42 U.S.C. § 7475 (2026)
Preconstruction requirements
Edition and currency
Other sources
Courts have cited this section in 202 opinions since 1978, 18 of them in the last five years. The most litigated part is subsection (a) (1 case).
The demonstration pertaining to maximum allowable increases required under subsection (a)(3) shall not apply to maximum allowable increases for class II areas in the case of an expansion or modification of a major emitting facility which is in existence on
Any completed permit application under section 7410 of this title for a major emitting facility in any area to which this part applies shall be granted or denied not later than one year after the date of filing of such completed application.
| Maximum allowable increase (in micrograms per cubic meter) |
|---|---|
Particulate matter: | |
Annual geometric mean | 19 |
Twenty-four-hour maximum | 37 |
Sulfur dioxide: | |
Annual arithmetic mean | 20 |
Twenty-four-hour maximum | 91 |
Three-hour maximum | 325 |
MAXIMUM ALLOWABLE INCREASE | ||
|---|---|---|
(In micrograms per cubic meter) | ||
Period of exposure | Low terrain areas | High terrain areas |
24-hr maximum | 36 | 62 |
3-hr maximum | 130 | 221 |
1977—Subsec. (a)(1). Pub. L. 95–190, § 14(a)(44), substituted “part;” for “part:”.
Subsec. (a)(3). Pub. L. 95–190, § 14(a)(45), inserted provision making applicable requirement of section 7410(j) of this title.
Subsec. (b). Pub. L. 95–190, § 14(a)(46), inserted “cause or” before “contribute” and struck out “actual” before “allowable emissions”.
Subsec. (d)(2)(C). Pub. L. 95–190, § 14(a)(47)–(49), in cl. (ii) substituted “contribute” for “contrbute”, in cl. (iii) substituted “quality-related” for “quality related” and “concentrations which” for “concentrations, which”, and in cl. (iv) substituted “such facility” for “such sources” and “will not cause or contribute to concentrations of such pollutant which exceed” for “together with all other sources, will not exceed”.
Subsec. (d)(2)(D). Pub. L. 95–190, § 14(a)(50), (51), in cl. (iii) substituted provisions relating to determinations of amounts of emissions of sulfur oxides from facilities, for provisions relating to determinations of amounts of emissions of sulfur oxides from sources operating under permits issued pursuant to this subpar., together with all other sources, and added cl. (iv).
- Where it cites § 7475
- “735 , and amended, 42 U.S.C. § 7475 (a)(4). BACT, as defined in the CAA, means, for any major air pollutant emitting facility, "an emission limitation based on the maximum degree of [pollutant] reduction .”
- The case’s holding
- Courts must apply the arbitrary and capricious standard of review under the APA when a statute does not specify a particular standard for reviewing agency action.
- Later courts cite it for
- “even when an agency explains its decision with less than ideal clarity, a reviewing court will not upset the decision on that account if the agency's path may reasonably be discerned.” · 104 citing courts
- The case’s holding
- A claim for civil penalties accrues when the unpermitted modification begins, and the statute of limitations does not reset on each day of continuing conduct.
- Later courts cite it for
- “we generally do not consider arguments raised for the first time in a reply brief.” · 11 citing courts
- Where it cites § 7475
- “Under 42 U.S.C. § 7475 (a), no major emitting facilities 9 on which construction 10 *654 is commenced after August 7, 1977, may be constructed unless the preconstruction requirements of 42 U.”
- The case’s holding
- A Clean Air Act preconstruction permit violation is singular and occurs at construction, so it is not a continuing violation and limitations runs from construction, not operation.
- Later courts cite it for
- “the state's position, taken to its logical end, suggests a de facto elimination of any statute of limitation, for the limitation period would never begin to accrue as long as the facility remained in operation.” · 2 citing courts
- The case’s holding
- Courts should be reluctant to interpret statutory terms in a manner that mandates pointless expenditures of effort.
- Later courts cite it for
- “inherent in most statutory schemes, to overlook circumstances that in context may fairly be considered de minimis.” · 10 citing courts
- The case’s holding
- An association has standing if its members demonstrate a cognizable injury, the interests protected are germane to the organization's purpose, and the requested relief avoids individual participation.
- Later courts cite it for
- “a personal interest in a court's decision and that he or she personally suffers some actual or threatened injury as a result of the challenged conduct.” · 6 citing courts
- Where it cites § 7475
- “” See 42 U.S.C. §§ 7475 ; 7479(1). All other stationary sources are subject to PSD permitting if they have the potential to emit over 250 tpy of “any air pollutant.”
- The case’s holding
- A party may not assert an entirely new injury or theory of standing in a reply brief to establish Article III jurisdiction.
- Later courts cite it for
- “we do not determine the convincing force of evidence, nor the conclusion it should support, but only whether the conclusion reached by epa is supported by substantial evidence when considered on the record as a whole.” · 3 citing courts
- The case’s holding
- An agency may use its rulemaking authority to implement a reasonable compromise when statutory provisions are irreconcilably inconsistent.
- Later courts cite it for
- “reminds' affected parties of existing duties.” · 5 citing courts
- Where it cites § 7475
- “” CAA § 165(a)(4), 42 U.S.C. § 7475 (a)(4). Part C also provides that EPA “shall .”
- Later courts cite it for
- “to establish article iii standing, a petitioner must demonstrate it has suffered a concrete and particularized injury that is imminent and not conjectural, that was caused by the challenged action, and that is likely to be redressed by a favorable judicial decision.” · 4 citing courts
- Where it cites § 7475
- “Although both parties advance arguments on the merits of EPA’s interpretation of 42 U.S.C. § 7475 (a)(3) in the SILs Guidance, for the reasons detailed herein, we do not reach those issues.”
- The case’s holding
- Violations of preconstruction permitting requirements occur at the time of construction and do not constitute continuing violations that toll the statute of limitations.
- Later courts cite it for
- “under the continuing violations doctrine, the statute of limitations is tolled for a claim that otherwise would be time-barred where the violation giving rise to the claim continues to occur within the limitations period.” · 8 citing courts
- Where it cites § 7475
- “Although EPA had a statutory duty under the Clean Air Act to either grant or deny the Permit application within one year, 42 U.S.C. § 7475 (c), it failed to do so.”
- The case’s holding
- A permitting authority must apply the air quality regulations in effect at the time of the permitting decision and lacks authority to waive current standards ad hoc through grandfathering.
- Later courts cite it for
- “clearly requires epa to apply the regulations in effect at the time of the permitting decision.” · 2 citing courts
- Where it cites § 7475
- “42 U.S.C. §§ 7475 (a); 7479(2)(C) (“The term ‘construction’ .”
- The case’s holding
- Prevention of significant deterioration requirements are conditions of construction rather than ongoing operational duties.
- Later courts cite it for
- “the psd program is primarily implemented by the states through 'state implementation plans' (sips).” · 3 citing courts
- Where it cites § 7475
- “They also “assure[d] that any decision to permit increased air pollution in any area to which this section applies is made only after careful evaluation of all the consequences of such a decision and after adequate procedural opportunities for informed public participation in…”
- The case’s holding
- The Clean Air Act does not authorize citizen suits against facilities that have obtained or are seeking a preconstruction permit.
- Later courts cite it for
- “does not authorize preconstruction citizen suits against facilities that have either obtained a permit or are in the process of doing so.” · 2 citing courts
- Where it cites § 7475
- “See 42 U.S.C. § 7475 (a). Once issued, a PSD permit can expire and become invalid in three different ways: [a] [I]f construction is not commenced within 18 months after receipt of such approval, [b] if construction is discontinued for a period of 18 months or more, or [c] if…”
- The case’s holding
- An organization has standing if at least one member has standing, the interests are germane to the organization's purpose, and relief does not require individual member participation.
- Later courts cite it for
- “we don't know if the particulate matter from the plant will blot out the sky or merely create a thin haze that's not visible to the naked eye, . . . . we do know . . . that the plant will release some pollutants and that mckasson believes these pollutants will ruin her ability to enjoy rend lake and taint the surrounding area.” · 4 citing courts
- Where it cites § 7475
- “The EPA points to the Act’s Prevention of Significant Deterioration (PSD) program, 42 U.S.C. § 7475 , and its requirement of controls at least as stringent as limits set under Section 7411, see id.”
- The case’s holding
- Section 111(d) of the Clean Air Act, as amended in 1990, precludes EPA from regulating greenhouse gas emissions from existing coal-fired power plants already regulated under Section 112.
- Later courts cite it for
- “repeal of the clean power plan rested critically on a mistaken reading of the clean air act” · 3 citing courts
- Where it cites § 7475
- “5, screening tools the EPA uses to determine whether a new source may be exempted from certain requirements under § 165 of the Act, 42 U.S.C. § 7475 . 75 Fed.Reg. at 64,890-91, *460 64,895.”
- Later courts cite it for
- “on remand the epa may promulgate regulations that do not include sils or do include sils that do not allow the construction or modification of a source to evade the requirements of the act.” · 3 citing courts
- Where it cites § 7475
- “” 42 U.S.C. § 7475 (a)(3)(B). The permitting authority (either a state or EPA) must grant or deny a completed preconstruction permit application under the PSD program within one year of filing.”
- Later courts cite it for
- “a general grant of authority cannot displace the clear, specific text of the act.” · 2 citing courts
- Where it cites § 7475
- “See 42 U.S.C. § 7475 (a)(4). In addition, the Clean Air Act prescribes uniform national standards known as New Source Performance Standards that establish technology-based minimum levels of performance with which certain types of new and modified sources must comply.”
- Later courts cite it for
- “the statute of limitations for a violation of the pre-con-struction permit requirements under 42 u.s.c. 7475 begins to run at the time of construction and does not continue through the operational life of the modified source” · 3 citing courts
- Where it cites § 7475
- “major modifications and/or operating the Baldwin Station facility after the modifications without first obtaining a PSD permit as required by 40 C.F.R. § 52.”
- Later courts cite it for
- “the plain language of the psd provisions demonstrates that any preconstruction violation occurs when the actual construction is commenced, and not at some later point in time.” · 3 citing courts
- Where it cites § 7475
- “See■ 42 U.S.C. §§ 7475 (a) (setting permitting requirements), 7479(1) (defining “major emitting facility”).”
- The case’s holding
- The prevention of significant deterioration program requirements apply only to the construction or modification of a major emitting facility rather than its subsequent operation.
- Later courts cite it for
- “defer to the epa's interpretation of the psd regulations . . . because such an interpretation would contradict the unambiguous text of 7475(a)” · 2 citing courts
Show all 202 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 15 cases in 2009. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 61 courts in all.
(a)1 case
Amendment years (notes): 1977
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.