Skip to main content
U.S. CodeTitle 42Chapter 23— Development and Control of Atomic EnergyDivision A— Atomic EnergySubchapter XV— Judicial Review and Administrative Procedure

42 U.S.C. § 2232 (2026)

License applications

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1960–2016 45citing cases
At a glance

Courts have cited this section in 45 opinions since 1960.

(a) Contents and form

Each application for a license hereunder shall be in writing and shall specifically state such information as the Commission, by rule or regulation, may determine to be necessary to decide such of the technical and financial qualifications of the applicant, the character of the applicant, the citizenship of the applicant, or any other qualifications of the applicant as the Commission may deem appropriate for the license. In connection with applications for licenses to operate production or utilization facilities, the applicant shall state such technical specifications, including information of the amount, kind, and source of special nuclear material required, the place of the use, the specific characteristics of the facility, and such other information as the Commission may, by rule or regulation, deem necessary in order to enable it to find that the utilization or production of special nuclear material will be in accord with the common defense and security and will provide adequate protection to the health and safety of the public. Such technical specifications shall be a part of any license issued. The Commission may at any time after the filing of the original application, and before the expiration of the license, require further written statements in order to enable the Commission to determine whether the application should be granted or denied or whether a license should be modified or revoked. All applications and statements shall be signed by the applicant or licensee. Applications for, and statements made in connection with, licenses under sections 2133 and 2134 of this title shall be made under oath or affirmation. The Commission may require any other applications or statements to be made under oath or affirmation.

(b) Review of applications by Advisory Committee on Reactor Safeguards; report

The Advisory Committee on Reactor Safeguards shall review each application under section 2133 or section 2134(b) of this title for a construction permit or an operating license for a facility, any application under section 2134(c) of this title for a construction permit or an operating license for a testing facility, any application under subsection (a) or (c) of section 2134 of this title specifically referred to it by the Commission, and any application for an amendment to a construction permit or an amendment to an operating license under section 2133 or 2134(a), (b), or (c) of this title specifically referred to it by the Commission, and shall submit a report thereon which shall be made part of the record of the application and available to the public except to the extent that security classification prevents disclosure.

(c) Commercial power; publication

The Commission shall not issue any license under section 2133 of this title for a utilization or production facility for the generation of commercial power until it has given notice in writing to such regulatory agency as may have jurisdiction over the rates and services incident to the proposed activity; until it has published notice of the application in such trade or news publications as the Commission deems appropriate to give reasonable notice to municipalities, private utilities, public bodies, and cooperatives which might have a potential interest in such utilization or production facility; and until it has published notice of such application once each week for four consecutive weeks in the Federal Register, and until four weeks after the last notice.

(d) Preferred consideration

The Commission, in issuing any license for a utilization or production facility for the generation of commercial power under section 2133 of this title, shall give preferred consideration to applications for such facilities which will be located in high cost power areas in the United States if there are conflicting applications for a limited opportunity for such license. Where such conflicting applications resulting from limited opportunity for such license include those submitted by public or cooperative bodies such applications shall be given preferred consideration.

(Aug. 1, 1946, ch. 724, title I, § 182, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 953; amended Aug. 6, 1956, ch. 1015, § 5, 70 Stat. 1069; Pub. L. 85–256, § 6, Sept. 2, 1957, 71 Stat. 579; Pub. L. 87–615, § 3, Aug. 29, 1962, 76 Stat. 409; Pub. L. 91–560, § 9, Dec. 19, 1970, 84 Stat. 1474; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.)Editorial NotesAmendments

1970—Subsec. (c). Pub. L. 91–560 substituted provisions requiring notification by publication giving reasonable notice to municipalities, private utilities, public bodies, and cooperatives which might have a potential interest in such utilization or production facility, for provisions requiring notice in writing to municipalities, private utilities, public bodies and cooperatives within transmission distance authorized to engage in the distribution of electric energy.

1962—Subsec. (b). Pub. L. 87–615 substituted provisions requiring review of applications under section 2133 or 2134(b) of this title for a construction permit or an operating license for a facility, or under section 2134(c) of this title for a testing facility, for provisions which required review of license applications for such facilities, and inserted provisions requiring review of any application for an amendment to a construction permit or operating license under section 2133 or 2134(a), (b), or (c) of this title specifically referred to it by the Commission.

1957—Subsecs. (b) to (d). Pub. L. 85–256 added subsec. (b) and redesignated former subsecs. (b) and (c) as (c) and (d), respectively.

1956—Subsec. (a). Act Aug. 6, 1956, struck out “under oath or affirmation” from last sentence, and inserted two sentences at end requiring applications and statements in connection with sections 2133 and 2134 to be made under oath or affirmation and authorizing Commission to require any other applications or statements to be made under oath or affirmation.

Statutory Notes and Related SubsidiariesTermination of Advisory Committees

Advisory committees in existence on Jan. 5, 1973, to terminate not later than the expiration of the 2-year period following Jan. 5, 1973, unless, in the case of a committee established by the President or an officer of the Federal Government, such committee is renewed by appropriate action prior to the expiration of such 2-year period, or in the case of a committee established by the Congress, its duration is otherwise provided by law. See section 1013 of Title 5, Government Organization and Employees.

The 20 cases that cite 42 U.S.C. § 2232 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 2232 1×cited by 2,316 cases
The case’s holding
Administrative agencies may fashion their own rules of procedure absent constitutional constraints or extremely compelling circumstances.
Later courts cite it for
“absent constitutional constraints or extremely compelling circumstances the administrative agencies should be free to fashion their own rules of procedure and to pursue methods of inquiry capable of permitting them to discharge their multitudinous duties.” · 68 citing courts
cites § 2232 2×cited by 440 cases
Where it cites § 2232
“The second step of the procedure, the application for and granting of an operating license, is governed by § 182a, 42 U. S. C. § 2232 (a). That provision reads, in pertinent part: "In connection with applications for licenses to operate production or utilization facilities, the…”
The case’s holding
Courts accord respect to an administrative agency's interpretation of its own regulations and governing statutes.
Later courts cite it for
“particularly is this respect due when the administrative practice at stake 'involves a contemporaneous construction of a statute by the men charged with the responsibility of setting its machinery in motion; of making the parts work efficiently and smoothly while they are yet untried and new.” · 53 citing courts
cites § 2232 4×cited by 56 cases
Where it cites § 2232
“” Section 182, 42 U.S.C. § 2232 (a). The application was reviewed by the Staff, and by the ACRS, whose report was not made public.”
The case’s holding
An agency's failure to follow its own regulations is fatal to the deviant action, but procedural directives that are not binding regulations do not trigger this rule.
Later courts cite it for
“(a)n amendment can be made without opportunity for a hearing if the aec determines that it 'involves no significant hazards consideration.” · 4 citing courts
4
GREENSafe Extensions, Inc. v. Fed. Aviation Admin., 509 F.3d 593 (D.C. Cir. 2007).
cites § 2232 1×cited by 90 cases
Where it cites § 2232
“1987) (reviewing whether regulations “provide[d] adequate protection to the health and safety of the public” under 42 U.S.C. § 2232 (a)). This conclusion finds support in the APA’s “strong presumption of reviewability.”
The case’s holding
An agency disposition is a reviewable order if it determines rights or obligations or gives rise to legal consequences.
Later courts cite it for
“only that its 'interest is arguably one regulated or protected by the statutory provision at issue.” · 6 citing courts
5
GREENFriedman v. Fed. Aviation Admin., 841 F.3d 537 (D.C. Cir. 2016).
cites § 2232 1×cited by 25 cases
Where it cites § 2232
“To justify this decision, the FAA points to the Expert Panel’s letter in support of Friedman’s application, which acknowledged “CGM systems have value” and are “most useful in identifying trends and the direction and speed at which a person’s blood sugar may be changing.”
The case’s holding
A vague prospect of reconsideration does not defeat a finding of agency action finality.
Later courts cite it for
“not whether there are further administrative proceedings available, but rather 'whether the impact of the order is sufficiently” · 5 citing courts
cites § 2232 1×cited by 248 cases
Where it cites § 2232
“42 U.S.C. § 2232 (a). The Commission therefore had to approve the release of these set- *293 aside funds in order to finance YAEC’s CRP activities.”
The case’s holding
An agency must provide a reasoned explanation when significantly departing from its own precedent to avoid being arbitrary and capricious.
Later courts cite it for
“it is not sufficient for a party to mention a possible argument in the most skeletal way, leaving the court to ... put flesh on its bones.” · 12 citing courts
7
GREENPub. Citizen v. Nuclear Regulatory Comm'n, 573 F.3d 916 (9th Cir. 2009).
cites § 2232 2×cited by 13 cases
Where it cites § 2232
“" 42 U.S.C. § 2232 (a). Although "adequate protection" is not defined in the statute, legislative history "indicate[s] that the Congressional concern with the common defense and security related to such matters as the safeguarding of special nuclear material; the absence of…”
8
GREENApplication of Portland Gen. Elec. Co., 561 P.2d 154 (Or. 1977).
cites § 2232 1×cited by 119 cases
Where it cites § 2232
“" 42 U.S.C. § 2232 . [13] PGE defends this as only incorporating the existing federal standards rather than delegating future rulemaking to NRC.”
The case’s holding
An agency may set its own standards to refine statutory policies when the authorizing statute expressly directs it to do so (by agency discretion).
Later courts cite it for
“the requirement that a party must have objected before the agency to errors he asserts on judicial review is one facet of the general doctrine that a party must exhaust his administrative remedies.” · 5 citing courts
cites § 2232 1×cited by 31 cases
Where it cites § 2232
“” 42 U.S.C. § 2232 (a). The Commission’s regulations require the applicant to provide “[information sufficient to demonstrate to the Commission the financial qualifications of the applicant to carry out, in accordance with the regulations .”
The case’s holding
An agency decision regarding the replacement of a presiding hearing officer is upheld when credibility determinations rely on logical analysis and the record rather than demeanor.
Later courts cite it for
“a function of logical analysis, credentials, data base, and other factors readily discernible to one who reads the record.” · 3 citing courts
cites § 2232 1×cited by 27 cases
Where it cites § 2232
“§ 2201 (b), must require submissions from licensees to assure safety, 42 U.S.C. § 2232 ; and conduct hearings on license applications.”
Later courts cite it for
“a case is rendered moot when events so unfold as to preclude the possibility of meaningful relief.” · 3 citing courts
cites § 2232 2×cited by 8 cases
Where it cites § 2232
“” 42 U.S.C. § 2232 (a) (1970). If issuance would be “inimical” to the health and safety of the public, a license must be denied.”
12
GREENIn re Pub. Serv. Co. of New Hampshire, 88 B.R. 521 (Bankr. D.N.H. 1988).
cites § 2232 1×cited by 26 cases
Where it cites § 2232
“] particularly Sections 182 and 184 [ 42 U.S.C. §§ 2232 , 2234 respectively]. One eighty-two among other things requires that we pass upon the financial qualifications of a utility that applies for a license from us.”
13
cites § 2232 2×cited by 20 cases
Where it cites § 2232
“42 U.S.C. §§ 2232 , 2235. Section 2232 provides in relevant part: “License applications.”
Later courts cite it for
“the two statutes and the regulations promulgated under each must be viewed in para (sic) materia.” · 2 citing courts
cites § 2232 1×cited by 85 cases
Where it cites § 2232
“42 U.S.C. § 2232 , along with related safety and environmental regulations, requires applicants to submit detailed environmental information concerning the proposed site prior to issuance of a construction permit.”
The case’s holding
Direct appellate review is precluded when petitioners fail to participate in administrative proceedings and thus fail to develop a record regarding their proposed regulatory alternatives.
Later courts cite it for
“the 'party' status requirement operates to preclude direct appellate court review without a record which at least has resulted from the fact-finders focus on the alternative regulatory provisions which petitioners propose.” · 3 citing courts
15
cites § 2232 1×cited by 17 cases
Reversed by the U.S. Supreme Court in this case: Vermont Yankee Nuclear Power Corp. v. Natural Resources Defense Council, Inc. (1978).
Where it cites § 2232
“Pursuant to 42 U.S.C. § 2232 (b), each application for a construction permit or operating license for a commercial nuclear power generating facility must be reviewed by ACRS and a report “made .”
Later courts cite it for
“if an intervenor's comments on the draft environmental statement raise a 'colorable alternative not presently considered therein' in a manner which brings 'sufficient attention to the issue to stimulate the commission's consideration of it', the commission must 'undertake its own preliminary investigation of the proffered alternative sufficient to reach a rational judgment whether it is worthy of detailed consideration in the' final environmental statement.” · 2 citing courts
cites § 2232 1×cited by 8 cases
Where it cites § 2232
“The AEA 3 requires the NRC to provide “adequate protection” for the health and safety of the public, 42 U.S.C. § 2232 (a), which the NRC seeks to ensure on an ongoing basis through an “evolving set of requirements and commitments for a specific plant that are modified as…”
Later courts cite it for
“arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.” · 2 citing courts
17
GREENRiverkeeper, Inc. v. Collins, 359 F.3d 156 (2d Cir. 2004).
cites § 2232 2×cited by 9 cases
Where it cites § 2232
“” 42 U.S.C. § 2232 (a). The statute grants the NRC the power to: [Establish by rule, regulation, or order, such standards and instructions to govern the possession and use of special nuclear material, source material, and byproduct material as the Commission may deem necessary…”
Later courts cite it for
“faa and department of defense have acted more than once to protect airspace above nuclear power plants from what were thought to be credible threats against specific sites.” · 2 citing courts
18
GREENUnited States v. City of New York, 463 F. Supp. 604 (S.D.N.Y. 1978).
cites § 2232 1×cited by 9 cases
Where it cites § 2232
“42 U.S.C. § 2232 (a). Moreover, no nuclear reactor will be licensed by the Commission unless it determines that, among other things, the proposed facility can be constructed and operated “at the proposed location without undue risk to the health and safety of the public.”
Later courts cite it for
“radiological regulation of the operation of nuclear reactors” · 2 citing courts
19
GREENNader v. Nuclear Regulatory Comm'n, 513 F.2d 1045 (D.C. Cir. 1975).
cites § 2232 1×cited by 22 cases
Where it cites § 2232
“Atomic Energy Act § 182(a), 42 U.S.C. § 2232 (a) (1970). . See Power Reactor Dev.”
The case’s holding
Parties who refrain from participating in agency rulemaking proceedings are precluded from seeking direct judicial review of the resulting regulations.
Later courts cite it for
“those who refrain from participation in rulemaking proceedings may not obtain direct judicial review of the regulations resulting” · 4 citing courts
cites § 2232 1×cited by 50 cases
Where it cites § 2232
“42 U.S.C. § 2232 (a) (1982). B. The National Environmental Policy Act The National Environmental Policy Act of 1969, 42 U.”

Show all 45 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196019882016

One bar per year. Tallest: 5 cases in 1978. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.199th Cir.41st Cir.32d Cir.33rd Cir.2N.D. Ill.2S.D.N.Y.2D.R.I.2

The 8 courts with the most citing cases, of 15 courts in all.

By subsection

Courts have not cited this section by subsection, so its cases are not split up here. The Leading cases tab lists the cases that cite it most heavily.

Show all 45 citing cases (list view) →

Enactment and amendments
(Aug. 1, 1946, ch. 724, title I, § 182, as added Aug. 30, 1954, ch. 1073, § 1, 68 Stat. 953; amended Aug. 6, 1956, ch. 1015, § 5, 70 Stat. 1069; Pub. L. 85–256, § 6, Sept. 2, 1957, 71 Stat. 579; Pub. L. 87–615, § 3, Aug. 29, 1962, 76 Stat. 409; Pub. L. 91–560, § 9, Dec. 19, 1970, 84 Stat. 1474; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8), Oct. 24, 1992, 106 Stat. 2944.)
Amendment years (notes): 1970, 1962, 1957, 1956
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.