Conn. Gen. Stat.Title 22a — Environmental ProtectionChapter 444 — Coastal Management

Conn. Gen. Stat. § 22a-109 (2025)

Coastal site plans. Review

Edition and currency
laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026) cited 1984–2025 16citing cases
At a glance

Courts have cited this section in 16 opinions since 1984, 2 of them in the last five years.

(a) A coastal site plan shall be filed with the municipal zoning commission to aid in determining the conformity of a proposed building, use, structure or shoreline flood and erosion control structure, as defined in subsection (c) of this section, fully or partially within the coastal boundary, with the specific provisions of the zoning regulations of the municipality and the provisions of sections 22a-105 and 22a-106, and in the case of shoreline flood and erosion control structures, the provisions of sections 22a-359 to 22a-363, inclusive, and any regulations adopted thereunder. A coastal site plan required under this section may be modified or denied if it fails to comply with the requirements already set forth in the zoning regulations of the municipality and, in addition, the coastal site plan may be modified, conditioned or denied in accordance with the procedures and criteria listed in sections 22a-105 and 22a-106. A coastal site plan for a shoreline flood and erosion control structure may be modified, conditioned or denied if it fails to comply with the requirements, standards and criteria of sections 22a-359 to 22a-363, inclusive, and any regulations adopted thereunder. A coastal site plan for a shoreline flood and erosion structure shall be approved if the record demonstrates and the commission makes specific written findings that such structure is necessary and unavoidable for the protection of infrastructural facilities, cemetery or burial grounds, water-dependent uses fundamental to habitability or primary use of such property or inhabited structures or structure additions constructed as of January 1, 1995, that there is no feasible, less environmentally damaging alternative and that all reasonable mitigation measures and techniques are implemented to minimize adverse environmental impacts. Review of a coastal site plan under the requirements of this section shall supersede any review required by the municipality under subsection (g) of section 8-3 and shall be in addition to any applicable zoning regulations of any special district exercising zoning authority under special act. The provisions of this section shall not be construed to limit the authority of the Commissioner of Energy and Environmental Protection under sections 22a-359 to 22a-363, inclusive.

(b) The zoning commission may by regulation exempt any or all of the following uses from the coastal site plan review requirements of this chapter: (1) Minor additions to or modifications of existing buildings or detached accessory buildings, such as garages and utility sheds; (2) construction of new or modification of existing structures incidental to the enjoyment and maintenance of residential property including but not limited to walks, terraces, elevated decks, driveways, swimming pools, tennis courts, docks and detached accessory buildings; (3) construction of new or modification of existing on-premise structures including fences, walls, pedestrian walks and terraces, underground utility connections, essential electric, gas, telephone, water and sewer service lines, signs and such other minor structures as will not substantially alter the natural character of coastal resources or restrict access along the public beach; (4) construction of an individual single-family residential structure except when such structure is located on an island not connected to the mainland by an existing road bridge or causeway or except when such structure is in or within one hundred feet of the following coastal resource areas: Tidal wetlands, coastal bluffs and escarpments and beaches and dunes; (5) activities conducted for the specific purpose of conserving or preserving soil, vegetation, water, fish, shellfish, wildlife and other coastal land and water resources; (6) interior modifications to buildings; and (7) minor changes in use of a building, structure or property except those changes occurring on property adjacent to or abutting coastal waters. Gardening, grazing and the harvesting of crops shall be exempt from the requirements of this chapter. Notwithstanding the provisions of this subsection, shoreline flood and erosion control structures as defined in subsection (c) of this section shall not be exempt from the requirements of this chapter.

(c) For the purposes of this section, “shoreline flood and erosion control structure” means any structure the purpose or effect of which is to control flooding or erosion from tidal, coastal or navigable waters and includes breakwaters, bulkheads, groins, jetties, revetments, riprap, seawalls and the placement of concrete, rocks or other significant barriers to the flow of flood waters or the movement of sediments along the shoreline. The term shall not include: (1) Any addition, reconstruction, change or adjustment to any walled and roofed building which is necessary for such building to comply with the requirements of the Code of Federal Regulations, Title 44, Part 50, and any municipal regulation adopted thereunder, or (2) any activity, including, but not limited to, living shorelines projects, for which the primary purpose or effect is the restoration or enhancement of tidal wetlands, beaches, dunes or intertidal flats.

(d) A copy of each coastal site plan submitted for any shoreline flood and erosion control structure shall be referred to the Commissioner of Energy and Environmental Protection within fifteen days of its receipt by the zoning commission. The day of receipt shall be determined in accordance with subsection (c) of section 8-7d. The commissioner may comment on and make recommendations on such plans. Such comments and recommendations shall be submitted to the zoning commission within thirty-five days of the date of receipt of the coastal site plan by the commissioner and shall be considered by the zoning commission before final action on the plan. If the commissioner fails to comment on a plan within the thirty-five-day period or any extension granted by the zoning commission, the zoning commission may take final action on such plan. Failure to comment by the commissioner shall not be construed to be approval or disapproval.

(e) The zoning commission may, at its discretion, hold a hearing on a coastal site plan required by this section. The commission shall hold a hearing on a coastal site plan for a shoreline flood and erosion control structure upon the request of the Commissioner of Energy and Environmental Protection.

(f) The zoning commission shall set forth the reasons for any decision to deny, modify or condition a coastal site plan submitted under this section. A copy of any decision shall be sent by certified mail to the person who submitted such plan within fifteen days after such decision is rendered. A copy of any decision on a coastal site plan for a shoreline flood and erosion control structure shall be sent to the Commissioner of Energy and Environmental Protection within fifteen days after such decision is rendered. The commission shall publish notice of the approval or denial of a coastal site plan, in a newspaper having a general circulation in the municipality, not more than fifteen days after such decision is rendered.

(g) The coastal site plan review required under this section shall be subject to the same statutory requirements as subsections (a) and (b) of section 8-7d for the purposes of determining the time limitations on the zoning commission in reaching a final decision.

(h) In addition to the requirements of subsection (f) of section 8-3, no building permit or certificate of occupancy shall be issued for a building, use or structure subject to the zoning regulations of a municipality and located fully or partially within the coastal boundary, or for any shoreline flood and erosion control structure as defined in subsection (c) of this section, and located fully or partially within the coastal boundary, without certification in writing by the official charged with enforcement of such regulations that such building, use, structure or shoreline flood and erosion control structure has been reviewed and approved in accordance with the requirements of this chapter or is a use exempt from such review under regulations adopted by the zoning commission in accordance with this section.

(i) A municipality by vote of its legislative body may delegate its responsibility for coastal site plan review under this section to a special district exercising zoning authority under special act for the area within both the coastal boundary and limits of the special district, subject to acceptance by the special district of such responsibility following the procedures listed in section 7-327. The municipality may revoke the delegation of such responsibilities and the special district may also revoke acceptance of such responsibility under this subsection at any time. Notwithstanding the provisions of this subsection, the town of Groton shall delegate authority for coastal site plan review to the Noank fire district.

(j) A municipal zoning commission reviewing, in accordance with this section, a coastal site plan for a building use, structure, or shoreline flood and erosion control structure occurring within the limits of a special district exercising zoning authority under special act shall provide a copy of the coastal site plan to the chief elected official of such district and shall provide an adequate opportunity for comment by such official prior to making a final decision on the coastal site plan. A special district delegated the responsibility for coastal site plan reviews in accordance with subsection (i) of this section shall provide a copy of any coastal site plan submitted for its review to the municipal zoning commission of the town in which the project is to occur and shall provide an adequate opportunity for comment by the zoning commission prior to making a final decision on the coastal site plan.

(P.A. 79-535, S. 15, 25; P.A. 82-250, S. 4, 6; P.A. 83-525, S. 4, 5; P.A. 87-495, S. 1; P.A. 05-288, S. 96; P.A. 11-80, S. 1; P.A. 12-101, S. 3; P.A. 13-179, S. 7.)

History: P.A. 82-250 amended Subsec. (b) to authorize zoning commissions to exempt from coastal site plan review interior modifications to buildings and minor use changes in a building structure or property and to make technical corrections; P.A. 83-525 amended Subsec. (b) by limiting a zoning commission's power to exempt construction of a single-family residential structure to those structures not located on an island connected to the mainland by an existing road, bridge or causeway and amended Subsec. (d) by requiring the commission to publish notice of the approval of a coastal site plan; P.A. 87-495 amended Subsec. (a) by applying provisions to shoreline flood and erosion control structures, added new Subsec. (c) defining shoreline flood and erosion control structures and new Subsec. (d) regarding review of shoreline flood and erosion control structures and relettered the section accordingly and amended new Subsecs. (f), (h) and (j) to apply to shoreline flood and erosion control structures; P.A. 05-288 made technical changes in Subsec. (a), effective July 13, 2005; pursuant to P.A. 11-80, “Commissioner of Environmental Protection” was changed editorially by the Revisors to “Commissioner of Energy and Environmental Protection”, effective July 1, 2011; P.A. 12-101 amended Subsec. (a) to add provision re criteria for approval of coastal site plan for a shoreline flood and erosion structure and amended Subsec. (c) to exclude from definition of “shoreline flood and erosion control structure” any activity for which the primary purpose or effect is the restoration or enhancement of tidal wetlands, dunes or intertidal flats, effective June 8, 2012; P.A. 13-179 amended Subsec. (b)(2) to add provision re elevated decks.

Cited. 222 C. 269; 225 C 432; 228 C. 187.

Cited. 7 CA 684; 35 CA 317.

Subsec. (d):

Cited. 225 C. 1.

Zoning board must consider recommendations or comments submitted by commissioner, but no indication in act or elsewhere that such recommendations or comments are binding on board. 112 CA 239.

Subsec. (g) (former Subsec. (e)):

Express incorporation of Sec. 8-7d(b) reflects intent to incorporate as well the presumption of Sec. 8-3(g) making the 65-day period mandatory. 192 C. 353. Any application under statute not expressly denied or modified within the statutory period is deemed approved by operation of law. Id., 367.

Cited. 6 CA 284.

The 16 cases that cite Conn. Gen. Stat. § 22a-109 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENDeBeradinis v. Zoning Comm'n, 635 A.2d 1220 (Conn. 1994).
cites § 22a-109 8×cited by 130 cases
Where it cites § 22a-109
“In a subsequent letter, the department of environmental protection (department), per General Statutes § 22a-109 (d), offered its comments and recommendations with regard to the plaintiffs application.”
The case’s holding
A reviewing court must search the record for evidence supporting the decision of a local zoning board.
Later courts cite it for
“it is the duty of a reviewing court to search the record before it for evidence supporting the decision of a local zoning board. . . .” · 6 citing courts
2
GREENCaron v. Inland Wetlands & Watercourses Comm'n, 610 A.2d 584 (Conn. 1992).
cites § 22a-109 8×cited by 51 cases
Where it cites § 22a-109
“They claim that, since the legislature placed the same sixty-five day time limitation on site plan review; General Statutes § 8-7d (b); coastal site plan review; General Statutes § 22a-109 (g); subdivision applications; General Statutes § 8-26d (b); and inland wetlands and…”
The case’s holding
The statutory time limit for wetlands agencies to act on applications is directory rather than mandatory and failure to meet the deadline does not result in automatic approval.
Later courts cite it for
“the legislature is presumed to be aware of judicial interpretations of a statute” · 1 citing court
cites § 22a-109 7×cited by 22 cases
Where it cites § 22a-109
“Further evidence that the legislature did not intend a separate site plan review of coastal site plans is found in General Statutes § 22a-109 (a), 15 which negates the applicability of § 8-3 (g) to coastal site plan applications.”
The case’s holding
Under Connecticut's Environmental Protection Act, the statute permitting intervention in agency proceedings is extremely broad regarding which parties may intervene, reaching beyond traditional standing limits.
4
GREENShapero v. Zoning Bd., 472 A.2d 345 (Conn. 1984).
cites § 22a-109 6×cited by 39 cases
Where it cites § 22a-109
“On January 25,1982, the plaintiff filed an application for coastal *369 site plan review with the defendant zoning board pursuant to General Statutes § 22a-109. On January 29, 1982, he filed plans for the foundation of the project with the Stamford building inspector, the…”
The case’s holding
A contract purchaser of real property possesses sufficient interest in the land to have standing to apply for a special exception, zoning variance, or building permit.
Later courts cite it for
“a contract purchaser of real property, such as this plaintiff, has sufficient interest in the property to have standing to apply for a special exception or zoning variance.” · 2 citing courts
5
GREENGrasso v. Zoning Bd. of Appeals of the Groton Long Point Ass'n, 794 A.2d 1016 (Conn. App. Ct. 2002).
cites § 22a-109 4×cited by 24 cases
Where it cites § 22a-109
“” General Statutes § 8-3 (g); see also General Statutes § 22a-109 (establishing special criteria for coastal site plans).”
6
GREENCarr v. Woolwich, 510 A.2d 1358 (Conn. App. Ct. 1986).
cites § 22a-109 5×cited by 32 cases
Where it cites § 22a-109
“In Vartuli , the court was faced with the issue of whether a coastal site plan review which, pursuant to General Statutes § 22a-109 (e), is “subject to the same statutory requirement as subsection (b) of § 8-7d for the purpose of determining the time limitations on the zoning…”
The case’s holding
A zoning commission's failure to deny or modify a site plan within the statutory time limit results in a presumption of approval for the entire application.
Later courts cite it for
“if general statutes 8-7d (b) is mandatory because of the clause providing for the applicant's consent to an extension of the sixty-five day time period, then general statutes 8-7d (a) is equally mandatory.” · 2 citing courts
cites § 22a-109 3×cited by 61 cases
Where it cites § 22a-109
“Section 22a-109 (g) provided: “The coastal site plan review required under this section shall be subject to the same statutory requirements as subsections (a) and (b) of section 8-7d for the purposes of determining the time limitations on the zoning commission in reaching a…”
The case’s holding
The automatic approval doctrine does not apply to a zoning board of appeals that fails to hold a public hearing within the statutory time limits.
Later courts cite it for
“it is a principal of statutory construction that a court must construe a statute as written.” · 3 citing courts
8
GREENMcNally v. Zoning Comm'n, 621 A.2d 279 (Conn. 1993).
cites § 22a-109 2×cited by 93 cases
Where it cites § 22a-109
“In October, 1989, pursuant to General Statutes § 22a-109 (d), the commission submitted the plan to the state department of environmental protection (DEP) for comments.”
The case’s holding
A statute is not applied retroactively to pending actions unless the legislature clearly expresses an intent to do so.
Later courts cite it for
“a statute should not be applied retroactively to pending actions unless the legislature clearly expressed an intent that it should be so applied.” · 6 citing courts
9
NEUTRALRead v. Plan. & Zoning Comm'n, 646 A.2d 222 (Conn. App. Ct. 1994).
cites § 22a-109 21×cited by 8 cases
Where it cites § 22a-109
“This claim requires us to analyze the relationship between General Statutes §§ 22a-109 and 8-3 (g). The trial court specifically found that even though Boyce’s site plan was submitted pursuant to § 22a-109, the zoning commission’s decision was illegal because the defendant…”
Later courts cite it for
“the coastal management act was expressly concerned with providing uniform standards for evaluating the impact of coastal development, while allowing municipalities to maintain local control over the process.” · 3 citing courts
10
GREEN9 Pettipaug, LLC v. Plan. & Zoning Comm'n, 316 A.3d 318 (Conn. 2024).
cites § 22a-109 2×cited by 7 cases
Where it cites § 22a-109
“Indeed, the Appellate Court’s decision in this case relied on this rule of construction in concluding that the word ‘‘substantial’’ is quantitative in nature. See 9 Pettipaug, LLC v. Planning & Zoning Commission, supra, 217 Conn.”
11
GREENHescock v. Zon. Bd. of App. of Town of Stonington, 962 A.2d 177 (Conn. App. Ct. 2009).
cites § 22a-109 2×cited by 10 cases
Where it cites § 22a-109
“The only other evidence in the record, besides the defendants’ application, was Szymanski’s letter, which concluded that the application was incomplete for the purposes of determining the project’s consistency with the act.”
12
GREENSmith-Groh, Inc. v. Plan. & Zoning Comm'n of Greenwich, 826 A.2d 249 (Conn. App. Ct. 2003).
cites § 22a-109 2×cited by 9 cases
Where it cites § 22a-109
“” General Statutes § 22a-109 (f) provides in relevant part that “[t]he zoning commission shall set forth the reasons for any decision to deny .”
13
REDVartuli v. Sotire, 472 A.2d 336 (Conn. 1984).
cites § 22a-109 26×cited by 110 cases
Overruled (citation reading): 2 citing references read overruled, the strongest is Strand/BRC Group, LLC v. Board of Representatives (2022). No later court annotation says how far.
Where it cites § 22a-109
“On October 5, 1981, the plaintiffs filed an application with the zoning board for coastal site plan approval, pursuant to General Statutes § 22a-109. After requesting a postponement, the plaintiffs submitted a revised application to the zoning board on December 18, 1981.”
The case’s holding
A writ of mandamus is the proper procedural remedy to obtain a certificate of approval when an application has been approved by operation of law.
Later courts cite it for
“(1) that the plaintiff has a clear legal right to the performance of a duty by the defendant; (2) that the defendant has no discretion with respect to the performance of that duty; and (3) that the plaintiff has no adequate remedy at law.” · 8 citing courts
14
GREENRoss v. Plan. & Zoning Comm'n, 982 A.2d 1084 (Conn. App. Ct. 2009).
cites § 22a-109 2×cited by 4 cases
Where it cites § 22a-109
“5 *60 In its memorandum of decision, the court incorporated its decision in the companion case, in which it concluded that “[s]ince the property is located more than 200 feet from the mean high water mark, the property was exempt from coastal site plan review pursuant to General…”
15
NEUTRALCamm v. Hart, 504 A.2d 1388 (Conn. App. Ct. 1986).
cites § 22a-109 2×cited by 4 cases
Where it cites § 22a-109
““This additional requirement is imposed by General Statutes § 8-3 (f), which expressly prohibits the issuance of a building permit unless the proposed building ‘is in conformity with such [zoning] regulations (Footnote omitted.”
16
GREENBerglass v. Dworkin, 344 A.3d 619 (Conn. App. Ct. 2025).
cites § 22a-109 2×cited by 0 cases
Where it cites § 22a-109
“In count two of the complaint, the plaintiff incorporated most of the allegations set forth in count one and further asserted that the proposed pool, in the absence of a coastal site plan review and appropriate engineering design, was an unreasonable act and violated the public…”

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198420042025

One bar per year. Tallest: 2 cases in 1984. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Conn.8Conn. App. Ct.8
By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.