31 U.S.C. § 3554 (2026)

Decisions on protests

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1984–2026 80citing cases
At a glance

Courts have cited this section in 80 opinions since 1984, 4 of them in the last five years. The most litigated part is subsection (b)(1) (1 case).

(a)(1) To the maximum extent practicable, the Comptroller General shall provide for the inexpensive and expeditious resolution of protests under this subchapter. Except as provided under paragraph (2) of this subsection, the Comptroller General shall issue a final decision concerning a protest within 100 days after the date the protest is submitted to the Comptroller General.(2) The Comptroller General shall, by regulation prescribed pursuant to section 3555 of this title, establish an express option for deciding those protests which the Comptroller General determines suitable for resolution within 65 days after the date the protest is submitted.(3) An amendment to a protest that adds a new ground of protest, if timely made, should be resolved, to the maximum extent practicable, within the time limit established under paragraph (1) of this subsection for final decision of the initial protest. If an amended protest cannot be resolved within such time limit, the Comptroller General may resolve the amended protest through the express option under paragraph (2) of this subsection.(4) The Comptroller General may dismiss a protest that the Comptroller General determines is frivolous or which, on its face, does not state a valid basis for protest.(b)(1) With respect to a solicitation for a contract, or a proposed award or the award of a contract, protested under this subchapter, the Comptroller General may determine whether the solicitation, proposed award, or award complies with statute and regulation. If the Comptroller General determines that the solicitation, proposed award, or award does not comply with a statute or regulation, the Comptroller General shall recommend that the Federal agency—(A) refrain from exercising any of its options under the contract;(B) recompete the contract immediately;(C) cancel the solicitation issued pursuant to the public-private competition conducted under Office of Management and Budget Circular A–76 or any successor circular;(D) issue a new solicitation;(E) terminate the contract;(F) award a contract consistent with the requirements of such statute and regulation;(G) implement any combination of recommendations under clauses (A), (B), (C), (D), (E), and (F); or(H) implement such other recommendations as the Comptroller General determines to be necessary in order to promote compliance with procurement statutes and regulations.(2) If the head of the procuring activity responsible for a contract makes a finding under section 3553(d)(3)(C)(i)(I) of this title, the Comptroller General shall make recommendations under this subsection without regard to any cost or disruption from terminating, recompeting, or reawarding the contract.(3) If the Federal agency fails to implement fully the recommendations of the Comptroller General under this subsection with respect to a solicitation for a contract or an award or proposed award of a contract within 60 days after receiving the recommendations, the head of the procuring activity responsible for that contract shall report such failure to the Comptroller General not later than 5 days after the end of such 60-day period.(c)(1) If the Comptroller General determines that a solicitation for a contract or a proposed award or the award of a contract does not comply with a statute or regulation, the Comptroller General may recommend that the Federal agency conducting the procurement pay to an appropriate interested party the costs of—(A) filing and pursuing the protest, including reasonable attorneys’ fees and consultant and expert witness fees; and(B) bid and proposal preparation.(2) No party (other than a small business concern (within the meaning of section 3(a) of the Small Business Act)) may be paid, pursuant to a recommendation made under the authority of paragraph (1)—(A) costs for consultant and expert witness fees that exceed the highest rate of compensation for expert witnesses paid by the Federal Government; or(B) costs for attorneys’ fees that exceed $150 per hour unless the agency determines, based on the recommendation of the Comptroller General on a case by case basis, that an increase in the cost of living or a special factor, such as the limited availability of qualified attorneys for the proceedings involved, justifies a higher fee.(3) If the Comptroller General recommends under paragraph (1) that a Federal agency pay costs to an interested party, the Federal agency shall—(A) pay the costs promptly; or(B) if the Federal agency does not make such payment, promptly report to the Comptroller General the reasons for the failure to follow the Comptroller General’s recommendation.(4) If the Comptroller General recommends under paragraph (1) that a Federal agency pay costs to an interested party, the Federal agency and the interested party shall attempt to reach an agreement on the amount of the costs to be paid. If the Federal agency and the interested party are unable to agree on the amount to be paid, the Comptroller General may, upon the request of the interested party, recommend to the Federal agency the amount of the costs that the Federal agency should pay.(d) Each decision of the Comptroller General under this subchapter shall be signed by the Comptroller General or a designee for that purpose. A copy of the decision shall be made available to the interested parties, the head of the procuring activity responsible for the solicitation, proposed award, or award of the contract, and the senior procurement executive of the Federal agency involved.(e)(1) The Comptroller General shall report promptly to the Committee on Governmental Affairs and the Committee on Appropriations of the Senate and to the Committee on Government Reform and Oversight and the Committee on Appropriations of the House of Representatives any case in which a Federal agency fails to implement fully a recommendation of the Comptroller General under subsection (b) or (c). The report shall include—(A) a comprehensive review of the pertinent procurement, including the circumstances of the failure of the Federal agency to implement a recommendation of the Comptroller General; and(B) a recommendation regarding whether, in order to correct an inequity or to preserve the integrity of the procurement process, the Congress should consider—(i) private relief legislation;(ii) legislative rescission or cancellation of funds;(iii) further investigation by Congress; or(iv) other action.(2) Not later than January 31 of each year, the Comptroller General shall transmit to the Congress a report containing a summary of each instance in which a Federal agency did not fully implement a recommendation of the Comptroller General under subsection (b) or (c) during the preceding year. The report shall also describe each instance in which a final decision in a protest was not rendered within 100 days after the date the protest is submitted to the Comptroller General. The report shall also include a summary of the most prevalent grounds for sustaining protests during such preceding year.(Added Pub. L. 98–369, div. B, title VII, § 2741(a), July 18, 1984, 98 Stat. 1201; amended Pub. L. 100–463, title VIII, § 8139, Oct. 1, 1988, 102 Stat. 2270–47; Pub. L. 103–355, title I, § 1403(a)–(b)(3), Oct. 13, 1994, 108 Stat. 3289, 3290; Pub. L. 104–106, div. D, title XLIII, § 4321(d)(3), div. E, title LV, § 5501(2), Feb. 10, 1996, 110 Stat. 674, 698; Pub. L. 111–84, div. A, title III, § 327(c), Oct. 28, 2009, 123 Stat. 2255; Pub. L. 112–239, div. A, title VIII, § 867, Jan. 2, 2013, 126 Stat. 1862.)Editorial NotesReferences in Text

Section 3(a) of the Small Business Act, referred to in subsec. (c)(2), is classified to section 632(a) of Title 15, Commerce and Trade.

Amendments

2013—Subsec. (e)(2). Pub. L. 112–239 inserted at end “The report shall also include a summary of the most prevalent grounds for sustaining protests during such preceding year.”

2009—Subsec. (b)(1)(C) to (H). Pub. L. 111–84 added subpar. (C), redesignated former subpars. (C) to (G) as (D) to (H), respectively, and substituted “, (E), and (F)” for “, and (E)” in subpar. (G).

1996—Subsec. (a)(1). Pub. L. 104–106, § 5501(2)(A), substituted “100 days” for “125 days”.

Subsec. (b)(2). Pub. L. 104–106, § 4321(d)(3), substituted “section 3553(d)(3)(C)(i)(I)” for “section 3553(d)(2)(A)(i)”.

Subsec. (e)(1). Pub. L. 104–106, § 5501(2)(B)(i), substituted “Government Reform and Oversight” for “Government Operations”.

Subsec. (e)(2). Pub. L. 104–106, § 5501(2)(B)(ii), substituted “100 days” for “125 days”.

1994—Subsec. (a)(1). Pub. L. 103–355, § 1403(a)(1), substituted “125 days after” for “90 working days from”.

Subsec. (a)(2). Pub. L. 103–355, § 1403(a)(2), substituted “65 days after” for “45 calendar days from”.

Subsec. (a)(3), (4). Pub. L. 103–355, § 1403(a)(3), (4), added par. (3) and redesignated former par. (3) as (4).

Subsec. (b)(3). Pub. L. 103–355, § 1403(b)(1), added par. (3).

Subsec. (c). Pub. L. 103–355, § 1403(b)(2), amended subsec. (c) generally. Prior to amendment, subsec. (c) read as follows:

“(c)(1) If the Comptroller General determines that a solicitation for a contract or a proposed award or the award of a contract does not comply with a statute or regulation, the Comptroller General may declare an appropriate interested party to be entitled to the costs of—

“(A) filing and pursuing the protest, including reasonable attorneys’ fees; and

“(B) bid and proposal preparation.

“(2) Monetary awards to which a party is declared to be entitled under paragraph (1) of this subsection shall be paid promptly by the Federal agency concerned out of funds available to or for the use of the Federal agency for the procurement of property and services.”

Subsec. (e). Pub. L. 103–355, § 1403(b)(3), amended subsec. (e) generally. Prior to amendment, subsec. (e) read as follows:

“(e)(1) The head of the procuring activity responsible for the solicitation, proposed award, or award of the contract shall report to the Comptroller General, if the Federal agency has not fully implemented those recommendations within 60 days of receipt of the Comptroller General’s recommendations under subsection (b) of this section.

“(2) Not later than January 31 of each year, the Comptroller General shall transmit to Congress a report describing each instance in which a Federal agency did not fully implement the Comptroller General’s recommendations during the preceding fiscal year.”

1988—Subsec. (a)(1). Pub. L. 100–463 struck out “unless the Comptroller General determines and states in writing the reasons that the specific circumstances of the protest require a longer period” after “submitted to the Comptroller General” before period at end.

Statutory Notes and Related SubsidiariesChange of Name

Committee on Governmental Affairs of Senate changed to Committee on Homeland Security and Governmental Affairs of Senate, effective Jan. 4, 2005, by Senate Resolution No. 445, One Hundred Eighth Congress, Oct. 9, 2004.

Committee on Government Reform and Oversight of House of Representatives changed to Committee on Government Reform of House of Representatives by House Resolution No. 5, One Hundred Sixth Congress, Jan. 6, 1999. Committee on Government Reform of House of Representatives changed to Committee on Oversight and Government Reform of House of Representatives by House Resolution No. 6, One Hundred Tenth Congress, Jan. 5, 2007. Committee on Oversight and Government Reform of House of Representatives changed to Committee on Oversight and Reform of House of Representatives by House Resolution No. 6, One Hundred Sixteenth Congress, Jan. 9, 2019. Committee on Oversight and Reform of House of Representatives changed to Committee on Oversight and Accountability of House of Representatives by House Resolution No. 5, One Hundred Eighteenth Congress, Jan. 9, 2023.

Effective Date of 2009 Amendment

Amendment by Pub. L. 111–84 applicable to any protest or civil action that relates to a public-private competition conducted after Oct. 28, 2009, under Office of Management and Budget Circular A–76, or any successor circular, and to a decision made after Oct. 28, 2009, to convert a function performed by Federal employees to private sector performance without a competition under Office of Management and Budget Circular A–76, see section 327(d) of Pub. L. 111–84, set out as a note under section 3551 of this title.

Effective Date of 1996 Amendment

For effective date and applicability of amendment by section 4321(d)(3) of Pub. L. 104–106, see section 4401 of Pub. L. 104–106, set out as a note under section 2220 of Title 10, Armed Forces.

Amendment by section 5501(2) of Pub. L. 104–106 effective 180 days after Feb. 10, 1996, see section 5701 of Pub. L. 104–106, div. E, title LVII, Feb. 10, 1996, 110 Stat. 702.

Effective Date of 1994 Amendment

For effective date and applicability of amendment by Pub. L. 103–355, see section 10001 of Pub. L. 103–355, set out as a note under section 8752 of Title 10, Armed Forces.

Effective Date

Section applicable with respect to any protest filed after Jan. 14, 1985, see section 2751(b) of Pub. L. 98–369, set out as a note under section 4751 of Title 10, Armed Forces.

Inclusion of Information on Common Grounds for Sustaining Bid Protests in Annual Government Accountability Office Reports to Congress

Pub. L. 114–328, div. A, title VIII, § 889, Dec. 23, 2016, 130 Stat. 2323, provided that: “The Comptroller General of the United States shall include in the annual report to Congress on the Government Accountability Office each year a list of the most common grounds for sustaining protests relating to bids for contracts during such year.”

Prompt Payment of Costs Under Prior Law

Pub. L. 103–355, title I, § 1403(b)(4), Oct. 13, 1994, 108 Stat. 3290, provided that: “Costs to which the Comptroller General declared an interested party to be entitled under section 3554 of title 31, United States Code, as in effect immediately before the enactment of this Act [Oct. 13, 1994], shall, if not paid or otherwise satisfied by the Federal agency concerned before the date of the enactment of this Act, be paid promptly.”

The 20 cases that cite 31 U.S.C. § 3554 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENGisbrecht v. Barnhart, 535 U.S. 789 (2002).
cites § 3554 2×cited by 4,268 cases
Where it cites § 3554
“[12] See also Servicemembers' Group Life Insurance Act, 38 U. S. C. § 1984 (g) (1994 ed.”
The case’s holding
An award under the Equal Access to Justice Act offsets an award for reasonable attorney fees under Section 406(b).
Later courts cite it for
“the character of the representation and the results the representative achieved;” · 649 citing courts
2
GREENHoneywell, Inc. v. The United States v. Haz-Tad, Inc., 870 F.2d 644 (Fed. Cir. 1989).
cites § 3554 5×cited by 428 cases
Where it cites § 3554
“Decisions of the GAO are merely “recommendations,” 31 U.S. C. § 3554 (1982), and not binding on this court.”
The case’s holding
A court should defer to agency action if a reasonable basis for the action exists, even if the court might have reached a different conclusion independently.
Later courts cite it for
“in these circumstances, a procurement agency's decision to follow the comptroller general's recommendation, even though that recommendation differed from the contracting officer's initial decision, was proper unless the comptroller general's decision itself was irrational.” · 4 citing courts
3
GREENPGBA, LLC v. United States, 57 Fed. Cl. 655 (Fed. Cl. 2003).
cites § 3554 2×cited by 111 cases
The case’s holding
A lost opportunity to compete constitutes irreparable harm for the purposes of seeking a preliminary injunction.
Later courts cite it for
“this court has acknowledged that a lost opportunity to compete may constitute an irreparable harm.” · 9 citing courts
4
GREENCentech Grp., Inc. v. United States, 78 Fed. Cl. 496 (Fed. Cl. 2007).
cites § 3554 3×cited by 30 cases
Where it cites § 3554
“If a protest is sustained, CICA permits GAO to recommend an appropriate remedy “to promote compliance with procurement statutes and regulations,” which may include ordering a new solicitation, terminating the contract, limiting the existing contract to bring it into compliance…”
The case’s holding
A procuring agency's corrective action taken in response to a bid protest is subject to judicial review for reasonableness.
Later courts cite it for
“different controversies than those which may arise from the new evaluation and award in the post-award landscape.” · 2 citing courts
5
GREENSupreme Foodservice GmbH v. United States, 109 Fed. Cl. 369 (Fed. Cl. 2013).
cites § 3554 2×cited by 63 cases
The case’s holding
An agency decision to override a statutory stay is arbitrary and capricious if the agency fails to consider relevant factors or provides an explanation contrary to the evidence.
Later courts cite it for
“a motion for judgment on the administrative record examines whether the administrative body, given all the disputed and undisputed facts appearing in the record, acted in a manner that complied with the legal standards governing the decision under review.” · 4 citing courts
6
GREENCentech Grp., Inc. v. United States, 554 F.3d 1029 (Fed. Cir. 2009).
cites § 3554 1×cited by 421 cases
Where it cites § 3554
“Pursuant to 31 U.S.C. § 3554 (b)(1), GAO is required to recommend that an agency take specific corrective action if an award does not comply with a statute or regulation, including terminating the contract and awarding a contract consistent with the requirements of the statute…”
The case’s holding
A proposal is technically unacceptable if it fails to offer what is required by the solicitation regarding material subcontracting limitations.
Later courts cite it for
“the balance of hardships to the respective parties favors the grant of injunctive relief, and the public interest is served by a grant of injunctive relief.” · 76 citing courts
7
GREENDelta Data Sys. Corp. v. William H. Webster, 744 F.2d 197 (D.C. Cir. 1984).
cites § 3554 2×cited by 153 cases
Where it cites § 3554
“494 , 1201 (to be codified at 31 U.S.C. § 3554 (b)). It provides as a sanction for agency failure to accept such recommendations only that the Comptroller General shall report such failure to Congress in an annual report, id.”
The case’s holding
A court may not order a contract award unless it is clear that the illegal agency behavior would have resulted in the contract being awarded to the requesting party.
Later courts cite it for
“unless it is clear that, but for the illegal behavior of the agency, the contract would have been awarded to the party asking the court to order the award.” · 10 citing courts
8
GREENIMS Servs., Inc. v. United States, 33 Fed. Cl. 167 (Fed. Cl. 1995).
cites § 3554 5×cited by 19 cases
Where it cites § 3554
“The Comptroller General is empowered to determine whether the solicitation, proposed award, or award complies with statute and regulation, 31 U.S.C. § 3554 (b)(1). If the Comptroller General determines that it does not so comply, he shall recommend that the agency take specific…”
9
GREENImpresa Construzioni Geom. Domenico Garufi v. United States, 100 Fed. Cl. 750 (Fed. Cl. 2011).
cites § 3554 3×cited by 16 cases
Where it cites § 3554
“Attorney's fees and expenses incurred in protests before GAO maybe recoverable under 31 U.S.C. § 3554 (c)(1) (2006). That statute permits the Comptroller General to recommend that the federal agency conducting the protested procurement pay certain fees and expenses to an…”
10
GREENKeeton Corr., Inc. v. United States, 59 Fed. Cl. 753 (Fed. Cl. 2004).
cites § 3554 1×cited by 105 cases
Where it cites § 3554
“31 U.S.C. § 3554 (a)(1) (2004) provides: “Except as provided for under paragraph (2) of this subsection, the Comptroller General shall issue a final decision concerning a protest within 100 days after the date the protest is submitted to the Comptroller General.”
The case’s holding
An agency decision to override an automatic stay is arbitrary and capricious if the agency fails to consider using sole-source purchase orders to meet urgent needs.
Later courts cite it for
“must look to see whether the agency considered the relevant factors and made a rational determination.” · 6 citing courts
11
GREENShoals Am. Indus., Inc. v. United States, 877 F.2d 883 (11th Cir. 1989).
cites § 3554 3×cited by 22 cases
Where it cites § 3554
“31 U.S.C. § 3554 (e)(1). Although the Comptroller General may not insist that the agency comply with his recommendations, he may award a prevailing protester its bid-preparation costs, as well as attorneys’ *887 fees and costs incurred in pursuing the protest.”
Later courts cite it for
“achieving certainty in the bidding process is well worth the 480,000 it will cost in this case.” · 2 citing courts
12
GREENCBY Design Builders v. United States, 105 Fed. Cl. 303 (Fed. Cl. 2012).
cites § 3554 1×cited by 85 cases
The case’s holding
The level of deference applied under the arbitrary and capricious standard of review remains unchanged when an agency implements a recommendation from the Government Accountability Office.
Later courts cite it for
“since the amount of deference given to an agency decision under the 'arbitrary and capricious' standard of review does not change when gao denies a protest of the decision, or when gao sustains a protest but its recommendation is not followed, it is hard to see how this deference would be altered by an agency's decision to follow a gao recommendation.” · 1 citing court
13
GREENPark Tower Mgmt., Ltd. v. United States, 67 Fed. Cl. 548 (Fed. Cl. 2005).
cites § 3554 2×cited by 17 cases
Where it cites § 3554
“at 2127 ; see also 31 U.S.C. § 3554 (b)(1). 17 On March 22, 2005, the GAO denied Park Tower’s protest.”
14
GREENCigna Gov't Servs., LLC v. United States, 70 Fed. Cl. 100 (Fed. Cl. 2006).
cites § 3554 2×cited by 16 cases
Summary
No passage or summary on file for this case yet.
15
GREENJacobs Tech. Inc. v. United States, 100 Fed. Cl. 186 (Fed. Cl. 2011).
cites § 3554 2×cited by 16 cases
Where it cites § 3554
“31 U.S.C. § 3554 (b)(1). GAO decisions are only recommendations and not binding on the agency.”
Later courts cite it for
“contracting officers are entitled to broad discretion in the procurement process . . . including in their decisions to take corrective action.” · 3 citing courts
16
GREENS.K.J. & Assocs., Inc. v. United States, 67 Fed. Cl. 218 (Fed. Cl. 2005).
cites § 3554 2×cited by 15 cases
Where it cites § 3554
“allow it to act as a reviewing authority over GAO decisions made pursuant to GAO’s bid protest authority, 31 U.S.C. § 3554 .” Def.’s Mot. to Dismiss at 6.”
17
NO FLAGAllied Tech. Grp., Inc. v. United States, 649 F.3d 1320 (Fed. Cir. 2011).
cites § 3554 2×cited by 138 cases
Where it cites § 3554
“1989) (citing 31 U.S.C. § 3554 (b)(1)), and this court may draw on GAO's opinions for its application of this expertise.”
18
GREENSys. Application & Tech., Inc. v. United States, 100 Fed. Cl. 687 (Fed. Cl. 2011).
cites § 3554 1×cited by 53 cases
Where it cites § 3554
“While the GAO is charged with determining whether a procuring agency has violated a statute or regulation, 31 U.S.C. § 3554 (b)(1); 4 C.F.R. § 21.8 (a), the Court of Federal Claims must determine whether the agency's action was arbitrary, capricious, an abuse of discretion, or…”
The case’s holding
The jurisdictional grant of 28 U.S.C. § 1491(b)(1) applies to the entire procurement process, including challenges to a procuring agency's proposed corrective action.
Later courts cite it for
“lose a valuable contract that it has lawfully won.” · 2 citing courts
cites § 3554 2×cited by 31 cases
Where it cites § 3554
“31 U.S.C. § 3554 (a)(1) & (2) (Supp. IV 1986); 4 C.”
The case’s holding
A court lacks jurisdiction to review a board decision regarding a bid protest because a protest does not constitute a contested case requiring a trial-type hearing.
Later courts cite it for
“customarily, complaints about the solicitation and award of contracts. . . must be quickly asserted and expeditiously resolved so that the contract can be awarded and the job begun.” · 2 citing courts
20
GREENSra Int'l, Inc. v. United States, 114 Fed. Cl. 247 (Fed. Cl. 2014).
cites § 3554 3×cited by 7 cases
Where it cites § 3554
“30 (citing 31 U.S.C. § 3554 (b)-(e)). 13 In this case, “GAO offers no meaningful remedy.”

Show all 80 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198420052026

One bar per year. Tallest: 6 cases in 1995. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Fed. Cl.40Fed. Cir.5D.D.C.5M.D. Ala.4Ct. Cl.3OLC33rd Cir.29th Cir.2

The 8 courts with the most citing cases, of 23 courts in all.

By subsection
(b)(1)1 case
Mark Dunning Indus., Inc. v. Cheney, 726 F. Supp. 810 (M.D. Ala. 1989).

Show all 80 citing cases (list view) →

Enactment and amendments
(Added Pub. L. 98–369, div. B, title VII, § 2741(a), July 18, 1984, 98 Stat. 1201; amended Pub. L. 100–463, title VIII, § 8139, Oct. 1, 1988, 102 Stat. 2270–47; Pub. L. 103–355, title I, § 1403(a)–(b)(3), Oct. 13, 1994, 108 Stat. 3289, 3290; Pub. L. 104–106, div. D, title XLIII, § 4321(d)(3), div. E, title LV, § 5501(2), Feb. 10, 1996, 110 Stat. 674, 698; Pub. L. 111–84, div. A, title III, § 327(c), Oct. 28, 2009, 123 Stat. 2255; Pub. L. 112–239, div. A, title VIII, § 867, Jan. 2, 2013, 126 Stat. 1862.)
Amendment years (notes): 2013, 2009, 1996, 1994, 1988
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.