Skip to main content
C.F.R.Title 48Chapter 1—Federal Acquisition RegulationSubchapter B—Acquisition PlanningPart 9—Contractor QualificationsSubpart 9.5—Organizational and Consultant Conflicts of Interest

48 C.F.R. § 9.508 (2026)

9.508 Examples.

Edition and currency
eCFR text as of Sept. 29, 2026. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTeCFR text as of Sept. 29, 2026 cited 2000–2011 5citing cases
At a glance

Courts have cited this section in 5 opinions since 2000.

The examples in paragraphs (a) through (i) of this section illustrate situations in which questions concerning organizational conflicts of interest may arise. They are not all inclusive, but are intended to help the contracting officer apply the general rules in 9.505 to individual contract situations.

(a) Company A agrees to provide systems engineering and technical direction for the Navy on the powerplant for a group of submarines (i.e., turbines, drive shafts, propellers, etc.). Company A should not be allowed to supply any powerplant components. Company A can, however, supply components of the submarine unrelated to the powerplant (e.g., fire control, navigation, etc.). In this example, the system is the powerplant, not the submarine, and the ban on supplying components is limited to those for the system only.

(b) Company A is the systems engineering and technical direction contractor for system X. After some progress, but before completion, the system is canceled. Later, system Y is developed to achieve the same purposes as system X, but in a fundamentally different fashion. Company B is the systems engineering and technical direction contractor for system Y. Company A may supply system Y or its components.

(c) Company A develops new electronic equipment and, as a result of this development, prepares specifications. Company A may supply the equipment.

(d) XYZ Tool Company and PQR Machinery Company, representing the American Tool Institute, work under Government supervision and control to refine specifications or to clarify the requirements of a specific acquisition. These companies may supply the item.

(e) Before an acquisition for information technology is conducted, Company A is awarded a contract to prepare data system specifications and equipment performance criteria to be used as the basis for the equipment competition. Since the specifications are the basis for selection of commercial hardware, a potential conflict of interest exists. Company A should be excluded from the initial follow-on information technology hardware acquisition.

(f) Company A receives a contract to define the detailed performance characteristics an agency will require for purchasing rocket fuels. Company A has not developed the particular fuels. When the definition contract is awarded, it is clear to both parties that the agency will use the performance characteristics arrived at to choose competitively a contractor to develop or produce the fuels. Company A may not be awarded this follow-on contract.

(g) Company A receives a contract to prepare a detailed plan for scientific and technical training of an agency's personnel. It suggests a curriculum that the agency endorses and incorporates in its request for proposals to institutions to establish and conduct the training. Company A may not be awarded a contract to conduct the training.

(h) Company A is selected to study the use of lasers in communications. The agency intends to ask that firms doing research in the field make proprietary information available to Company A. The contract must require Company A to—

(1) Enter into agreements with these firms to protect any proprietary information they provide; and

(2) Refrain from using the information in supplying lasers to the Government or for any purpose other than that for which it was intended.

(i) An agency that regulates an industry wishes to develop a system for evaluating and processing license applications. Contractor X helps develop the system and process the applications. Contractor X should be prohibited from acting as a consultant to any of the applicants during its period of performance and for a reasonable period thereafter.

[48 FR 42142, Sept. 19, 1983. Redesignated at 55 FR 42687, Oct. 22, 1990; 61 FR 41469, Aug. 8, 1996; 84 FR 19846, May 6, 2019]
The 5 cases that cite 48 C.F.R. § 9.508 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENFiltration Dev. Co. v. United States, 60 Fed. Cl. 371 (Fed. Cl. 2004).
cites § 9.508 2×cited by 65 cases
Where it cites § 9.508
“48 C.F.R. § 9.508 (a). The FAR’s prohibition is clarified in the following illuminating example: “Company A agrees to provide systems engineering and technical direction for the Navy on the powerplant for a group of submarines____Company A should not be allowed to supply any…”
The case’s holding
An organizational conflict of interest exists when a contractor providing technical direction services also supplies major components of the system being evaluated.
Later courts cite it for
“potential access to source selection information” · 1 citing court
2
GREENVantage Assocs., Inc. v. United States, 59 Fed. Cl. 1 (Fed. Cl. 2003).
cites § 9.508 2×cited by 22 cases
Where it cites § 9.508
“48 C.F.R. § 9.508 (e) (2002). Defendant responds that Raytheon, as the manufacturer and designer of the entire PHALANX system, including radomes, is exempt from the OCI regulations at issue.”
Later courts cite it for
“the wide discretion afforded contracting officers extends to a broad range of procurement functions, including the determination of what constitutes an advantage over those proposals.” · 4 citing courts
3
GREENFiltration Dev. Co. v. United States, 63 Fed. Cl. 612 (Fed. Cl. 2005).
cites § 9.508 1×cited by 17 cases
Where it cites § 9.508
“” 48 C.F.R. § 9.508 (a). By awarding a contract to AFS, an affiliate of Westar Corporation, the Army failed to comply with this straightforward FAR provision.”
Later courts cite it for
“there is no justification for the government's position when clear, unambiguous regulations directly contradict that position.” · 5 citing courts
4
GREENNetstar-1 Gov't Consulting, Inc. v. United States, 98 Fed. Cl. 729 (Fed. Cl. 2011).
cites § 9.508 1×cited by 7 cases
Where it cites § 9.508
“” See also 48 C.F.R. § 9.508 (h) (illustrating the proper application of this provision).”
5
GREENDSD Labs., Inc. v. United States, 46 Fed. Cl. 467 (Fed. Cl. 2000).
cites § 9.508 1×cited by 11 cases
Where it cites § 9.508
“See 48 C.F.R. § 9.508 (g). The OCI rules are designed to prevent “the existence of conflicting roles that might bias a contractor’s judgment” and provide “unfair competitive advantage.”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
200020052011

One bar per year. Tallest: 1 case in 2000. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: eCFR text as of Sept. 29, 2026. Syfert holds no earlier or later version of this section.