31 U.S.C. § 3553 (2026)

Review of protests; effect on contracts pending decision

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1984–2026 195citing cases
At a glance

Courts have cited this section in 195 opinions since 1984, 16 of them in the last five years. The most litigated part is subsection (d)(3)(A)(ii) (2 cases).

(a) Under procedures prescribed under section 3555 of this title, the Comptroller General shall decide a protest submitted to the Comptroller General by an interested party.(b)(1) Within one day after the receipt of a protest, the Comptroller General shall notify the Federal agency involved of the protest.(2) Except as provided in paragraph (3) of this subsection, a Federal agency receiving a notice of a protested procurement under paragraph (1) of this subsection shall submit to the Comptroller General a complete report (including all relevant documents) on the protested procurement—(A) within 30 days after the date of the agency’s receipt of that notice;(B) if the Comptroller General, upon a showing by the Federal agency, determines (and states the reasons in writing) that the specific circumstances of the protest require a longer period, within the longer period determined by the Comptroller General; or(C) in a case determined by the Comptroller General to be suitable for the express option under section 3554(a)(2) of this title, within 20 days after the date of the Federal agency’s receipt of that determination.(3) A Federal agency need not submit a report to the Comptroller General pursuant to paragraph (2) of this subsection if the agency is sooner notified by the Comptroller General that the protest concerned has been dismissed under section 3554(a)(4) of this title.(c)(1) Except as provided in paragraph (2) of this subsection, a contract may not be awarded in any procurement after the Federal agency has received notice of a protest with respect to such procurement from the Comptroller General and while the protest is pending.(2) The head of the procuring activity responsible for award of a contract may authorize the award of the contract (notwithstanding a protest of which the Federal agency has notice under this section)—(A) upon a written finding that urgent and compelling circumstances which significantly affect interests of the United States will not permit waiting for the decision of the Comptroller General under this subchapter; and(B) after the Comptroller General is advised of that finding.(3) A finding may not be made under paragraph (2)(A) of this subsection unless the award of the contract is otherwise likely to occur within 30 days after the making of such finding.(d)(1) A contractor awarded a Federal agency contract may, during the period described in paragraph (4), begin performance of the contract and engage in any related activities that result in obligations being incurred by the United States under the contract unless the contracting officer responsible for the award of the contract withholds authorization to proceed with performance of the contract.(2) The contracting officer may withhold an authorization to proceed with performance of the contract during the period described in paragraph (4) if the contracting officer determines in writing that—(A) a protest is likely to be filed; and(B) the immediate performance of the contract is not in the best interests of the United States.(3)(A) If the Federal agency awarding the contract receives notice of a protest in accordance with this section during the period described in paragraph (4)—(i) the contracting officer may not authorize performance of the contract to begin while the protest is pending; or(ii) if authorization for contract performance to proceed was not withheld in accordance with paragraph (2) before receipt of the notice, the contracting officer shall immediately direct the contractor to cease performance under the contract and to suspend any related activities that may result in additional obligations being incurred by the United States under that contract.(B) Performance and related activities suspended pursuant to subparagraph (A)(ii) by reason of a protest may not be resumed while the protest is pending.(C) The head of the procuring activity may authorize the performance of the contract (notwithstanding a protest of which the Federal agency has notice under this section)—(i) upon a written finding that—(I) performance of the contract is in the best interests of the United States; or(II) urgent and compelling circumstances that significantly affect interests of the United States will not permit waiting for the decision of the Comptroller General concerning the protest; and(ii) after the Comptroller General is notified of that finding.(4)(A) The period referred to in paragraphs (2) and (3)(A), with respect to a contract, is the period beginning on the date of the contract award and ending on the later of—(i) the date that is 10 days after the date of the contract award; or(ii) the date that is 5 days after the debriefing date offered to an unsuccessful offeror for any debriefing that is requested and, when requested, is required.(B) For procurements conducted by any component of the Department of Defense, the 5-day period described in subparagraph (A)(ii) does not commence until the day the Government delivers to a disappointed offeror the written responses to any questions submitted pursuant to section 3304(c)(1)(G) of title 10.(e) The authority of the head of the procuring activity to make findings and to authorize the award and performance of contracts under subsections (c) and (d) of this section may not be delegated.(f)(1) Within such deadlines as the Comptroller General prescribes, upon request each Federal agency shall provide to an interested party any document relevant to a protested procurement action (including the report required by subsection (b)(2) of this section) that would not give that party a competitive advantage and that the party is otherwise authorized by law to receive.(2)(A) The Comptroller General may issue protective orders which establish terms, conditions, and restrictions for the provision of any document to a party under paragraph (1), that prohibit or restrict the disclosure by the party of information described in subparagraph (B) that is contained in such a document.(B) Information referred to in subparagraph (A) is procurement sensitive information, trade secrets, or other proprietary or confidential research, development, or commercial information.(C) A protective order under this paragraph shall not be considered to authorize the withholding of any document or information from Congress or an executive agency.(g) If an interested party files a protest in connection with a public-private competition described in section 3551(2)(B) of this title, a person representing a majority of the employees of the Federal agency who are engaged in the performance of the activity or function subject to the public-private competition may intervene in protest.(Added Pub. L. 98–369, div. B, title VII, § 2741(a), July 18, 1984, 98 Stat. 1200; amended Pub. L. 103–355, title I, §§ 1402, 1403(c), Oct. 13, 1994, 108 Stat. 3287, 3290; Pub. L. 104–106, div. D, title XLIII, § 4321(d)(2), div. E, title LV, § 5501(1), Feb. 10, 1996, 110 Stat. 674, 698; Pub. L. 108–375, div. A, title III, § 326(c), Oct. 28, 2004, 118 Stat. 1848; Pub. L. 115–91, div. A, title VIII, § 818(c), Dec. 12, 2017, 131 Stat. 1464; Pub. L. 117–81, div. A, title XVII, § 1702(l)(5), Dec. 27, 2021, 135 Stat. 2160.)Editorial NotesAmendments

2021—Subsec. (d)(4)(B). Pub. L. 117–81 substituted “section 3304(c)(1)(G)” for “section 2305(b)(5)(B)(vii)”.

2017—Subsec. (d)(4). Pub. L. 115–91 redesignated existing provisions as subpar. (A) and former subpars. (A) and (B) as cls. (i) and (ii), respectively, of subpar. (A) and added subpar. (B).

2004—Subsec. (g). Pub. L. 108–375 added subsec. (g).

1996—Subsec. (b)(2)(A). Pub. L. 104–106, § 5501(1), substituted “30 days” for “35 days”.

Subsec. (b)(3). Pub. L. 104–106, § 4321(d)(2), substituted “3554(a)(4)” for “3554(a)(3)”.

1994—Subsec. (b)(1). Pub. L. 103–355, § 1402(a)(1)(A), substituted “one day after” for “one working day of”.

Subsec. (b)(2)(A). Pub. L. 103–355, § 1402(a)(1)(B)(i), substituted “35 days after” for “25 working days from”.

Subsec. (b)(2)(C). Pub. L. 103–355, § 1402(a)(1)(B)(ii), substituted “20 days after” for “10 working days from”.

Subsec. (c)(3). Pub. L. 103–355, § 1402(a)(2), substituted “after the making of such finding” for “thereafter”.

Subsec. (d). Pub. L. 103–355, § 1402(b), amended subsec. (d) generally. Prior to amendment, subsec. (d) read as follows:

“(d)(1) If a Federal agency receives notice of a protest under this section after the contract has been awarded but within 10 days of the date of the contract award, the Federal agency (except as provided under paragraph (2)) shall, upon receipt of that notice, immediately direct the contractor to cease performance under the contract and to suspend any related activities that may result in additional obligations being incurred by the United States under that contract. Performance of the contract may not be resumed while the protest is pending.

“(2) The head of the procuring activity responsible for award of a contract may authorize the performance of the contract (notwithstanding a protest of which the Federal agency has notice under this section)—

“(A) upon a written finding—

“(i) that performance of the contract is in the best interests of the United States; or

“(ii) that urgent and compelling circumstances that significantly affect interests of the United States will not permit waiting for the decision of the Comptroller General concerning the protest; and

“(B) after the Comptroller General is notified of that finding.”

Subsec. (f). Pub. L. 103–355, § 1403(c), designated existing provisions as par. (1) and added par. (2).

Statutory Notes and Related SubsidiariesEffective Date of 2004 Amendment

Amendment by Pub. L. 108–375 applicable to protests filed under this subchapter that relate to studies initiated under Office of Management and Budget Circular A–76 on or after the end of the 90-day period beginning on Oct. 28, 2004, see section 326(d) of Pub. L. 108–375, set out as a note under section 3551 of this title.

Effective Date of 1996 Amendment

For effective date and applicability of amendment by section 4321(d)(2) of Pub. L. 104–106, see section 4401 of Pub. L. 104–106, set out as a note under section 2220 of Title 10, Armed Forces.

Amendment by section 5501(1) of Pub. L. 104–106 effective 180 days after Feb. 10, 1996, see section 5701 of Pub. L. 104–106, div. E, title LVII, Feb. 10, 1996, 110 Stat. 702.

Effective Date of 1994 Amendment

For effective date and applicability of amendment by Pub. L. 103–355, see section 10001 of Pub. L. 103–355, set out as a note under section 8752 of Title 10, Armed Forces.

Effective Date

Section applicable with respect to any protest filed after Jan. 14, 1985, see section 2751(b) of Pub. L. 98–369, set out as a note under section 4751 of Title 10, Armed Forces.

Construction of 2004 Amendment

Amendment by Pub. L. 108–375 not to be construed to authorize the use of a protest under this subchapter with regard to a decision made by an agency tender official, see section 326(e) of Pub. L. 108–375, set out as a note under section 3551 of this title.

The 20 cases that cite 31 U.S.C. § 3553 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENSupreme Foodservice GmbH v. United States, 109 Fed. Cl. 369 (Fed. Cl. 2013).
cites § 3553 17×cited by 63 cases
Where it cites § 3553
“Post-award bid protest; override of the CICA automatic stay, 31 U.S.C. § 3553 (d); Defense Logistics Agency Troop Support; judgment on the administrative record, RCFC 52.”
The case’s holding
An agency decision to override a statutory stay is arbitrary and capricious if the agency fails to consider relevant factors or provides an explanation contrary to the evidence.
Later courts cite it for
“a motion for judgment on the administrative record examines whether the administrative body, given all the disputed and undisputed facts appearing in the record, acted in a manner that complied with the legal standards governing the decision under review.” · 4 citing courts
2
GREENDairy Maid Dairy, Inc. v. United States, 837 F. Supp. 1370 (E.D. Va. 1993).
cites § 3553 30×cited by 20 cases
Where it cites § 3553
“As required by 31 U.S.C. § 3553 (c)(1), the award of the 3216 Contract to Dairy Maid was stayed pending a decision by the GAO on CIC’s protest.”
Later courts cite it for
“a clear and prejudicial violation of the applicable law ... and was arbitrary, capricious and otherwise not in accordance with the law,” · 1 citing court
3
GREENRamcor Servs. Grp., Inc. v. United States, 185 F.3d 1286 (Fed. Cir. 1999).
cites § 3553 6×cited by 246 cases
Where it cites § 3553
“See 31 U.S.C. § 3553 (c)(1). CICA, however, also allows an agency to override the automatic stay if it issues a written finding that “urgent and compelling circumstances which significantly affect interests of the United States will not permit waiting” for the bid protest…”
The case’s holding
Jurisdiction exists under the Administrative Dispute Resolution Act if a plaintiff alleges a violation of a statute or regulation in connection with a procurement.
Later courts cite it for
“the operative phrase 'in connection with' is very sweeping in scope.” · 24 citing courts
4
GREENPMTech, Inc. v. United States, 95 Fed. Cl. 330 (Fed. Cl. 2010).
cites § 3553 12×cited by 16 cases
Where it cites § 3553
“31 U.S.C. § 3553 (d)(3). CICA further provides, however, that the agency may nonetheless override the automatic stay and proceed with contract performance upon a written determination that either of the following requirements is met: (I) performance of the contract is in the…”
The case’s holding
A CICA stay override is reviewed under the arbitrary and capricious standard, asking whether the decision was rational and considered relevant factors, not whether it conformed to a prescribed framework.
Later courts cite it for
“standing is not often discussed at length in cica stay override cases,” · 6 citing courts
5
GREENSpherix, Inc. v. United States, 62 Fed. Cl. 497 (Fed. Cl. 2004).
cites § 3553 11×cited by 17 cases
Where it cites § 3553
“Specifically, plaintiff seeks to enjoin the Government from continuing to override the automatic statutory stay of proceedings issued pursuant to the Competition in Contracting Act, 31 U.S.C. §§ 3553 (c)(1), 3553(d)(3)(C) (2000) (the “GICA”), upon plaintiffs timely bid protest.”
Later courts cite it for
“failing the ability to show that urgent and compelling circumstances justify the override, the agency head can elect to make the unremarkable determination that contract performance is in the best interests of the united states.” · 3 citing courts
6
GREENUniv. Rsch. Co. v. United States, 65 Fed. Cl. 500 (Fed. Cl. 2005).
cites § 3553 6×cited by 51 cases
Where it cites § 3553
“Moreover, this Court, on August 6, 2004, issued a preliminary injunction enjoining the agency from overriding the automatic stay provision of the Competition in Contracting Act (“CICA”), 31 U.S.C. § 3553 (d)(3)(A), pending a determination by the GAO of the merits of the…”
The case’s holding
Government Accountability Office decisions are not binding on the court but serve as persuasive authority (noting that GAO decisions are not binding on the court but are persuasive).
Later courts cite it for
“when the court considers a bid protest challenge to a past performance evaluation conducted in the course of a negotiated procurement, 'the greatest deference possible is given to the agency.” · 6 citing courts
7
GREENSuperior Helicopter LLC v. United States, 78 Fed. Cl. 181 (Fed. Cl. 2007).
cites § 3553 10×cited by 18 cases
Where it cites § 3553
“After the Forest Service acted on July 9, 2007 under 31 U.S.C. § 3553 (d)(3)(C) to override the stay based on findings of exigent circumstances and the best interests of the government, the three helicopter operators filed suit in this court on July 11, 2007, seeking a temporary…”
8
GREENReilly's Wholesale Produce v. United States, 73 Fed. Cl. 705 (Fed. Cl. 2006).
cites § 3553 5×cited by 72 cases
Where it cites § 3553
“Pursuant to the automatic stay provisions of 31 U.S.C. § 3553 (d), on September 5, 2006, DeCA notified Four Seasons that the contract was suspended and that it was required to cease performance pursuant to FAR § 33.”
The case’s holding
An agency's decision to override an automatic stay is arbitrary and capricious if it fails to consider reasonable alternatives or the impact on competition and procurement integrity.
Later courts cite it for
“how the potential cost of proceeding with the override, including the costs associated with the potential that the gao might sustain the protest, compare to the benefits associated with the approach being considered for addressing the agency's needs” · 5 citing courts
9
GREENPGBA, LLC v. United States, 60 Fed. Cl. 196 (Fed. Cl. 2004).
cites § 3553 4×cited by 112 cases
Where it cites § 3553
“1200 (July 18, 1984) (codified, as amended, at 31 U.S.C. § 3553 ), an automatic stay of the award was engendered by these protests.”
The case’s holding
Uneven treatment of offerors in a federal procurement process violates the standard of equality and fair-play and constitutes an abuse of agency discretion.
Later courts cite it for
“uneven treatment goes against the standard of equality and fair-play that is a necessary underpinning of the federal government's procurement process and amounts to an abuse of the agency's discretion.” · 14 citing courts
10
GREENPGBA, LLC v. United States, 57 Fed. Cl. 655 (Fed. Cl. 2003).
cites § 3553 4×cited by 111 cases
Where it cites § 3553
“On August 16, 2003, TMA’s Director of Acquisition Management and Support issued a memorandum explaining TMA’s decision to override the CICA automatic stay pursuant to 31 U.S.C. § 3553 (d)(3)(C). In that memorandum, the Director invoked both of the bases listed in section…”
The case’s holding
A lost opportunity to compete constitutes irreparable harm for the purposes of seeking a preliminary injunction.
Later courts cite it for
“this court has acknowledged that a lost opportunity to compete may constitute an irreparable harm.” · 9 citing courts
11
GREENKeeton Corr., Inc. v. United States, 59 Fed. Cl. 753 (Fed. Cl. 2004).
cites § 3553 4×cited by 105 cases
Where it cites § 3553
“Keeton subsequently filed a protest with the General Accounting Office (“GAO”) on June 26, 2003, invoking the automatic stay provided for under the Competition in Contracting Act (“CICA”), 31 U.S.C. § 3553 (d). In response to Keeton’s protest, the BOP decided to take corrective…”
The case’s holding
An agency decision to override an automatic stay is arbitrary and capricious if the agency fails to consider using sole-source purchase orders to meet urgent needs.
Later courts cite it for
“must look to see whether the agency considered the relevant factors and made a rational determination.” · 6 citing courts
12
GREENE-Mgmt. Consultants, Inc. v. United States, 84 Fed. Cl. 1 (Fed. Cl. 2008).
cites § 3553 11×cited by 9 cases
Where it cites § 3553
“§ 3551-56 (2006)), provides for an automatic stay that prevents an agency from proceeding with a protested contract provided that the agency is timely (that is, within ten days after the date of the contract award or five days after the debriefing date, whichever is later, 31…”
13
GREENAlion Sci. & Tech. Corp. v. United States, 69 Fed. Cl. 14 (Fed. Cl. 2005).
cites § 3553 9×cited by 12 cases
Where it cites § 3553
“See 31 U.S.C. § 3553 (2002). During the pendency of that protest, however, DISA exercised an “override” of the stay and authorized continued contract perform-anee by AES.”
14
GREENAdvanced Sys. Dev., Inc. v. United States, 72 Fed. Cl. 25 (Fed. Cl. 2006).
cites § 3553 6×subsections: (d)(3)(A)(ii)cited by 22 cases
Where it cites § 3553
“This case arises out of Plaintiffs bid protest pending at the Government Accountability Office (GAO), and the associated stay in contract performance imposed by the Competition in Contracting Act (CICA), 31 U.S.C. § 3553 . In the present action, Advanced Systems Development, Inc.”
The case’s holding
A best-interests override of the CICA automatic stay cannot rest merely on the claim that the new contract is cheaper or better than the old one; post-hoc justifications cannot cure that defect.
Later courts cite it for
“the automatic stay is intended to preserve the status quo during the pendency of the protest so that an agency would not cavalierly disregard the gao's recommendation to cancel the challenged award.” · 4 citing courts
15
GREENGlobal Comput. Enter., Inc. v. United States, 88 Fed. Cl. 350 (Fed. Cl. 2009).
cites § 3553 4×cited by 46 cases
Where it cites § 3553
“; see also 31 U.S.C. § 3553 (e)(1) (providing that with limited exceptions, “a contract may not be awarded in any procurement after the Federal agency has received notice of a protest with respect to such procurement from the Comptroller General and while the protest is…”
The case’s holding
The jurisdictional bar for bid protests applies to the issuance of a task order but does not extend to modifications of an existing task order.
Later courts cite it for
“although the protest in lbm, inc. concerned the underlying contracts . . ., the court nevertheless finds it instructive" because the protestor "did not challenge the issuance or proposed issuance of a task order under the existing contract.” · 2 citing courts
16
GREENUnisys Corp. v. United States, 90 Fed. Cl. 510 (Fed. Cl. 2009).
cites § 3553 9×cited by 10 cases
Where it cites § 3553
“The protestor asserts that the procurement at issue is within the jurisdiction of GAO and that the procuring agency, the Transportation Security Administration (“TSA”) must either stay performance of the contract until the conclusion of the protest in accord with 31 U.S.C. §…”
17
GREENCarahsoft Tech. Corp. v. United States, 86 Fed. Cl. 325 (Fed. Cl. 2009).
cites § 3553 4×cited by 43 cases
Where it cites § 3553
“GAO issued this order, presumably, to comply with CICA’s automatic stay provision at 31 U.S.C. § 3553 (d)(3)(A)(ii), which requires agencies to “direct the contractor to cease performance under the contract and to suspend any related activities that may result in additional…”
The case’s holding
An agency is not required to spoon-feed offerors to conduct meaningful discussions during a negotiated procurement.
Later courts cite it for
“an agency is not required to 'spoon-feed' offerors in order to have meaningful discussions.” · 3 citing courts
18
GREENGlenn Def. Marine (Asia) v. United States, 720 F.3d 901 (Fed. Cir. 2013).
cites § 3553 2×cited by 219 cases
Where it cites § 3553
“The Navy’s submissions to the GAO were those required by 31 U.S.C. § 3553 (b)(2), and includ- ed an articulation of the agency’s reasoning in response to the protest.”
The case’s holding
Agencies are afforded broad discretion in evaluating past performance provided the agency considers the record in its entirety.
Later courts cite it for
“in a bid protest case, the inquiry is whether the agency's action was arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law and, if so, whether the error is prejudicial.” · 85 citing courts
19
GREENNortel Gov't Solutions, Inc. v. United States, 84 Fed. Cl. 243 (Fed. Cl. 2008).
cites § 3553 7×cited by 11 cases
Where it cites § 3553
“First, plaintiff points out that DEA’s Determinations and Findings (“D & F”), in which defendant justifies its decision to override the stay pursuant to 31 U.S.C. § 3553 (d)(3)(C) (2004), does not address whether and how overriding the stay will remedy the alleged adverse…”
Later courts cite it for
“an agency may override an automatic stay if it notifies the gao in writing that either 'performance of the contract is in the best interests of the united states,' or 'urgent and compelling circumstances that significantly affect interests of the united states will not permit waiting for the decision of the comptroller general concerning the protest.” · 3 citing courts
20
GREENLinc Gov't Servs., LLC v. United States, 96 Fed. Cl. 672 (Fed. Cl. 2010).
cites § 3553 2×cited by 156 cases
The case’s holding
A contracting officer may give unequal weight to different contracts when evaluating past performance based on their relative relevance.
Later courts cite it for
“apply with equal force to the interpretation of government solicitations.” · 3 citing courts

Show all 195 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198420052026

One bar per year. Tallest: 13 cases in 2005. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.145D.D.C.12Fed. Cir.811th Cir.3M.D. Ala.22d Cir.2D.C. Cir.2S.D. Cal.2

The 8 courts with the most citing cases, of 25 courts in all.

By subsection
(c)1 case
Vanquishworldwide, LLC v. United States, No. 17-96 (Fed. Cl. Mar. 6, 2020).
(c)(1)1 case
Bannum, Inc. v. United States, 779 F.3d 1376 (Fed. Cir. 2015).
(d)(3)(A)(ii)2 cases
Advanced Sys. Dev., Inc. v. United States, 72 Fed. Cl. 25 (Fed. Cl. 2006).“This case arises out of Plaintiffs bid protest pending at the Government Accountability Office (GAO), and the associated stay in contract performance imposed by the Competition in Contracting Act (CICA), 31 U.S.C. § 3553 . In the present action, Advanced Systems Development, Inc.”
Active Deployment Sys., LLC v. United States, No. 26-510 (Fed. Cl. Apr. 21, 2026).
(d)(4)(B)1 case
Nika Tech., Inc. v. United States, No. 20-299 (Fed. Cl. Apr. 21, 2020).

Show all 195 citing cases (list view) →

Enactment and amendments
(Added Pub. L. 98–369, div. B, title VII, § 2741(a), July 18, 1984, 98 Stat. 1200; amended Pub. L. 103–355, title I, §§ 1402, 1403(c), Oct. 13, 1994, 108 Stat. 3287, 3290; Pub. L. 104–106, div. D, title XLIII, § 4321(d)(2), div. E, title LV, § 5501(1), Feb. 10, 1996, 110 Stat. 674, 698; Pub. L. 108–375, div. A, title III, § 326(c), Oct. 28, 2004, 118 Stat. 1848; Pub. L. 115–91, div. A, title VIII, § 818(c), Dec. 12, 2017, 131 Stat. 1464; Pub. L. 117–81, div. A, title XVII, § 1702(l)(5), Dec. 27, 2021, 135 Stat. 2160.)