Colo. Rev. Stat. § 38-22-105 (2024)

Property subject to lien - notice

Edition and currency
C.R.S. 2024: the 2025 and 2026 sessions are not included. The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTC.R.S. 2024: the 2025 and 2026 sessions are not included cited 1980–2025 13citing cases
At a glance

Courts have cited this section in 13 opinions since 1980, 1 of them in the last five years. The most litigated part is subsection (2) (8 cases).

(1) Any building, mill, manufactory, bridge, ditch, flume, aqueduct, reservoir, tunnel, fence, railroad, wagon road, tramway, and every structure or other improvement mentioned in this article, constructed, altered, added to, removed to, or repaired, either in whole or in part, upon or in any land with the knowledge of the owner or reputed owner of such land, or of any person having or claiming an interest therein, otherwise than under a bona fide prior recorded mortgage, deed of trust, or other encumbrance, or prior lien shall be held to have been erected, constructed, altered, removed, repaired, or done at the instance and request of such owner or person, including landlord or vendor, who by lease or contract has authorized such improvements, but so far only as to subject his interest to a lien therefor as provided in this section.

(2) Such interest so owned or claimed shall be subject to any lien given by the provisions of this article, unless such owner or person within five days after obtaining notice of the erection, construction, alteration, removal, addition, repair, or other improvement, gives notice that his or her interests shall not be subject to any lien for the same by serving a written or printed notice to that effect, personally, upon all persons performing labor or furnishing laborers, materials, machinery, or other fixtures therefor, or within five days after such owner or person has obtained notice of the erection, construction, alteration, removal, addition, repair, or other improvement, or notice of the intended erection, construction, alteration, removal, addition, repair, or other improvement gives such notice by posting and keeping posted a written or printed notice in some conspicuous place upon said land or upon the building or other improvements situate thereon.

(3) This section shall not apply to coowners of unincorporated canals, ditches, flumes, aqueducts, and reservoirs nor to the enforcement of article 23 of this title. The provisions of this section shall not be construed to apply to any owner or person claiming any interest in such property, the interest of whom is subject to a lien pursuant to the provisions of section 38-22- 101.

Source: L. 1899: p. 267, § 5. R.S. 08: § 4029. C.L. § 6446. CSA: C. 101, § 19. CRS 53: § 86-3-5. C.R.S. 1963: § 86-3-5. L. 65: p. 851, § 3. L. 2000: (2) amended, p. 207, § 5, effective August 2.

The 13 cases that cite Colo. Rev. Stat. § 38-22-105 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENDCB Constr. Co. v. Cent. City Dev. Co., 965 P.2d 115 (Colo. 1998).
cites § 38-22-105 12×subsections: (2) 8×cited by 271 cases
Where it cites § 38-22-105
“[2] Although section 38-22-105 allows owners to protect their interest in land from liens by posting proper notice, such notice does not automatically foreclose all liability.”
The case’s holding
A contractor cannot recover under a theory of unjust enrichment for tenant improvements unless the landlord engaged in some type of improper, deceitful, or misleading conduct.
Later courts cite it for
“some type of improper, deceitful, or misleading conduct by the landlord” · 4 citing courts
cites § 38-22-105 26×subsections: (1) 6× (2) 6×cited by 14 cases
Where it cites § 38-22-105
“The trial court found that the premises were improved for continued use as a restaurant and tavern, the improvements were securely attached to the premises and removal would virtually destroy them, and the tenant and the lien claimants contemplated that the improvements would be…”
Later courts cite it for
“provides that under certain circumstances one who supplies materials or labor to be used to enhance the value of property shall have a lien upon the property to the extent of the goods and services provided.” · 2 citing courts
3
GREENSeracuse Lawler & Partners, Inc. v. Cooper Mountain, 654 P.2d 1328 (Colo. Ct. App. 1982).
cites § 38-22-105 12×subsections: (2) 2×cited by 10 cases
Where it cites § 38-22-105
“A mechanic’s lien may also attach to property pursuant to § 38-22-105, C.R.S. 1973, though the owner did not contract for the architectural services.”
Later courts cite it for
“an architect's preliminary work constitutes the commencement of an improvement or a structure” · 1 citing court
4
GREENChambliss/Jenkins Assocs.. v. Forster, 650 P.2d 1315 (Colo. Ct. App. 1982).
cites § 38-22-105 6×subsections: (1) 2×cited by 22 cases
Where it cites § 38-22-105
“CJA also contends that it is entitled to assert a mechanic’s lien pursuant to § 38-22-105, C.R.S. 1973. We disagree. That provision provides, in pertinent part: “(1) Any building .”
Later courts cite it for
“written documents containing ambiguities or unclear language must be construed in accordance with the intent of the parties, and relevant extraneous evidence may be considered to resolve the factual question of the parties' intent.” · 1 citing court
5
GREENFrank M. Hall & Co. v. Sw. Props. Venture, 747 P.2d 688 (Colo. Ct. App. 1987).
cites § 38-22-105 6×subsections: (2) 6×cited by 9 cases
Where it cites § 38-22-105
“The trial court found that the landlord had timely and properly posted the notice of nonliability as provided by § 38-22-105(2), C.R.S. (1982 Repl.Vol. 16A), and that its property was therefore not subject to the lien.”
Later courts cite it for
“(1) that she conferred a benefit on the defendant, (2) that the benefit was 'appreciated' by the defendant, and (3) that the benefit was accepted under such circumstances that it would be inequitable for the defendant to retain it without payment of its reasonable value.” · 2 citing courts
6
GREENFowler & Peth, Inc. v. Regan, 151 P.3d 1281 (Colo. 2007).
cites § 38-22-105 2×cited by 22 cases
Where it cites § 38-22-105
“This definition includes notice, filing, and time elements.”
Later courts cite it for
“should reject interpretations that cause parts of a statute to be superfluous, and should attempt to harmonize any potentially conflicting provisions.” · 3 citing courts
7
GREENRedco Constr. v. Profile Props., LLC, 2012 WY 24, 271 P.3d 408.
cites § 38-22-105 1×subsections: (2)cited by 47 cases
Where it cites § 38-22-105
“Code § 8444 (10-day notice); Colo.Rev.Stat. § 38-22-105(2) (5-day notice); Minn.”
The case’s holding
A mechanic's lien requires a showing of agency under the term specifically authorized, meaning the tenant acted under the landlord's control and for the landlord's benefit.
Later courts cite it for
“the language of the statute is not ambiguous, there is no room for further construction.” · 1 citing court
8
GREENUni-Build Corp. v. Colorado Seminary, 650 P.2d 1300 (Colo. Ct. App. 1982).
cites § 38-22-105 7×subsections: (2) 7×cited by 2 cases
Where it cites § 38-22-105
“The same day, owner posted the property in two conspicuous places with a notice of its non-liability pursuant to § 38-22-105(2), C.R.S. 1973. However, the evidence revealed that these notices were not kept up throughout the duration of the work.”
9
GREENDCB Constr. Co. v. Cent. City Dev. Co., 940 P.2d 958 (Colo. Ct. App. 1997).
cites § 38-22-105 2×subsections: (2) 2×cited by 8 cases
Later courts cite it for
“given the undisputed factual circumstances summarized above, a claim for unjust enrichment will not lie, as a matter of law.” · 1 citing court
10
GREENInteriors Contracting Inc. v. Navalco, 648 P.2d 1382 (Utah 1982).
cites § 38-22-105 1×cited by 23 cases
Where it cites § 38-22-105
“Code §§ 3094, 3129 (West 1924); Colo.Rev.Stat. § 38-22-105 (1973); Or.Rev.”
The case’s holding
A lease may create an implied agency between a lessor and lessee for mechanic's lien purposes based on the lease terms and the whole circumstances of the transaction.
Later courts cite it for
“the facts of the transaction must be explored .... thhe courts have often gone beyond the agreement and into the whole cireumstances ... in order to find the answer.” · 2 citing courts
11
NO FLAGBobby Hill v. JP Antlers, No. 24CA1132 (Colo. Ct. App. Mar. 27, 2025).
cites § 38-22-105 38×subsections: (1) 36×unpublished
Where it cites § 38-22-105
“The project eventually fell through before work at the property commenced, and the nonprofit failed to pay for the plans, prompting the architecture firm to assert a mechanic’s lien under section 38-22-105. Chambliss/Jenkins, 650 P.”
12
NEUTRALA-1 Plumbing & Heating Co. v. Thirteenth Street Corp., 616 P.2d 141 (Colo. Ct. App. 1980).
cites § 38-22-105 17×subsections: (2) 2×cited by 1 case
Where it cites § 38-22-105
“Lien Validity Liens attach to property under § 38-22-105, C.R.S. 1973, when, within five days after he discovers the alteration or improvements on the property, the owner of the property in question fails to give notice in writing that his interest in the property shall not be…”
13
NO FLAGAutocon Indus., Inc. v. W. States Constr. Co., 728 P.2d 374 (Colo. Ct. App. 1986).
cites § 38-22-105 2×
Where it cites § 38-22-105
“Because we conclude that Autocon was a third-party beneficiary under the payment bond, we need not discuss whether Autocon was also a materialman pursuant to § 38-22-105, C.R.S. (1982 Repl.Yol. 16A).”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198020022025

One bar per year. Tallest: 5 cases in 1982. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Colo. Ct. App.8Colo.3Utah1Wyo.1
By subsection
(1)3 cases
Thirteenth Street Corp. v. A-1 Plumbing & Heating Co., 640 P.2d 1130 (Colo. 1982).“The trial court found that the premises were improved for continued use as a restaurant and tavern, the improvements were securely attached to the premises and removal would virtually destroy them, and the tenant and the lien claimants contemplated that the improvements would be…”
Chambliss/Jenkins Assocs.. v. Forster, 650 P.2d 1315 (Colo. Ct. App. 1982).“CJA also contends that it is entitled to assert a mechanic’s lien pursuant to § 38-22-105, C.R.S. 1973. We disagree. That provision provides, in pertinent part: “(1) Any building .”
Bobby Hill v. JP Antlers, No. 24CA1132 (Colo. Ct. App. Mar. 27, 2025).“The project eventually fell through before work at the property commenced, and the nonprofit failed to pay for the plans, prompting the architecture firm to assert a mechanic’s lien under section 38-22-105. Chambliss/Jenkins, 650 P.”
(2)8 cases
DCB Constr. Co. v. Cent. City Dev. Co., 965 P.2d 115 (Colo. 1998).“[2] Although section 38-22-105 allows owners to protect their interest in land from liens by posting proper notice, such notice does not automatically foreclose all liability.”
Frank M. Hall & Co. v. Sw. Props. Venture, 747 P.2d 688 (Colo. Ct. App. 1987).“The trial court found that the landlord had timely and properly posted the notice of nonliability as provided by § 38-22-105(2), C.R.S. (1982 Repl.Vol. 16A), and that its property was therefore not subject to the lien.”
Redco Constr. v. Profile Props., LLC, 2012 WY 24, 271 P.3d 408.“Code § 8444 (10-day notice); Colo.Rev.Stat. § 38-22-105(2) (5-day notice); Minn.”
Uni-Build Corp. v. Colorado Seminary, 650 P.2d 1300 (Colo. Ct. App. 1982).“The same day, owner posted the property in two conspicuous places with a notice of its non-liability pursuant to § 38-22-105(2), C.R.S. 1973. However, the evidence revealed that these notices were not kept up throughout the duration of the work.”
Showing the top 5 of 8. More in the list view →
Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: C.R.S. 2024: the 2025 and 2026 sessions are not included. Syfert holds no earlier or later version of this section.