Colo. Rev. Stat. § 40-5-101 (2024)
New construction - extension - compliance with local zoning rules
Edition and currency
Other sources
Courts have cited this section in 19 opinions since 1976, 3 of them in the last five years. The most litigated part is subsection (1) (6 cases).
(1) (a) A public utility shall not begin the construction of a new facility, plant, or system or the extension of its facility, plant, or system without first obtaining from the commission a certificate that the present or future public convenience and necessity require, or will require, the construction or extension. For purposes of this subsection (1), the present or future public convenience and necessity does not include the consideration of land use rights or siting issues related to the location or alignment of the proposed electric transmission lines or associated facilities, which issues are under the jurisdiction of a local government's land use regulation. Sections 40-5-101 to 40-5-104 do not require a corporation to secure a certificate for the following:
(I) An extension within any city and county, city, or town within which it has already lawfully commenced operations;
(II) An extension into territory, either within or outside of a city and county, city, or town, contiguous to its facility, line, plant, or system and not already served by a public utility providing the same commodity or service; or
(III) An extension within or to territory already served by the corporation, as is necessary in the ordinary course of its business.
(b) If a public utility, in constructing or extending its line, plant, or system, interferes, or is about to interfere, with the operation of the line, plant, or system of any other public utility already constructed, the commission, upon complaint of the public utility claiming to be injuriously affected, after hearing, may prohibit the construction or extension or prescribe just and reasonable terms and conditions for the location of the lines, plants, or systems affected.
(2) Whenever the commission, after a hearing upon its own motion or upon complaint, finds that there is or will be a duplication of service by public utilities in any area, the commission may issue a certificate of public convenience and necessity assigning specific territories to one or to each of said utilities or, by certificate of public convenience and necessity, otherwise define the conditions of rendering service and constructing extensions within those territories and may order the elimination of the duplication upon such terms as are just and reasonable, having due regard to due process of law and to all the rights of the respective parties and to public convenience and necessity.
(3) Except as otherwise provided in section 29-20-108, C.R.S., a public utility shall not construct or install a new facility, plant, or system within the territorial boundaries of a local government unless the construction or installation complies with the local government's zoning rules, resolutions, or ordinances. Nothing in this subsection (3) prohibits a local government from granting a variance from its zoning rules, resolutions, or ordinances for such uses of the property. Nothing in this subsection (3) grants the commission any additional authority to restrict a siting application. For purposes of this section, "local government" means a county, home rule or statutory city, town, territorial charter city, or city and county. Nothing in this subsection (3) restricts the right of a public utility or power authority to appeal to the public utilities commission a local government action under section 29-20-108, C.R.S.
(4) (a) A public utility is entitled to recover, through a separate rate adjustment clause, the costs that it prudently incurs in planning, developing, and completing the construction or expansion of transmission facilities for which the utility has been granted a certificate of public convenience and necessity, or for which the commission has determined that no certificate of public convenience and necessity is required. The transmission rate adjustment clause is subject to annual changes, which are effective on January 1 of each year. (b) To provide additional encouragement to utilities to pursue the construction and expansion of transmission facilities, the commission shall approve current recovery by the utility through the annual rate adjustment clause of the utility's weighted average cost of capital, including its most recently authorized rate of return on equity, on the total balance of construction work in progress related to such transmission facilities as of the end of the immediately preceding year. The rate adjustment clause shall be reduced to the extent that the prudently incurred costs being recovered through the adjustment clause have been included in the public utility's base rates as a result of the commission's final order in a rate case.
Source: L. 13: p. 481, § 35. L. 17: p. 418, § 1. C.L. § 2946. CSA: C. 137, § 36. CRS 53: § 115-5-1. L. 61: p. 628, § 2. C.R.S. 1963: § 115-5-1. L. 2005: (3) added, p. 1355, § 1, effective August 8. L. 2007: (4) added, p. 267, § 3, effective March 27. L. 2012: Entire section amended, (HB 12-1312), ch. 101, p. 339, § 2, effective April 12. Cross references: (1) For the acquisition of public utilities by cities and towns, see § 40-5-104.
(2) For the legislative declaration contained in the 2007 act enacting subsection (4), see section 1 of chapter 61, Session Laws of Colorado 2007. For the legislative declaration in the 2012 act amending this section, see section 1 of chapter 101, Session Laws of Colorado 2012.
40-5-101.5. Investor-owned utilities' service extension policies - commission review - rules. (1) Within one hundred eighty days after August 9, 2017, the commission shall open a nonadjudicatory proceeding to evaluate investor-owned utilities' current service extension policies for serving new load applications; except that gas-only, investor-owned utilities are not subject to the commission's nonadjudicatory proceeding. Based on the commission's evaluation, the commission shall issue a decision containing recommendations to investor-owned utilities for potential implementation.
(2) In the commission's nonadjudicatory proceeding, the commission shall consider, without limitation, the following information from investor-owned utilities:
(a) The utilities' general load extension procedures used by the utility and requesting customers, including:
(I) The use of construction agreements, revenue assurance agreements, assignment of estimated costs, predevelopment system investment protocols, and options for cost and schedule transparency; and
(II) Potential system automation benefits to enhance clarity of the requirements and process;
(b) Equitable allocation of costs associated with an extension of facilities and any other factors affecting the cost of an extension of facilities; and
(c) Variables that affect time lines for construction and implementation of an extension of facilities.
(3) Within ninety days after the conclusion of the nonadjudicatory proceeding, the commission may promulgate rules consistent with the findings of the nonadjudicatory proceeding.
Source: L. 2017: Entire section added, (SB 17-271), ch. 310, p. 1673, § 1, effective August 9.
- Where it cites § 40-5-101
- “, or the granting of a certificate of public convenience and necessity as required by C.R.S. § 40-5-101 et. seq. (Emphasis added.”
- Where it cites § 40-5-101
- “Sections 40-5-101 to 40-5-104 shall not be construed to require any corporation to secure such certificate for an extension within any city and county or city or town within which it has theretofore lawfully commenced operations, or for an extension into territory, either within…”
- Where it cites § 40-5-101
- “XXV; §§ 40-5-101, -102. These constitutional and statutory provisions strive to ensure that public utility service is substantially adequate across Colorado, while not disturbing home rule power any more than necessary to accommodate the state interest expressed in the…”
- Where it cites § 40-5-101
- “§ 23-3-201 (West 2003); Colo.Rev.Stat. Ann. § 40-5-101 (West 2004); 15 S.”
- Where it cites § 40-5-101
- “Section 40-5-101, C.R.S. 1973. Judicial review of action taken by the commission is narrowly confined to “determining] whether the commission has regularly pursued its authority, including a determination of whether the decision .”
- Where it cites § 40-5-101
- “1 Section 40-5-101(1) provides in pertinent part: Sections 40-5-101 to 40-5-104 shall not be construed to require any corporation to secure such certificate .”
- Where it cites § 40-5-101
- “C82-675 (May 4, 1982). PUC Rule 18 was modified to add changes on November 30, 1983.”
- Where it cites § 40-5-101
- “121, §§ 40-5-101 & 40-5-103, 1971 Colo.Sess.Laws 433, 433-35.”
- The case’s holding
- A trial court must weigh the probative value of proposed evidence against the danger of unfair prejudice by considering the nature of the case and other evidence admitted.
- Later courts cite it for
- “must consider the probative value of the proposed evidence ... in light of the nature of the case, the nature of the offered evidence, and the other evidence admitted during the trial.” · 2 citing courts
- Where it cites § 40-5-101
- “1, $ 40-5-101(8), 1971 Colo. Sess. Laws 483 ; § 18-5-101(7).”
- Where it cites § 40-5-101
- “any extension of its facility, plant, or system without first having obtained from the commission a certificate that the present or future public convenience and necessity require or will require such construction .”
- Later courts cite it for
- “after a utility has been assigned a specific territory, no other utility may provide service in that territory unless it is established that the certificated utility is unable or unwilling to provide adequate service.” · 1 citing court
- Where it cites § 40-5-101
- “The petition sought an order determining, as pertinent here, that (1) the Railroad's new route constituted a new facility, plant, or system, or the extension of its existing facility, plant, or system, thus requiring 6 a new certificate of public convenience and necessity under…”
- Summary
- No passage or summary on file for this case yet.
- Where it cites § 40-5-101
- “XXV; § 40-5-101 & - 102, 11 C.R.S. (1998); City of Greeley v.”
- Where it cites § 40-5-101
- “Section 40-5-101, 17 C.R.S. (1984), prohibits a public utility from constructing “a new facility, plant, or system .”
- Where it cites § 40-5-101
- “The applicable portion of § 40-5-101(1), C.R.S. (1984 Repl.Vol. 17), provides: “No public utility shall begin the construction of a new facility, plant, or system or of any extension of its facility, plant, or system without first having obtained from the commission a…”
- Later courts cite it for
- “the sole purpose for which the easement was sought was to supply electrical power to operate a coal mine owned by adolph coors company and that, therefore, the easement was not for a public use.” · 1 citing court
- Where it cites § 40-5-101
- “See § 40-5-101, C.R.S.1973. To this extent, plaintiff’s certificate is exclusive.”
- Where it cites § 40-5-101
- “¶11 The PUC approved the Rattlesnake Butte Project without requiring a CPCN, deeming it to be within the ordinary course of business pursuant to section 40-5-101, C.R.S. (2020) (specifying that a public utility need not secure a CPCN when an extension to territory already served…”
- Where it cites § 40-5-101
- “¶11 The PUC approved the Rattlesnake Butte Project without requiring a CPCN, deeming it to be within the ordinary course of business pursuant to section 40-5-101 , C.R.S. ( 2020 ) (specifying that a public utility need not secure a CPCN when an extension to territory already…”
- Where it cites § 40-5-101
- “This state policy is found in § 40-5-101, 17 C.R.S. (1984). The policy “was designed to prevent duplication of facilities and competition between utilities, and to authorize new utilities in a field only when existing ones are found to be inadequate.”
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 2 cases in 1976. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
(1)6 cases
(1)(a)1 case
(2)2 cases
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: C.R.S. 2024: the 2025 and 2026 sessions are not included. Syfert holds no earlier or later version of this section.