Ohio Revised Code

Ohio Rev. Code § 4906.13 (2026)

No local jurisdiction

✓ current as of May 2026
Find cases: SyfertCases citing this section ORCcodes.ohio.gov (official) Justiaon Justia CornellLII Search CasesGoogle Scholar

(A) As used in this section and sections 4906.20 and 4906.98 of the Revised Code, "economically significant wind farm" means wind turbines and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of five or more megawatts but less than fifty megawatts. The term excludes any such wind farm in operation on June 24, 2008. The term also excludes one or more wind turbines and associated facilities that are primarily dedicated to providing electricity to a single customer at a single location and that are designed for, or capable of, operation at an aggregate capacity of less than twenty megawatts, as measured at the customer's point of interconnection to the electrical grid.

(B) No public agency or political subdivision of this state may require any approval, consent, permit, certificate, or other condition for the construction or operation of a major utility facility or economically significant wind farm authorized by a certificate issued pursuant to Chapter 4906. of the Revised Code. Nothing herein shall prevent the application of state laws for the protection of employees engaged in the construction of such facility or wind farm nor of municipal regulations that do not pertain to the location or design of, or pollution control and abatement standards for, a major utility facility or economically significant wind farm for which a certificate has been granted under this chapter.

Notes of Decisions
Cited in 5 cases (2 in the last 5 years), 1995–2025 · leading case: In re Application of Buckeye Wind, L.L.C., 2012 Ohio 878 (Ohio 2012).
Sort: Relevance Newest Treatment
In re Application of Buckeye Wind, L.L.C., 2012 Ohio 878 (Ohio 2012). · cites it 4× “The Board’s Order Should Be Affirmed A. The Board’s Order Followed Statutory Requirements {¶ 26} The board has exclusive jurisdiction over construction of wind farms such as the one proposed by Buckeye.”
State ex rel. Ohio Edison Co. v. Parrott, 654 N.E.2d 106 (Ohio 1995). · cites it 2× “01(B)(2) and *708 (D), 4906.04, and 4906.98.”
In re Application of Icebreaker Windpower, Inc., 2022 Ohio 2742 (Ohio 2022). “7 megawatts, making it an “economically significant wind farm,” R.C. 4906.13(A) and Ohio Adm.Code 4906-1-01(R), the construction of which requires the board’s approval, R.”
In re Application of 6011 Greenwich Windpark, L.L.C. (Slip Opinion), 2019 Ohio 2406 (Ohio 2019). “20 applies to an “economically significant wind farm,” which is a wind farm capable of operating at an aggregate capacity between 5 and 50 megawatts, R.C. 4906.13(A). R.C. 4906.201 applies to a wind farm capable of operating at an aggregate capacity of 50 megawatts or more, such…”
State ex rel. McGrail v. Lordstown Vill. Council, 2025 Ohio 4630 (Ohio Ct. App. 2025). “{¶39} In its brief, the Village notes that R.C. 4906.13(B) gives the Ohio Power Siting Board exclusive authority to adjudicate the complaint and objection to the Clean Energy Future – Trumbull, LLC case.”
— Ohio Rev. Code § 4906.13(A) — 2 cases
In re Application of Icebreaker Windpower, Inc., 2022 Ohio 2742 (Ohio 2022). “7 megawatts, making it an “economically significant wind farm,” R.C. 4906.13(A) and Ohio Adm.Code 4906-1-01(R), the construction of which requires the board’s approval, R.”
In re Application of 6011 Greenwich Windpark, L.L.C. (Slip Opinion), 2019 Ohio 2406 (Ohio 2019). “20 applies to an “economically significant wind farm,” which is a wind farm capable of operating at an aggregate capacity between 5 and 50 megawatts, R.C. 4906.13(A). R.C. 4906.201 applies to a wind farm capable of operating at an aggregate capacity of 50 megawatts or more, such…”
— Ohio Rev. Code § 4906.13(B) — 1 case
State ex rel. McGrail v. Lordstown Vill. Council, 2025 Ohio 4630 (Ohio Ct. App. 2025). “{¶39} In its brief, the Village notes that R.C. 4906.13(B) gives the Ohio Power Siting Board exclusive authority to adjudicate the complaint and objection to the Clean Energy Future – Trumbull, LLC case.”
Annotations are extracted automatically from the opinions in the Syfert caselaw corpus and ranked by authority, recency, and treatment. Dots show Syfertize treatment of the citing case itself.