C.F.R. homeSearch C.F.R.
C.F.R.Title 48Chapter 1—Federal Acquisition RegulationSubchapter E—General Contracting RequirementsPart 31—Contract Cost Principles and ProceduresSubpart 31.1—Applicability

48 C.F.R. § 31.105 (2026)

31.105 Construction and architect-engineer contracts.

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 1988–2024 7citing cases
At a glance

Courts have cited this section in 7 opinions since 1988, 1 of them in the last five years. The most litigated part is subsection (d)(2)(i)(A) (1 case).

(a) This category includes all contracts and contract modifications negotiated on the basis of cost with organizations other than educational institutions (see 31.104), State and local governments (see 31.107), and nonprofit organizations except those exempted under OMB Uniform Guidance at 2 CFR part 200, appendix VIII (see 31.108) for construction management or construction, alteration or repair of buildings, bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to construction projects. It does not include contracts for vessels, aircraft, or other kinds of personal property.

(b) Except as otherwise provided in (d) below, the cost principles and procedures in subpart 31.2 shall be used in the pricing of contracts and contract modifications in this category if cost analysis is performed as required by 15.404-1(c).

(c) In addition, the contracting officer shall incorporate the cost principles and procedures in subpart 31.2 (as modified by (d) below) by reference in contracts in this category as the basis for—

(1) Determining reimbursable costs under cost-reimbursement contracts, including cost-reimbursement subcontracts thereunder;

(2) Negotiating indirect cost rates;

(3) Proposing, negotiating, or determining costs under terminated contracts;

(4) Price revision of fixed-price incentive contracts; and

(5) Pricing changes and other contract modifications.

(d) Except as otherwise provided in this paragraph (d), the allowability of costs for construction and architect-engineer contracts shall be determined in accordance with subpart 31.2.

(1) Because of widely varying factors such as the nature, size, duration, and location of the construction project, advance agreements as set forth in 31.109, for such items as home office overhead, partners' compensation, employment of consultants, and equipment usage costs, are particularly important in construction and architect-engineer contracts. When appropriate they serve to express the parties' understanding and avoid possible subsequent disputes or disallowances.

(2) Construction equipment, as used in this section, means equipment (including marine equipment) in sound workable condition, either owned or controlled by the contractor or the subcontractor at any tier, or obtained from a commercial rental source, and furnished for use under Government contracts.

(i) Allowable ownership and operating costs shall be determined as follows:

(A) Actual cost data shall be used when such data can be determined for both ownership and operating costs for each piece of equipment, or groups of similar serial or series equipment, from the contractor's accounting records. When such costs cannot be so determined, the contracting agency may specify the use of a particular schedule of predetermined rates or any part thereof to determine ownership and operating costs of construction equipment (see subdivisions (d)(2)(i)(B) and (C) of this section). However, costs otherwise unallowable under this part shall not become allowable through the use of any schedule (see 31.109(c)). For example, schedules need to be adjusted for Government contract costing purposes if they are based on replacement cost, include unallowable interest costs, or use improper cost of money rates or computations. Contracting officers should review the computations and factors included within the specified schedule and ensure that unallowable or unacceptably computed factors are not allowed in cost submissions.

(B) Predetermined schedules of construction equipment use rates (e.g., the Construction Equipment Ownership and Operating Expense Schedule published by the U.S. Army Corps of Engineers, industry sponsored construction equipment cost guides, or commercially published schedules of construction equipment use cost) provide average ownership and operating rates for construction equipment. The allowance for ownership costs should include the cost of depreciation and may include facilities capital cost of money. The allowance for operating costs may include costs for such items as fuel, filters, oil, and grease; servicing, repairs, and maintenance; and tire wear and repair. Costs of labor, mobilization, demobilization, overhead, and profit are generally not reflected in schedules, and separate consideration may be necessary.

(C) When a schedule of predetermined use rates for construction equipment is used to determine direct costs, all costs of equipment that are included in the cost allowances provided by the schedule shall be identified and eliminated from the contractor's other direct and indirect costs charged to the contract. If the contractor's accounting system provides for site or home office overhead allocations, all costs which are included in the equipment allowances may need to be included in any cost input base before computing the contractor's overhead rate. In periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed an amount for standby cost as determined by the schedule or contract provision.

(ii) Reasonable costs of renting construction equipment are allowable (but see paragraph (C) below).

(A) Costs, such as maintenance and minor or running repairs incident to operating such rented equipment, that are not included in the rental rate are allowable.

(B) Costs incident to major repair and overhaul of rental equipment are unallowable.

(C) The allowability of charges for construction equipment rented from any division, subsidiary, or organization under common control, will be determined in accordance with 31.205-36(b)(3).

(3) Costs incurred at the job site incident to performing the work, such as the cost of superintendence, timekeeping and clerical work, engineering, utility costs, supplies, material handling, restoration and cleanup, etc., are allowable as direct or indirect costs, provided the accounting practice used is in accordance with the contractor's established and consistently followed cost accounting practices for all work.

(4) Rental and any other costs, less any applicable credits incurred in acquiring the temporary use of land, structures, and facilities are allowable. Costs, less any applicable credits, incurred in constructing or fabricating structures and facilities of a temporary nature are allowable.

[48 FR 42301, Sept. 19, 1983, as amended at 50 FR 23607, June 4, 1985; 52 FR 19804, May 27, 1987; 62 FR 51271, Sept. 30, 1997; 81 FR 45853, July 14, 2016]
The 7 cases that cite 48 C.F.R. § 31.105 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENWhite Buffalo Constr., Inc. v. United States, 52 Fed. Cl. 1 (Fed. Cl. 2002).
cites § 31.105 3×cited by 14 cases
Where it cites § 31.105
“48 C.F.R. § 31.105 (d)(2)(i)(A)(2001). The FAR therefore requires that the CO use actual cost data for determining equipment rates when available.”
2
GREENMeridian Eng'g Co. v. United States, 130 Fed. Cl. 147 (Fed. Cl. 2016).
cites § 31.105 4×subsections: (d)(2)(i)(A) 2× (d)(2)(i)(C)cited by 3 cases
Where it cites § 31.105
“§§ 7101-7109 (2011) (Contract Disputes Act); 48 C.F.R. 31.105, 31.202, 31.203, 52.242-14, 52.”
3
GREENMorrison Knudsen Corp. v. Fireman's Fund Ins., 175 F.3d 1221 (10th Cir. 1999).
cites § 31.105 1×cited by 104 cases
Where it cites § 31.105
“35 million), unpaid contract work and post-termination equipment expenses and work ($1.”
The case’s holding
An appellant's failure to provide a necessary transcript to demonstrate prejudice from an instructional error requires affirmance of the judgment below.
Later courts cite it for
“our concern is to ensure that our review does not leave us with substantial doubt whether the instructions, considered as a whole, properly guided the jury in its deliberations.” · 7 citing courts
4
GREENDaewoo Eng'g & Constr. Co. v. United States, 73 Fed. Cl. 547 (Fed. Cl. 2006).
cites § 31.105 1×cited by 20 cases
Where it cites § 31.105
“, 48 C.F.R. § 31.105 (d)(2)®: (i) Allowable ownership and operating costs shall be determined as follows: (A) Actual cost data shall be used when such data can be determined for both ownership and operating costs for each piece of equipment, or groups of similar serial or series…”
The case’s holding
Liability for fraud requires a contractor to knowingly present a false claim with the specific intent of being paid for it.
Later courts cite it for
“carries no monetary penalties other than the forfeiture itself.” · 5 citing courts
5
GREENNorth Slope Technical Ltd. v. United States, 14 Cl. Ct. 242 (Ct. Cl. 1988).
cites § 31.105 1×cited by 10 cases
Where it cites § 31.105
“105(d)(2)(i)(A), 48 C.F.R. § 31.105 (d)(2)(i)(A) (1986). The provision makes clear that it controls subcontractors as well as general contractors, and that it applies to rented as well as to owned equipment.”
cites § 31.105 1×cited by 5 cases
Where it cites § 31.105
“” 48 C.F.R. § 31.105 . 14 . We review legal questions relating to contract interpretation de novo.”
7
NO FLAGSolpac Constr., Inc. dba Soltek Pac. Constr. Co., No. 63354 (A.S.B.C.A. Oct. 16, 2024).
cites § 31.105 1×cited by 0 cases
Where it cites § 31.105
“11 (SOF ¶ 4; 48 C.F.R. § 31.105 (d)(3) (2016) (emphasis added)) Therefore, contractors may charge job site overhead costs directly (percentage of markup) or indirectly (per diem/daily rate) as long as they are charged consistently.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198820062024

One bar per year. Tallest: 1 case in 1988. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.3Alaska1A.S.B.C.A.110th Cir.1Ct. Cl.1
By subsection
(d)(2)(i)(A)1 case
Meridian Eng'g Co. v. United States, 130 Fed. Cl. 147 (Fed. Cl. 2016).“§§ 7101-7109 (2011) (Contract Disputes Act); 48 C.F.R. 31.105, 31.202, 31.203, 52.242-14, 52.”
(d)(2)(i)(C)1 case
Meridian Eng'g Co. v. United States, 130 Fed. Cl. 147 (Fed. Cl. 2016).
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.

C.F.R. Home  |  Search C.F.R.  |  Search cases for this section  |  syfert.com