D—Transfer, Modification, Revocation and Reissuance, and Termination of Permits

40 C.F.R. § 122.62 (2026)

Modification or revocation and reissuance of permits (applicable to State programs, see § 123.25)

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1984–2024 22citing cases
At a glance

Courts have cited this section in 22 opinions since 1984, 2 of them in the last five years. The most litigated part is subsection (a) (1 case).

When the Director receives any information (for example, inspects the facility, receives information submitted by the permittee as required in the permit (see § 122.41), receives a request for modification or revocation and reissuance under § 124.5, or conducts a review of the permit file) he or she may determine whether or not one or more of the causes listed in paragraphs (a) and (b) of this section for modification or revocation and reissuance or both exist. If cause exists, the Director may modify or revoke and reissue the permit accordingly, subject to the limitations of § 124.5(c), and may request an updated application if necessary. When a permit is modified, only the conditions subject to modification are reopened. If a permit is revoked and reissued, the entire permit is reopened and subject to revision and the permit is reissued for a new term. See § 124.5(c)(2). If cause does not exist under this section or § 122.63, the Director shall not modify or revoke and reissue the permit. If a permit modification satisfies the criteria in § 122.63 for “minor modifications” the permit may be modified without a draft permit or public review. Otherwise, a draft permit must be prepared and other procedures in part 124 (or procedures of an approved State program) followed.

(a) Causes for modification. The following are causes for modification but not revocation and reissuance of permits except when the permittee requests or agrees.

(1) Alterations. There are material and substantial alterations or additions to the permitted facility or activity (including a change or changes in the permittee's sludge use or disposal practice) which occurred after permit issuance which justify the application of permit conditions that are different or absent in the existing permit.

Note:

Certain reconstruction activities may cause the new source provisions of § 122.29 to be applicable.

(2) Information. The Director has received new information. Permits may be modified during their terms for this cause only if the information was not available at the time of permit issuance (other than revised regulations, guidance, or test methods) and would have justified the application of different permit conditions at the time of issuance. For NPDES general permits (§ 122.28) this cause includes any information indicating that cumulative effects on the environment are unacceptable. For new source or new discharger NPDES permits §§ 122.21, 122.29), this cause shall include any significant information derived from effluent testing required under § 122.21(k)(5)(vi) or § 122.21(h)(4)(iii) after issuance of the permit.

(3) New regulations. The standards or regulations on which the permit was based have been changed by promulgation of amended standards or regulations or by judicial decision after the permit was issued. Permits may be modified during their terms for this cause only as follows:

(i) For promulgation of amended standards or regulations, when:

(A) The permit condition requested to be modified was based on a promulgated effluent limitation guideline, EPA approved or promulgated water quality standards, or the Secondary Treatment Regulations under part 133; and

(B) EPA has revised, withdrawn, or modified that portion of the regulation or effluent limitation guideline on which the permit condition was based, or has approved a State action with regard to a water quality standard on which the permit condition was based; and

(C) A permittee requests modification in accordance with § 124.5 within ninety (90) days after Federal Register notice of the action on which the request is based.

(ii) For judicial decisions, a court of competent jurisdiction has remanded and stayed EPA promulgated regulations or effluent limitation guidelines, if the remand and stay concern that portion of the regulations or guidelines on which the permit condition was based and a request is filed by the permittee in accordance with § 124.5 within ninety (90) days of judicial remand.

(iii) For changes based upon modified State certifications of NPDES permits, see § 121.10 of this chapter.

(4) Compliance schedules. The Director determines good cause exists for modification of a compliance schedule, such as an act of God, strike, flood, or materials shortage or other events over which the permittee has little or no control and for which there is no reasonably available remedy. However, in no case may an NPDES compliance schedule be modified to extend beyond an applicable CWA statutory deadline. See also § 122.63(c) (minor modifications) and paragraph (a)(14) of this section (NPDES innovative technology).

(5) When the permittee has filed a request for a variance under CWA section 301(c), 301(g), 301(h), 301(i), 301(k), or 316(a) or for “fundamentally different factors” within the time specified in § 122.21 or § 125.27(a).

(6) 307(a) toxics. When required to incorporate an applicable 307(a) toxic effluent standard or prohibition (see § 122.44(b)).

(7) Reopener. When required by the “reopener” conditions in a permit, which are established in the permit under § 122.44(b) (for CWA toxic effluent limitations and Standards for sewage sludge use or disposal, see also § 122.44(c)) or 40 CFR 403.18(e) (Pretreatment program).

(8)(i) Net limits. Upon request of a permittee who qualifies for effluent limitations on a net basis under § 122.45(g).

(ii) When a discharger is no longer eligible for net limitations, as provided in § 122.45(g)(1)(ii).

(9) Pretreatment. As necessary under 40 CFR 403.8(e) (compliance schedule for development of pretreatment program).

(10) Failure to notify. Upon failure of an approved State to notify, as required by section 402(b)(3), another State whose waters may be affected by a discharge from the approved State.

(11) Non-limited pollutants. When the level of discharge of any pollutant which is not limited in the permit exceeds the level which can be achieved by the technology-based treatment requirements appropriate to the permittee under § 125.3(c).

(12) Notification levels. To establish a “notification level” as provided in § 122.44(f).

(13) Compliance schedules. To modify a schedule of compliance to reflect the time lost during construction of an innovative or alternative facility, in the case of a POTW which has received a grant under section 202(a)(3) of CWA for 100% of the costs to modify or replace facilities constructed with a grant for innovative and alternative wastewater technology under section 202(a)(2). In no case shall the compliance schedule be modified to extend beyond an applicable CWA statutory deadline for compliance.

(14) For a small MS4, to include an effluent limitation requiring implementation of a minimum control measure or measures as specified in § 122.34(b) when:

(i) The permit does not include such measure(s) based upon the determination that another entity was responsible for implementation of the requirement(s); and

(ii) The other entity fails to implement measure(s) that satisfy the requirement(s).

(15) To correct technical mistakes, such as errors in calculation, or mistaken interpretations of law made in determining permit conditions.

(16) When the discharger has installed the treatment technology considered by the permit writer in setting effluent limitations imposed under section 402(a)(1) of the CWA and has properly operated and maintained the facilities but nevertheless has been unable to achieve those effluent limitations. In this case, the limitations in the modified permit may reflect the level of pollutant control actually achieved (but shall not be less stringent than required by a subsequently promulgated effluent limitations guideline).

(17) Nutrient Management Plans. The incorporation of the terms of a CAFO's nutrient management plan into the terms and conditions of a general permit when a CAFO obtains coverage under a general permit in accordance with §§ 122.23(h) and 122.28 is not a cause for modification pursuant to the requirements of this section.

(18) Land application plans. When required by a permit condition to incorporate a land application plan for beneficial reuse of sewage sludge, to revise an existing land application plan, or to add a land application plan.

(b) Causes for modification or revocation and reissuance. The following are causes to modify or, alternatively, revoke and reissue a permit:

(1) Cause exists for termination under § 122.64, and the Director determines that modification or revocation and reissuance is appropriate.

(2) The Director has received notification (as required in the permit, see § 122.41(l)(3)) of a proposed transfer of the permit. A permit also may be modified to reflect a transfer after the effective date of an automatic transfer (§ 122.61(b)) but will not be revoked and reissued after the effective date of the transfer except upon the request of the new permittee.

[48 FR 14153, Apr. 1, 1983, as amended at 49 FR 25981, June 25, 1984; 49 FR 37009, Sept. 29, 1984; 49 FR 38050, Sept. 26, 1984; 50 FR 4514, Jan. 31, 1985; 51 FR 20431, June 4, 1986; 51 FR 26993, July 28, 1986; 54 FR 256, 258, Jan. 4, 1989; 54 FR 18784, May 2, 1989; 60 FR 33931, June 29, 1995; 64 FR 68847, Dec. 8, 1999; 65 FR 30909, May 15, 2000; 70 FR 60191, Oct. 14, 2005; 73 FR 70485, Nov. 20, 2008; 88 FR 66666, Sept. 27, 2023]
The 20 cases that cite 40 C.F.R. § 122.62 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
cites § 122.62 4×cited by 30 cases
Where it cites § 122.62
“”), with 40 C.F.R. § 122.62 (d)(2)(iii)(D) (The initial application called for “[a] proposed monitoring program for representative data collection.”
The case’s holding
A permitting authority is not required to impose specific numeric effluent limitations to satisfy the maximum extent practicable standard for municipal stormwater permits.
Later courts cite it for
“it is also difficult to discern the amount of pollutant that any one discharger contributes to a waterbody because municipalities have so many outfalls, or discharge points, leading into the waters.” · 4 citing courts
cites § 122.62 2×cited by 31 cases
Where it cites § 122.62
“See 40 C.F.R. §§ 122.62 (a)(2), 124.5. The District represented that it would file such a request.”
The case’s holding
The EPA may not indefinitely delay issuing a Clean Water Act NPDES permit until better science is developed, and numerical effluent limits within a reasonable zone supported by the record are permissible.
Later courts cite it for
“raise all reasonably ascertainable issues and submit all reasonably available arguments supporting their position by the close of the public comment period ....” · 2 citing courts
cites § 122.62 4×subsections: (a)(15)cited by 7 cases
Where it cites § 122.62
“The causes set forth in 40 C.F.R. § 122.62 (a), are explicitly incorporated, into North Dakota's regulations and, as relevant to this case, define cause for a modification to include new information or to correct technical mistakes: "(a) Causes for modification.”
4
GREENSierra Club v. U.S. Army Corps of Engineers, 909 F.3d 635 (4th Cir. 2018).
cites § 122.62 1×cited by 30 cases
Where it cites § 122.62
“First, the district court in Smithfield found that the state regulator's subsequent orders did not change the terms of the permit because they did not follow the "specific, mandatory procedures for modification" of the permit laid out in 40 C.F.R. § 122.62 . United States v.…”
The case’s holding
A federal agency lacks authority to substitute its own conditions for state-imposed Clean Water Act certification requirements and a state cannot waive such conditions without notice and comment.
Later courts cite it for
“if the statute is ambiguous, courts then 'move to chevron's second step and defer to the agency's interpretation so long as it is based on a permissible construction of the statute.” · 3 citing courts
5
GREENUnited States v. CPS Chem. Co., 779 F. Supp. 437 (E.D. Ark. 1991).
cites § 122.62 3×cited by 13 cases
Where it cites § 122.62
“NPDES permits can be modified only for the reasons specified in 40 C.F.R. § 122.62 (a), which include, among other things, substantial alterations or additions to the permitted activity or facility that occur after permit issuance and justify conditions different from or absent…”
Later courts cite it for
“for enforcement purposes, a permittee's discharge monitoring reports constitute admissions regarding the levels of effluents that the permittee has discharged.” · 3 citing courts
6
GREENUnited States v. Ohio Edison Co., 725 F. Supp. 928 (N.D. Ohio 1989).
cites § 122.62 3×subsections: (a)(5)cited by 9 cases
Where it cites § 122.62
“Plaintiff argues that the “suspension” of the cooling tower compliance schedule relied upon by defendant is void since Ohio EPA “lacked any authority to suspend or otherwise unilaterally modify the requirements of the NPDES permit at issue.”
7
YELLOWSierra Club v. Union Oil Co. of California, 813 F.2d 1480 (9th Cir. 1987).
cites § 122.62 1×cited by 63 cases
Vacated: 2 citing opinions add another limit ("vacated (caution)").
Where it cites § 122.62
“C. § 1342 (d). Review of the Administrator’s actions may be had in the appropriate circuit court of appeals.”
The case’s holding
Self-monitoring reports constitute conclusive evidence of permit exceedances because the regulatory program fundamentally relies on self-monitoring.
Later courts cite it for
“the npdes program fundamentally relies on self-monitoring.” · 4 citing courts
8
GREENCongaree Riverkeeper, Inc. v. Carolina Water Serv., Inc., 248 F. Supp. 3d 733 (D.S.C. 2017).
cites § 122.62 1×cited by 7 cases
Where it cites § 122.62
“See 40 C.F.R. §§ 122.62 , 124.5-124.12; S.C. Code Regs.”
Later courts cite it for
“is a strict liability statute.” · 1 citing court
9
GREENOhio Valley Env't Coalition, Inc. v. Apogee Coal Co., 555 F. Supp. 2d 640 (S.D. W. Va. 2008).
cites § 122.62 3×cited by 3 cases
Where it cites § 122.62
“*646 Federal and state regulations provide that for a major modification to be effective, a draft permit must be issued and the public must be advised of that draft permit.”
10
GREENCulbertson v. Coats Am., Inc., 913 F. Supp. 1572 (N.D. Ga. 1995).
cites § 122.62 1×cited by 15 cases
Where it cites § 122.62
“The procedures which EPA must follow in modifying an NPDES permit are found in 40 C.F.R. § 122.62 . States are required to adopt equivalent procedures for permit modification.”
11
GREENUnited States v. Smithfield Foods, Inc., 965 F. Supp. 769 (E.D. Va. 1997).
cites § 122.62 1×cited by 14 cases
Where it cites § 122.62
“With regard to the Board’s Special Orders and letters dated after the issuance of the 1992 Permit, there is no evidence in the record that they changed the terms of the 1992 Permit or defendants’ obligations under the Permit.”
Later courts cite it for
“because smithfield did not follow the procedures required for the modification of a permit, and none of the board's special orders and letters were issued in accordance with the permit modification procedures, smithfield cannot support its argument that the special orders or letters issued by the board after the 1992 permit modify the terms of the permit . . . .” · 2 citing courts
12
GREENArkansas Wildlife Fed'n v. Bekaert Corp., 791 F. Supp. 769 (W.D. Ark. 1992).
cites § 122.62 1×cited by 13 cases
Summary
No passage or summary on file for this case yet.
cites § 122.62 16×cited by 1 case
Where it cites § 122.62
“12 EPA regulations appearing at 40 C.F.R. § 122.62 list in greater detail the permissible grounds for modification “for cause”.”
Later courts cite it for
“forever the right to do so, even though that action might eventually result in the imposition of severe civil or criminal penalties.” · 2 citing courts
14
GREENChevron U.S.A., Inc. v. Hammond, 726 F.2d 483 (9th Cir. 1984).
cites § 122.62 1×cited by 65 cases
The case’s holding
State regulations are not preempted by federal law when the state law restricts an exception to a broad federal prohibition and serves consistent environmental goals.
Later courts cite it for
“the above authorities demonstrate a congressional intent that there be joint federal/state regulation of ocean waters within three miles of shore.” · 5 citing courts
cites § 122.62 1×cited by 8 cases
The case’s holding
A state cease and desist order extending a compliance deadline does not modify a permit or bar a citizen suit under the Clean Water Act.
Later courts cite it for
“duplicative of an 'administrative penalty action.” · 2 citing courts
16
GREENEcological Rights Found. v. Pac. Lumber Co., 61 F. Supp. 2d 1042 (N.D. Cal. 1999).
cites § 122.62 1×cited by 2 cases
Where it cites § 122.62
“The SWRCB is also permitted to modify, revoke, reissue or terminate NPDES general permits under several enumerated conditions and as authorized by 40 C.F.R. sections 122.62 et seq. The 1992 Permit expired on November 19, 1996.”
17
GREENMiccosukee Tribe of Indians of Florida v. United States, 706 F. Supp. 2d 1296 (S.D. Fla. 2010).
cites § 122.62 1×subsections: (a)cited by 1 case
Where it cites § 122.62
“See 40 C.F.R. 122.62(a) (noting that, “if cause exists,” NPDES permits can be “modif[ied] or revoke[d] and reissuefd]” and citing, inter alia, availability of “new information .”
cites § 122.62 2×cited by 3 cases
Where it cites § 122.62
“We have no doubt that in considering applications for modification of a BPJ permit under this section EPA will be sensitive to Congress’s very serious concerns for equal treatment of point sources (particularly of course those in competition with each other), concerns reflected…”
Later courts cite it for
“does not empower the agency to regulate point sources themselves; rather, epa's jurisdiction under the operative statute is limited to regulating the discharge of pollutants.” · 4 citing courts
19
NO FLAGTelford Borough Auth. v. United States Env't Prot. Agency, No. 2:12-cv-06548 (E.D. Pa. Feb. 4, 2021).
cites § 122.62 2×
Where it cites § 122.62
“at 6-7 (citing 40 C.F.R. §§ 122.62 (a)(2), 130.10(c)(7)(iv) (emphasis in original))).”
20
GREENWagner v. Scheirer, 712 F. Supp. 3d 1211 (D. Minn. 2024).
cites § 122.62 1×cited by 1 case
Where it cites § 122.62
“” 40 C.F.R. § 122.62 (emphasis added). The MPCA and its agents have the type of discretion described in Austell, where the Eighth Circuit determined that the plaintiffs had failed to show they had a clearly established property interest in renewal of their license.”

Show all 22 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198420042024

One bar per year. Tallest: 2 cases in 1988. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
9th Cir.31st Cir.2E.D. Ark.1W.D. Ark.14th Cir.15th Cir.1D.C. Cir.1N.D. Cal.1

The 8 courts with the most citing cases, of 19 courts in all.

By subsection
(a)1 case
Miccosukee Tribe of Indians of Florida v. United States, 706 F. Supp. 2d 1296 (S.D. Fla. 2010).“See 40 C.F.R. 122.62(a) (noting that, “if cause exists,” NPDES permits can be “modif[ied] or revoke[d] and reissuefd]” and citing, inter alia, availability of “new information .”
(a)(5)1 case
United States v. Ohio Edison Co., 725 F. Supp. 928 (N.D. Ohio 1989).“Plaintiff argues that the “suspension” of the cooling tower compliance schedule relied upon by defendant is void since Ohio EPA “lacked any authority to suspend or otherwise unilaterally modify the requirements of the NPDES permit at issue.”
(a)(15)1 case
People to Save the Sheyenne River, Inc. v. North Dakota Dep't of Health, 2008 ND 34, 744 N.W.2d 748.“The causes set forth in 40 C.F.R. § 122.62 (a), are explicitly incorporated, into North Dakota's regulations and, as relevant to this case, define cause for a modification to include new information or to correct technical mistakes: "(a) Causes for modification.”

Show all 22 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.