Already have an account? Sign in instead.
You stay signed in for 30 days on this browser.
Continue with Google Continue with MicrosoftNo account yet? Create a free one.
We sent a six-digit code.
It expires in ten minutes, works once, and only in this browser. Five wrong tries void it. Send another code.
Your account is live and the Cloudflare checks are off for this browser.
Review of alternative plan
Courts have cited this section in 4 opinions since 1979. The most litigated part is subsection (2) (2 cases).
222.890 Review of alternative plan. (1) An alternative plan proposed pursuant to ORS 222.885 shall be reviewed by the Oregon Health Authority in cases where danger to public health is caused by impure or inadequate domestic water and in all other cases by the Environmental Quality Commission. The plan shall be approved or rejected by the authority or commission. In reviewing the alternative plan contained in the petition, the authority or commission shall consider whether, in its judgment, the plan contains a preferable alternative for the alleviation or removal of the conditions dangerous to public health.
(2)(a) With respect to an alternative plan proposed in a petition filed under ORS 222.885 (1), if the authority or commission determines that annexation to the city provides the best and most expeditious method of removing or alleviating the dangerous conditions, the alternative plan shall be rejected and further proceedings on the finding filed under ORS 222.880 shall resume.
(b) With respect to an alternative plan proposed in a resolution filed under ORS 222.885 (2), if the authority or commission determines that annexation to the city provides the best, most expeditious and most cost-effective method of removing or alleviating the dangerous conditions, the alternative plan shall be rejected and further proceedings on the finding filed under ORS 222.880 shall resume.
(3) If the authority or commission finds that the alternative plan provides a preferable method of alleviating or removing the dangerous conditions, the petitioners or appropriate governing body shall have six months within which to present to the authority or commission information showing:
(a) That the territory in which the conditions dangerous to public health exist:
(A) Has received approval for the extension of a city’s or district’s sewer or water lines within the territory or has annexed to a district authorized by law to provide facilities necessary to remove or alleviate the dangerous conditions, and that financing of the facilities for extension of such facilities to the territory has been assured; or
(B) Has taken substantial steps to implement the alternative plan.
(b) Detailed plans and specifications for the construction of any proposed facilities.
(c) A time schedule for the construction of any proposed facilities.
(d) That proposed facilities, if constructed, will remove or alleviate the conditions dangerous to public health in a manner as satisfactory and expeditious as would be accomplished by the proposed annexation to the city.
(4)(a) The authority or commission shall review the final plan proposed by the petitioners, city or district and shall promptly certify whether the requirements of subsection (3) of this section have been met.
(b) If the requirements have been met, the authority shall certify the alternative plan. Further annexation proceedings on the findings filed under ORS 222.880 shall be suspended and the city shall be so notified.
(c) If the requirements of subsection (3) of this section have not been met or whenever the authority or commission determines that the requirements of the certified plan are not being satisfied, further proceedings on the findings filed under ORS 222.880 shall resume. [1967 c.624 §8a (3), (4), (5); 1973 c.637 §9; 1975 c.639 §8; 1983 c.407 §10; 2009 c.595 §188; 2015 c.281 §2]
222.895 [1967 c.624 §9; 1973 c.637 §10; repealed by 1975 c.639 §9 (222.896 enacted in lieu of 222.895)]
A badge such as ▸ 12 cases opens the cases that cite that subsection.
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 3 cases in 1980. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.
Edition shown: laws through the 2025 session (checked Sept. 2026). Syfert holds no earlier or later version of this section.