Conn. Gen. Stat.Title 08 — Zoning, Planning, Housing and Economic and Community DevelopmentChapter 124 — Zoning

Conn. Gen. Stat. § 8-7d (2025)

Hearings and decisions. Time limits. Day of receipt. Notice to adjoining municipality. Public notice registry

Edition and currency
laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026) cited 1982–2026 91citing cases
At a glance

Courts have cited this section in 91 opinions since 1982, 4 of them in the last five years. The most litigated part is subsection (a) (2 cases).

(a) In all matters wherein a formal petition, application, request or appeal must be submitted to a zoning commission, planning and zoning commission or zoning board of appeals under this chapter, a planning commission under chapter 126 or an inland wetlands agency under chapter 440 or an aquifer protection agency under chapter 446i and a hearing is required or otherwise held on such petition, application, request or appeal, such hearing shall commence within sixty-five days after receipt of such petition, application, request or appeal and shall be completed within thirty-five days after such hearing commences, unless a shorter period of time is required under this chapter, chapter 126, chapter 440 or chapter 446i. Notice of the hearing shall be published in a newspaper having a general circulation in such municipality where the land that is the subject of the hearing is located at least twice, at intervals of not less than two days, the first not more than fifteen days or less than ten days and the last not less than two days before the date set for the hearing. In addition to such notice, such commission, board or agency may, by regulation, provide for additional notice. Such regulations shall include provisions that the notice be mailed to persons who own land that is adjacent to the land that is the subject of the hearing or be provided by posting a sign on the land that is the subject of the hearing, or both. For purposes of such additional notice, (1) proof of mailing shall be evidenced by a certificate of mailing, (2) the person who owns land shall be the owner indicated on the property tax map or on the last-completed grand list as of the date such notice is mailed, and (3) a title search or any other additional method of identifying persons who own land that is adjacent to the land that is the subject of the hearing shall not be required. All applications and maps and documents relating thereto shall be open for public inspection. At such hearing, any person or persons may appear and be heard and may be represented by agent or by attorney. All decisions on such matters shall be rendered not later than sixty-five days after completion of such hearing, unless a shorter period of time is required under this chapter, chapter 126, chapter 440 or chapter 446i. The petitioner or applicant may consent to one or more extensions of any period specified in this subsection, provided the total extension of all such periods shall not be for longer than sixty-five days, or may withdraw such petition, application, request or appeal.

(b) Notwithstanding the provisions of subsection (a) of this section, whenever the approval of a site plan is the only requirement to be met or remaining to be met under the zoning regulations for any building, use or structure, a decision on an application for approval of such site plan shall be rendered not later than sixty-five days after receipt of such site plan. Whenever a decision is to be made on an application for subdivision approval under chapter 126 on which no hearing is held, such decision shall be rendered not later than sixty-five days after receipt of such application. Whenever a decision is to be made on an inland wetlands and watercourses application under chapter 440 on which no hearing is held, such decision shall be rendered not later than sixty-five days after receipt of such application. Whenever a decision is to be made on an aquifer protection area application under chapter 446i on which no hearing is held, such decision shall be rendered not later than sixty-five days after receipt of such application. The applicant may consent to one or more extensions of such period, provided the total period of any such extension or extensions shall not exceed sixty-five days or may withdraw such plan or application.

(c) For purposes of subsection (a) or (b) of this section and section 7-246a, the date of receipt of a petition, application, request or appeal shall be the day of the next regularly scheduled meeting of such commission, board or agency, immediately following the day of submission to such commission, board or agency or its agent of such petition, application, request or appeal or thirty-five days after such submission, whichever is sooner. If the commission, board or agency does not maintain an office with regular office hours, the office of the clerk of the municipality shall act as the agent of such commission, board or agency for the receipt of any petition, application, request or appeal.

(d) The provisions of subsection (a) of this section shall not apply to any action initiated by any zoning commission, planning commission or planning and zoning commission regarding adoption or change of any zoning regulation or boundary or any subdivision regulation.

(e) Notwithstanding the provisions of this section, if an application involves an activity regulated pursuant to sections 22a-36 to 22a-45, inclusive, and the time for a decision by a zoning commission or planning and zoning commission established pursuant to this section would elapse prior to the thirty-fifth day after a decision by the inland wetlands agency, the time period for a decision shall be extended to thirty-five days after the decision of such agency. The provisions of this subsection shall not be construed to apply to any extension consented to by an applicant or petitioner.

(f) The zoning commission, planning commission, zoning and planning commission, zoning board of appeals, inland wetlands agency or aquifer protection agency shall notify the clerk of any adjoining municipality of the pendency of any application, petition, appeal, request or plan concerning any project on any site in which: (1) Any portion of the property affected by a decision of such commission, board or agency is within five hundred feet of the boundary of the adjoining municipality; (2) a significant portion of the traffic to the completed project on the site will use streets within the adjoining municipality to enter or exit the site; (3) a significant portion of the sewer or water drainage from the project on the site will flow through and significantly impact the drainage or sewerage system within the adjoining municipality; or (4) water runoff from the improved site will impact streets or other municipal or private property within the adjoining municipality. Such notice shall be made by certified mail, return receipt requested, and shall be mailed within seven days of the date of receipt of the application, petition, request or plan. Such adjoining municipality may, through a representative, appear and be heard at any hearing on any such application, petition, appeal, request or plan.

(g) (1) Any zoning commission, planning commission or planning and zoning commission initiating any action regarding adoption or change of any zoning regulation or boundary or any subdivision regulation or regarding the preparation or amendment of the plan of conservation and development shall provide notice of such action in accordance with this subsection in addition to any other notice required under any provision of the general statutes.

(2) A zoning commission, planning commission or planning and zoning commission shall establish a public notice registry of landowners, electors and nonprofit organizations qualified as tax-exempt organizations under the provisions of Section 501(c) of the Internal Revenue Code of 1986, or any subsequent corresponding internal revenue code of the United States, as from time to time amended, requesting notice under this subsection. Each municipality shall notify residents of such registry and the process for registering for notice under this subsection. The zoning commission, planning commission or planning and zoning commission shall place on such registry the names and addresses of any such landowner, elector or organization upon written request of such landowner, elector or organization. A landowner, elector or organization may request such notice be sent by mail or by electronic mail. The name and address of a landowner, elector or organization who requests to be placed on the public notice registry shall remain on such registry for a period of three years after the establishment of such registry. Thereafter any land owner, elector or organization may request to be placed on such registry for additional periods of three years.

(3) Any notice under this subsection shall be mailed to all landowners, electors and organizations in the public notice registry not later than seven days prior to the commencement of the public hearing on such action, if feasible. Such notice may be mailed by electronic mail if the zoning commission, planning commission or planning and zoning commission or the municipality has an electronic mail service provider.

(4) No zoning commission, planning commission or planning and zoning commission shall be civilly liable to any landowner, elector or nonprofit organization requesting notice under this subsection with respect to any act done or omitted in good faith or through a bona fide error that occurred despite reasonable procedures maintained by the zoning commission, planning commission or planning and zoning commission to prevent such errors in complying with the provisions of this section.

(1971, P.A. 862, S. 12; P.A. 77-450, S. 4; P.A. 78-104, S. 1; P.A. 82-81, S. 1; P.A. 87-533, S. 10, 14; P.A. 93-385, S. 2; P.A. 99-21, S. 1; P.A. 03-177, S. 5; P.A. 04-257, S. 6; P.A. 06-80, S. 1; P.A. 07-85, S. 1; P.A. 15-68, S. 2.)

History: P.A. 77-450 reworded previous provisions and designated them as Subsec. (c) and inserted new Subsecs. (a) and (b) before and new Subsec. (d) after; P.A. 78-104 amended Subsec. (a) to allow more than one extension and changed maximum extension time from double the original period to a time equaling the original period, made Subsec. (b) applicable to cases where site plan approval is only requirement to be met or remaining to be met and clarified Subsec. (c) by replacing references to “official receipt” with references to “submission”; P.A. 82-81 provided that town clerk would act as agent for receipt of documents for any board or commission not having regular office hours; P.A. 87-533 added Subsec. (e) regarding applications involving activity regulated pursuant to Secs. 22a-36 to 22a-45, inclusive; P.A. 93-385 amended Subsec. (b) by applying provisions to all buildings, uses or structures instead of limiting applications to proposals; P.A. 99-21 amended Subsec. (a) to extend the time for completion of a hearing from 30 to 35 days after commencement; P.A. 03-177 amended Subsec. (a) to apply provisions to planning commissions and inland wetlands agencies and add provisions re public hearings, amended Subsec. (b) to add provisions re date for rendering decisions, amended Subsec. (c) to add reference to Sec. 7-246a and make conforming changes and added new Subsec. (f) re notification to adjoining municipalities, effective October 1, 2003, and applicable to applications filed on or after that date; P.A. 04-257 made technical changes in Subsec. (a), effective June 14, 2004; P.A. 06-80 amended Subsec. (a) to add provisions re mailing and posting of additional notice, amended Subsec. (d) to add reference to planning commission and to any subdivision regulation and added Subsec. (g) re a public notice registry for changes initiated by commissions for zoning regulations or boundaries, subdivision regulations or the plan of conservation and development; P.A. 07-85 amended Subsecs. (a), (b) and (f) to apply provisions to aquifer protection agency and made technical changes in Subsecs. (a) and (b); P.A. 15-68 amended Subsec. (a) by adding Subdiv. (3) re title search or other method of identifying owners of adjacent land not required for purposes of additional notice, effective June 19, 2015.

Cited. 192 C. 353; 194 C. 187; 206 C. 554; 211 C. 331; 219 C. 352; 222 C. 269; 224 C. 44; 225 C. 432; Id., 575; 230 C. 641. If site plan and accompanying documents are separable, time constraints in section do not apply. 253 C. 183. When approval for site plan and special exception are separate actions, provisions re statutory timelines do not apply. Id., 195.

Cited. 3 CA 556; 7 CA 684; 15 CA 561; 17 CA 405. Requirements satisfied only by commencement of timely public hearing. 27 CA 412. Cited. 29 CA 469; 35 CA 599; 43 CA 512. When site plan is separable from its accompanying documents and the special permit application is for a use not permitted as of right, section is not applicable, and where the special permit application must contain a site plan, automatic approval under section may not occur if commission does not meet the time limits in Sec. 8-3c. 60 CA 504. Zoning board required to hold a hearing on plaintiff's zoning application. 69 CA 230. The absence of proposed locations contemplated by an applicant in the public notice renders such notice insufficient. 116 CA 542.

Cited. 42 CS 57.

Subsec. (a):

Cited. 209 C. 812; 222 C. 911.

Cited. 14 CA 365; 23 CA 256; 33 CA 281; 35 CA 317; Id., 599. Trial court properly determined that failure of planning and zoning commission to comply with statutory notice and hearing requirements entitled individual plaintiffs to automatic approval of their application for special permit and site plan approval; notice of commission hearing was invalid and because failure to give notice was a jurisdictional defect, action of commission in denying plaintiffs' application was void. 52 CA 763. There is no language in section indicating that if the commission chose to impose on an applicant a supplemental notice requirement by regulation, that the applicant's failure to comply with the supplemental notice provision would be attributable to the commission and trigger the lengthy appeal period in Sec. 8-8(r). 165 CA 488.

Cited. 41 CS 196.

Subsec. (b):

Cited. 194 C. 152; 209 C. 812; 211 C. 331; 222 C. 269; 226 C. 684. Applicant's submission of revised site plan did not create a new 65-day period within which planning and zoning commission could act. 278 C. 408.

Cited. 2 CA 489; 21 CA 347; Id., 421; 35 CA 317. Section not unconstitutional just because it does not expressly provide for a right of appeal from automatic approval of site plan applications. Id., 599. Cited. 37 CA 348.

Subsec. (f):

It is implicit in Subdiv. (2) that a zoning commission cannot unilaterally bind an adjoining town to a determination that the streets are adequate to handle traffic from a permitted land use in the first town, therefore adjoining town's claim that it had no choice but to close adjoining road has no merit. 295 C. 802.

The 20 cases that cite Conn. Gen. Stat. § 8-7d most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENCarr v. Woolwich, 510 A.2d 1358 (Conn. App. Ct. 1986).
cites § 8-7d 86×subsections: (a) 2×cited by 32 cases
Where it cites § 8-7d
“This appeal involves the issue of whether the failure of the defendant planning and zoning com *685 mission to act upon the plaintiffs application for a zoning permit for a permitted use of his property within the time constraints set by General Statutes § 8-7d results in the…”
The case’s holding
A zoning commission's failure to deny or modify a site plan within the statutory time limit results in a presumption of approval for the entire application.
Later courts cite it for
“if general statutes 8-7d (b) is mandatory because of the clause providing for the applicant's consent to an extension of the sixty-five day time period, then general statutes 8-7d (a) is equally mandatory.” · 2 citing courts
cites § 8-7d 44×cited by 61 cases
Where it cites § 8-7d
“, 1 were entitled to the auto *434 matic approval of their site plan application to permit the construction of an asphalt plant in Colchester because the Colchester zoning board of appeals, believing that it did not have jurisdiction over their appeal, did not hold a public…”
The case’s holding
The automatic approval doctrine does not apply to a zoning board of appeals that fails to hold a public hearing within the statutory time limits.
Later courts cite it for
“it is a principal of statutory construction that a court must construe a statute as written.” · 3 citing courts
cites § 8-7d 35×cited by 20 cases
Where it cites § 8-7d
“Prior to the January 27, 2003 denial, the plaintiff asked the commission to issue a certificate of approval of the site plan application, claiming that it had been approved by operation of law pursuant to General Statutes §§ 8-7d (b) 3 and 8-3 (g) 4 because more than sixty-five…”
Later courts cite it for
“we also note that, although this court is not bound by a zoning board's interpretation of its regulations, a board's reasonable, time-tested interpretation is given great weight.” · 3 citing courts
4
GREENFrito-Lay, Inc. v. Plan. & Zoning Comm'n, 538 A.2d 1039 (Conn. 1988).
cites § 8-7d 19×cited by 247 cases
Where it cites § 8-7d
“See General Statutes § 8-7d (c). Thereafter, a public hearing was set by the commission for January 14, 1985.”
The case’s holding
A local zoning authority acts illegally when it conducts public hearings after the statutory hearing period has closed.
Later courts cite it for
“determined that because the commission did act illegally, we should go no further than to sustain frito-lay's appeal and remand this entire matter to the commission for a new hearing in accordance with law.” · 2 citing courts
5
GREENOctober Twenty-Four, Inc. v. Plan. & Zoning Comm'n, 646 A.2d 926 (Conn. App. Ct. 1994).
cites § 8-7d 39×cited by 13 cases
Where it cites § 8-7d
“On appeal, the plaintiff claims that the trial court improperly (1) decided that General Statutes § 8-7d (b), rather than General Statutes § 8-7d (a), governed the commission’s consideration of Tomasso’s site plan application, (2) failed to find waiver or estoppel on the part of…”
6
GREENUniv. Realty, Inc. v. Plan. Comm'n, 490 A.2d 96 (Conn. App. Ct. 1985).
cites § 8-7d 33×cited by 16 cases
Where it cites § 8-7d
“” General Statutes § 8-7d (b). The applicant may withdraw the plan or consent to extensions of the sixty-five day period, but the total period within which the decision must be made cannot exceed two further sixty-five day periods.”
7
GREENSSM Assocs. Ltd. P'ship v. Plan & Zoning Comm'n, 559 A.2d 196 (Conn. 1989).
cites § 8-7d 19×subsections: (b) 2×cited by 41 cases
Where it cites § 8-7d
“se of sixty-five days after its submission pursuant to General Statutes §8-7d(b) also resulted in automatic approval of the special permit zoning application, which had included the site plan as a supporting document pursuant to the zoning regulations?” and “(2) When a site plan…”
The case’s holding
Municipal regulations cannot bypass statutory automatic approval time limits by labeling a site plan application as a special permit when the documents are inseparable.
8
GREENGaida v. Plan. & Zoning Comm'n, 947 A.2d 361 (Conn. App. Ct. 2008).
cites § 8-7d 27×cited by 7 cases
Where it cites § 8-7d
“On appeal, the plaintiffs claim that the court improperly concluded that (1) notice of the rescheduled public hearing was not required to conform to the provisions of General Statutes § 8-7d (a) 1 and (2) the alteration of the zoning scheme did not constitute impermissible spot…”
9
GREENCaron v. Inland Wetlands & Watercourses Comm'n, 610 A.2d 584 (Conn. 1992).
cites § 8-7d 12×cited by 51 cases
Where it cites § 8-7d
“They claim, however, that § 22a-42a (c) is mandatory because it is administratively linked to General Statutes § 8-3 (g), 8 which forbids a zoning commission from rendering a decision on a site plan application until the inland wetlands agency has submitted a report with its…”
The case’s holding
The statutory time limit for wetlands agencies to act on applications is directory rather than mandatory and failure to meet the deadline does not result in automatic approval.
Later courts cite it for
“the legislature is presumed to be aware of judicial interpretations of a statute” · 1 citing court
10
GREENGelinas v. Town of West Hartford, 626 A.2d 259 (Conn. 1993).
cites § 8-7d 9×cited by 87 cases
Where it cites § 8-7d
“) General Statutes § 8-7d provides in relevant part: “(a) Except as provided in subsection (b) of this section, in all matters wherein a formal petition, application, request or appeal must be submitted to a zoning commission, planning and zoning commission or zoning board of…”
The case’s holding
A writ of mandamus issues only when the petitioner has a clear legal right to performance and the respondent is under a clear legal obligation to act.
Later courts cite it for
“the writ will issue only when the person against whom it is directed is under a clear legal obligation to perform the act compelled and the party seeking the writ has a clear legal right to the performance.” · 3 citing courts
11
REDCtr. Shops of East Granby, Inc. v. Plan. & Zoning Comm'n, 727 A.2d 807 (Conn. App. Ct. 1999).
cites § 8-7d 27×cited by 7 cases
Reversed by Center Shops of East Granby, Inc. v. Planning & Zoning Commission (2000): the Supreme Court of Connecticut's own opinion in this case.
Where it cites § 8-7d
“The relevant certified question was as follows: “Does the ‘automatic approval’ doctrine, applicable to a zoning commission that fails to issue timely decisions on site plan or subdivision applications under General Statutes §§ 8-3 (g) and 8-26, also apply to a zoning board of…”
12
GREENHarlow v. Plan. & Zoning Comm'n, 479 A.2d 808 (Conn. 1984).
cites § 8-7d 8×cited by 44 cases
Where it cites § 8-7d
“See General Statutes § 8-7d (c). 1 *190 On July 13,1978, effective July 20,1978, the defendant adopted a zoning moratorium covering fourteen acres of the business district of the town of Westport.”
The case’s holding
A writ of mandamus is appropriate to compel a government body to perform a statutory duty when no adequate remedy at law exists to compel the performance.
13
GREENSharp v. Zoning Bd. of Appeals, 684 A.2d 713 (Conn. App. Ct. 1996).
cites § 8-7d 11×cited by 17 cases
Where it cites § 8-7d
“The defendants claim that (1) because the hearing and vote was conducted beyond the maximum time period permitted in General Statutes § 8-7d (a), this court must remand to the board for a new hearing, and (2) the trial court improperly concluded that the board held an…”
14
GREENCarr v. Plan. & Zoning Comm'n, 872 A.2d 385 (Conn. 2005).
cites § 8-7d 8×cited by 13 cases
Where it cites § 8-7d
“” General Statutes § 8-7d (a) 10 provides in relevant part: “In all matters wherein a formal .”
15
GREENShapero v. Zoning Bd., 472 A.2d 345 (Conn. 1984).
cites § 8-7d 7×cited by 39 cases
Where it cites § 8-7d
“He claimed that the defendant zoning board was required, as a matter of law, to approve his coastal site plan application because the board had failed to render its decision within the sixty-five day period set forth in General Statutes §§ 8-7d (b) 1 and 22a-109 (e).”
The case’s holding
A contract purchaser of real property possesses sufficient interest in the land to have standing to apply for a special exception, zoning variance, or building permit.
Later courts cite it for
“a contract purchaser of real property, such as this plaintiff, has sufficient interest in the property to have standing to apply for a special exception or zoning variance.” · 2 citing courts
cites § 8-7d 11×cited by 11 cases
Where it cites § 8-7d
“General Statutes § 8-7d provides in relevant part: “(a) Except as provided in subsection (b) of this section, in all matters wherein a formal petition, application, request or appeal must be submitted to a zoning commission, planning and zoning commission or zoning board of…”
17
GREENGelinas v. Town of West Hartford, 782 A.2d 679 (Conn. App. Ct. 2001).
cites § 8-7d 4×cited by 24 cases
Where it cites § 8-7d
“to 1987) § 8-7d, 11 which provides that a site plan is pre *271 sumed to be approved unless a decision to deny or modify is rendered within sixty-five days after receipt of the application.”
Later courts cite it for
“that the clear intent of the legislature in conferring the power to sanction on local zoning authorities is prima facie evidence that those daily fine sanctions are civil, and not criminal, in nature” · 1 citing court
18
GREENCarr v. Town of Bridgewater, 616 A.2d 257 (Conn. 1992).
cites § 8-7d 6×cited by 25 cases
Where it cites § 8-7d
“) General Statutes § 8-7d (b) provides: “Whenever the approval of a site plan is the only requirement to be met or remaining to be met under the zoning regulations for a proposed building, use or structure, a decision on an application for approval of such site plan shall be…”
The case’s holding
A zoning authority's discretion, and so whether an applicant has a constitutionally protected entitlement to a permit, is measured as of the time the application is filed.
Later courts cite it for
“zoning authority's discretion must be measured at the time the application is filed” · 2 citing courts
19
GREENFinley v. Inland Wetlands Com'n of Town of Orange, 959 A.2d 569 (Conn. 2008).
cites § 8-7d 4×subsections: (a) 2×cited by 20 cases
Where it cites § 8-7d
“See General Statutes § 22a-42a (c) (1) (inland wetlands hearings “shall be held in accordance with the provisions of subsection [c] of [General Statutes §] 8-7d”); see also General Statutes § 8-7d (a) (“All decisions on such matters shall be rendered within sixty-five days alter…”
Later courts cite it for
“an intervenor pursuant to 22a-19 has standing to bring an appeal from an agency's decision 'only to protect the natural resources of the state from pollution or destruction” · 1 citing court
20
GREENLauver v. Plan. & Zoning Comm'n, 760 A.2d 513 (Conn. App. Ct. 2000).
cites § 8-7d 7×cited by 15 cases
Where it cites § 8-7d
“Pursuant to § 8-3 (g), 5 if a commission fails to *512 act on a site plan within the time specified by General Statutes § 8-7d, 6 the site plan is automatically approved.”

Show all 91 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198220042026

One bar per year. Tallest: 8 cases in 1992. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Conn. App. Ct.48Conn.40Conn. Super. Ct.3
By subsection
(a)2 cases
Finley v. Inland Wetlands Com'n of Town of Orange, 959 A.2d 569 (Conn. 2008).“See General Statutes § 22a-42a (c) (1) (inland wetlands hearings “shall be held in accordance with the provisions of subsection [c] of [General Statutes §] 8-7d”); see also General Statutes § 8-7d (a) (“All decisions on such matters shall be rendered within sixty-five days alter…”
Carr v. Woolwich, 510 A.2d 1358 (Conn. App. Ct. 1986).“This appeal involves the issue of whether the failure of the defendant planning and zoning com *685 mission to act upon the plaintiffs application for a zoning permit for a permitted use of his property within the time constraints set by General Statutes § 8-7d results in the…”
(b)1 case
SSM Assocs. Ltd. P'ship v. Plan & Zoning Comm'n, 559 A.2d 196 (Conn. 1989).“se of sixty-five days after its submission pursuant to General Statutes §8-7d(b) also resulted in automatic approval of the special permit zoning application, which had included the site plan as a supporting document pursuant to the zoning regulations?” and “(2) When a site plan…”

Show all 91 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.