Skip to main content
U.S. CodeTitle 42Chapter 85— Air Pollution Prevention and ControlSubchapter I— Programs and ActivitiesPart C— Prevention of Significant Deterioration of Air Qualitysubpart i— clean air

42 U.S.C. § 7475 (2026)

Preconstruction requirements

Edition and currency
U.S. Code current through Pub. L. 119-102 (OLRC release point). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTU.S. Code current through Pub. L. 119-102 (OLRC release point) cited 1978–2025 202citing cases
At a glance

Courts have cited this section in 202 opinions since 1978, 18 of them in the last five years. The most litigated part is subsection (a) (1 case).

(a) Major emitting facilities on which construction is commencedNo major emitting facility on which construction is commenced after August 7, 1977, may be constructed in any area to which this part applies unless—(1) a permit has been issued for such proposed facility in accordance with this part setting forth emission limitations for such facility which conform to the requirements of this part;(2) the proposed permit has been subject to a review in accordance with this section, the required analysis has been conducted in accordance with regulations promulgated by the Administrator, and a public hearing has been held with opportunity for interested persons including representatives of the Administrator to appear and submit written or oral presentations on the air quality impact of such source, alternatives thereto, control technology requirements, and other appropriate considerations;(3) the owner or operator of such facility demonstrates, as required pursuant to section 7410(j) of this title, that emissions from construction or operation of such facility will not cause, or contribute to, air pollution in excess of any (A) maximum allowable increase or maximum allowable concentration for any pollutant in any area to which this part applies more than one time per year, (B) national ambient air quality standard in any air quality control region, or (C) any other applicable emission standard or standard of performance under this chapter;(4) the proposed facility is subject to the best available control technology for each pollutant subject to regulation under this chapter emitted from, or which results from, such facility;(5) the provisions of subsection (d) with respect to protection of class I areas have been complied with for such facility;(6) there has been an analysis of any air quality impacts projected for the area as a result of growth associated with such facility;(7) the person who owns or operates, or proposes to own or operate, a major emitting facility for which a permit is required under this part agrees to conduct such monitoring as may be necessary to determine the effect which emissions from any such facility may have, or is having, on air quality in any area which may be affected by emissions from such source; and(8) in the case of a source which proposes to construct in a class III area, emissions from which would cause or contribute to exceeding the maximum allowable increments applicable in a class II area and where no standard under section 7411 of this title has been promulgated subsequent to August 7, 1977, for such source category, the Administrator has approved the determination of best available technology as set forth in the permit.(b) Exception

The demonstration pertaining to maximum allowable increases required under subsection (a)(3) shall not apply to maximum allowable increases for class II areas in the case of an expansion or modification of a major emitting facility which is in existence on August 7, 1977, whose allowable emissions of air pollutants, after compliance with subsection (a)(4), will be less than fifty tons per year and for which the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur oxides will not cause or contribute to ambient air quality levels in excess of the national secondary ambient air quality standard for either of such pollutants.

(c) Permit applications

Any completed permit application under section 7410 of this title for a major emitting facility in any area to which this part applies shall be granted or denied not later than one year after the date of filing of such completed application.

(d) Action taken on permit applications; notice; adverse impact on air quality related values; variance; emission limitations(1) Each State shall transmit to the Administrator a copy of each permit application relating to a major emitting facility received by such State and provide notice to the Administrator of every action related to the consideration of such permit.(2)(A) The Administrator shall provide notice of the permit application to the Federal Land Manager and the Federal official charged with direct responsibility for management of any lands within a class I area which may be affected by emissions from the proposed facility.(B) The Federal Land Manager and the Federal official charged with direct responsibility for management of such lands shall have an affirmative responsibility to protect the air quality related values (including visibility) of any such lands within a class I area and to consider, in consultation with the Administrator, whether a proposed major emitting facility will have an adverse impact on such values.(C)(i) In any case where the Federal official charged with direct responsibility for management of any lands within a class I area or the Federal Land Manager of such lands, or the Administrator, or the Governor of an adjacent State containing such a class I area files a notice alleging that emissions from a proposed major emitting facility may cause or contribute to a change in the air quality in such area and identifying the potential adverse impact of such change, a permit shall not be issued unless the owner or operator of such facility demonstrates that emissions of particulate matter and sulfur dioxide will not cause or contribute to concentrations which exceed the maximum allowable increases for a class I area.(ii) In any case where the Federal Land Manager demonstrates to the satisfaction of the State that the emissions from such facility will have an adverse impact on the air quality-related values (including visibility) of such lands, notwithstanding the fact that the change in air quality resulting from emissions from such facility will not cause or contribute to concentrations which exceed the maximum allowable increases for a class I area, a permit shall not be issued.(iii) In any case where the owner or operator of such facility demonstrates to the satisfaction of the Federal Land Manager, and the Federal Land Manager so certifies, that the emissions from such facility will have no adverse impact on the air quality-related values of such lands (including visibility), notwithstanding the fact that the change in air quality resulting from emissions from such facility will cause or contribute to concentrations which exceed the maximum allowable increases for class I areas, the State may issue a permit.(iv) In the case of a permit issued pursuant to clause (iii), such facility shall comply with such emission limitations under such permit as may be necessary to assure that emissions of sulfur oxides and particulates from such facility will not cause or contribute to concentrations of such pollutant which exceed the following maximum allowable increases over the baseline concentration for such pollutants:

 

Maximum allowable increase (in micrograms per cubic meter)

Particulate matter:

Annual geometric mean

19  

Twenty-four-hour maximum

37  

Sulfur dioxide:

Annual arithmetic mean

20  

Twenty-four-hour maximum

91  

Three-hour maximum

325  

(D)(i) In any case where the owner or operator of a proposed major emitting facility who has been denied a certification under subparagraph (C)(iii) demonstrates to the satisfaction of the Governor, after notice and public hearing, and the Governor finds, that the facility cannot be constructed by reason of any maximum allowable increase for sulfur dioxide for periods of twenty-four hours or less applicable to any class I area and, in the case of Federal mandatory class I areas, that a variance under this clause will not adversely affect the air quality related values of the area (including visibility), the Governor, after consideration of the Federal Land Manager’s recommendation (if any) and subject to his concurrence, may grant a variance from such maximum allowable increase. If such variance is granted, a permit may be issued to such source pursuant to the requirements of this subparagraph.(ii) In any case in which the Governor recommends a variance under this subparagraph in which the Federal Land Manager does not concur, the recommendations of the Governor and the Federal Land Manager shall be transmitted to the President. The President may approve the Governor’s recommendation if he finds that such variance is in the national interest. No Presidential finding shall be reviewable in any court. The variance shall take effect if the President approves the Governor’s recommendations. The President shall approve or disapprove such recommendation within ninety days after his receipt of the recommendations of the Governor and the Federal Land Manager.(iii) In the case of a permit issued pursuant to this subparagraph, such facility shall comply with such emission limitations under such permit as may be necessary to assure that emissions of sulfur oxides from such facility will not (during any day on which the otherwise applicable maximum allowable increases are exceeded) cause or contribute to concentrations which exceed the following maximum allowable increases for such areas over the baseline concentration for such pollutant and to assure that such emissions will not cause or contribute to concentrations which exceed the otherwise applicable maximum allowable increases for periods of exposure of 24 hours or less on more than 18 days during any annual period:

MAXIMUM ALLOWABLE INCREASE

(In micrograms per cubic meter)

Period of exposure

Low

terrain areas

High

terrain areas

24-hr maximum

36

62

3-hr maximum

130

221

(iv) For purposes of clause (iii), the term “high terrain area” means with respect to any facility, any area having an elevation of 900 feet or more above the base of the stack of such facility, and the term “low terrain area” means any area other than a high terrain area.
(e) Analysis; continuous air quality monitoring data; regulations; model adjustments(1) The review provided for in subsection (a) shall be preceded by an analysis in accordance with regulations of the Administrator, promulgated under this subsection, which may be conducted by the State (or any general purpose unit of local government) or by the major emitting facility applying for such permit, of the ambient air quality at the proposed site and in areas which may be affected by emissions from such facility for each pollutant subject to regulation under this chapter which will be emitted from such facility.(2) Effective one year after August 7, 1977, the analysis required by this subsection shall include continuous air quality monitoring data gathered for purposes of determining whether emissions from such facility will exceed the maximum allowable increases or the maximum allowable concentration permitted under this part. Such data shall be gathered over a period of one calendar year preceding the date of application for a permit under this part unless the State, in accordance with regulations promulgated by the Administrator, determines that a complete and adequate analysis for such purposes may be accomplished in a shorter period. The results of such analysis shall be available at the time of the public hearing on the application for such permit.(3) The Administrator shall within six months after August 7, 1977, promulgate regulations respecting the analysis required under this subsection which regulations—(A) shall not require the use of any automatic or uniform buffer zone or zones,(B) shall require an analysis of the ambient air quality, climate and meteorology, terrain, soils and vegetation, and visibility at the site of the proposed major emitting facility and in the area potentially affected by the emissions from such facility for each pollutant regulated under this chapter which will be emitted from, or which results from the construction or operation of, such facility, the size and nature of the proposed facility, the degree of continuous emission reduction which could be achieved by such facility, and such other factors as may be relevant in determining the effect of emissions from a proposed facility on any air quality control region,(C) shall require the results of such analysis shall be available at the time of the public hearing on the application for such permit, and(D) shall specify with reasonable particularity each air quality model or models to be used under specified sets of conditions for purposes of this part.Any model or models designated under such regulations may be adjusted upon a determination, after notice and opportunity for public hearing, by the Administrator that such adjustment is necessary to take into account unique terrain or meteorological characteristics of an area potentially affected by emissions from a source applying for a permit required under this part.(July 14, 1955, ch. 360, title I, § 165, as added Pub. L. 95–95, title I, § 127(a), Aug. 7, 1977, 91 Stat. 735; amended Pub. L. 95–190, § 14(a)(44)–(51), Nov. 16, 1977, 91 Stat. 1402.)Editorial NotesAmendments

1977—Subsec. (a)(1). Pub. L. 95–190, § 14(a)(44), substituted “part;” for “part:”.

Subsec. (a)(3). Pub. L. 95–190, § 14(a)(45), inserted provision making applicable requirement of section 7410(j) of this title.

Subsec. (b). Pub. L. 95–190, § 14(a)(46), inserted “cause or” before “contribute” and struck out “actual” before “allowable emissions”.

Subsec. (d)(2)(C). Pub. L. 95–190, § 14(a)(47)–(49), in cl. (ii) substituted “contribute” for “contrbute”, in cl. (iii) substituted “quality-related” for “quality related” and “concentrations which” for “concentrations, which”, and in cl. (iv) substituted “such facility” for “such sources” and “will not cause or contribute to concentrations of such pollutant which exceed” for “together with all other sources, will not exceed”.

Subsec. (d)(2)(D). Pub. L. 95–190, § 14(a)(50), (51), in cl. (iii) substituted provisions relating to determinations of amounts of emissions of sulfur oxides from facilities, for provisions relating to determinations of amounts of emissions of sulfur oxides from sources operating under permits issued pursuant to this subpar., together with all other sources, and added cl. (iv).

The 20 cases that cite 42 U.S.C. § 7475 most heavily, weighted by court and treatment. RelevanceNewestTreatment
cites § 7475 19×cited by 530 cases
Where it cites § 7475
“735 , and amended, 42 U.S.C. § 7475 (a)(4). BACT, as defined in the CAA, means, for any major air pollutant emitting facility, "an emission limitation based on the maximum degree of [pollutant] reduction .”
The case’s holding
Courts must apply the arbitrary and capricious standard of review under the APA when a statute does not specify a particular standard for reviewing agency action.
Later courts cite it for
“even when an agency explains its decision with less than ideal clarity, a reviewing court will not upset the decision on that account if the agency's path may reasonably be discerned.” · 104 citing courts
2
GREENSierra Club v. Oklahoma Gas & Elec. Co., 816 F.3d 666 (10th Cir. 2016).
cites § 7475 16×cited by 104 cases
The case’s holding
A claim for civil penalties accrues when the unpermitted modification begins, and the statute of limitations does not reset on each day of continuing conduct.
Later courts cite it for
“we generally do not consider arguments raised for the first time in a reply brief.” · 11 citing courts
3
GREENNew York v. Niagara Mohawk Power Corp., 263 F. Supp. 2d 650 (W.D.N.Y. 2003).
cites § 7475 45×cited by 31 cases
Where it cites § 7475
“Under 42 U.S.C. § 7475 (a), no major emitting facilities 9 on which construction 10 *654 is commenced after August 7, 1977, may be constructed unless the preconstruction requirements of 42 U.”
The case’s holding
A Clean Air Act preconstruction permit violation is singular and occurs at construction, so it is not a continuing violation and limitations runs from construction, not operation.
Later courts cite it for
“the state's position, taken to its logical end, suggests a de facto elimination of any statute of limitation, for the limitation period would never begin to accrue as long as the facility remained in operation.” · 2 citing courts
4
GREENAlabama Power Co. v. Douglas M. Costle, 636 F.2d 323 (D.C. Cir. 1980).
cites § 7475 28×cited by 267 cases
The case’s holding
Courts should be reluctant to interpret statutory terms in a manner that mandates pointless expenditures of effort.
Later courts cite it for
“inherent in most statutory schemes, to overlook circumstances that in context may fairly be considered de minimis.” · 10 citing courts
5
GREENSierra Club v. Moser, 310 P.3d 360 (Kan. 2013).
cites § 7475 12×cited by 60 cases
The case’s holding
An association has standing if its members demonstrate a cognizable injury, the interests protected are germane to the organization's purpose, and the requested relief avoids individual participation.
Later courts cite it for
“a personal interest in a court's decision and that he or she personally suffers some actual or threatened injury as a result of the challenged conduct.” · 6 citing courts
cites § 7475 8×cited by 55 cases
Where it cites § 7475
“” See 42 U.S.C. §§ 7475 ; 7479(1). All other stationary sources are subject to PSD permitting if they have the potential to emit over 250 tpy of “any air pollutant.”
The case’s holding
A party may not assert an entirely new injury or theory of standing in a reply brief to establish Article III jurisdiction.
Later courts cite it for
“we do not determine the convincing force of evidence, nor the conclusion it should support, but only whether the conclusion reached by epa is supported by substantial evidence when considered on the record as a whole.” · 3 citing courts
cites § 7475 14×cited by 29 cases
The case’s holding
An agency may use its rulemaking authority to implement a reasonable compromise when statutory provisions are irreconcilably inconsistent.
Later courts cite it for
“reminds' affected parties of existing duties.” · 5 citing courts
8
GREENTexas v. Env't Prot. Agency, 726 F.3d 180 (D.C. Cir. 2013).
cites § 7475 8×cited by 35 cases
Where it cites § 7475
“” CAA § 165(a)(4), 42 U.S.C. § 7475 (a)(4). Part C also provides that EPA “shall .”
Later courts cite it for
“to establish article iii standing, a petitioner must demonstrate it has suffered a concrete and particularized injury that is imminent and not conjectural, that was caused by the challenged action, and that is likely to be redressed by a favorable judicial decision.” · 4 citing courts
9
GREENSierra Club v. EPA, 955 F.3d 56 (D.C. Cir. 2020).
cites § 7475 5×cited by 22 cases
Where it cites § 7475
“Although both parties advance arguments on the merits of EPA’s interpretation of 42 U.S.C. § 7475 (a)(3) in the SILs Guidance, for the reasons detailed herein, we do not reach those issues.”
10
cites § 7475 5×cited by 61 cases
The case’s holding
Violations of preconstruction permitting requirements occur at the time of construction and do not constitute continuing violations that toll the statute of limitations.
Later courts cite it for
“under the continuing violations doctrine, the statute of limitations is tolled for a claim that otherwise would be time-barred where the violation giving rise to the claim continues to occur within the limitations period.” · 8 citing courts
11
GREENSierra Club v. U.S. Env't Prot. Agency, 762 F.3d 971 (9th Cir. 2014).
cites § 7475 7×cited by 24 cases
Where it cites § 7475
“Although EPA had a statutory duty under the Clean Air Act to either grant or deny the Permit application within one year, 42 U.S.C. § 7475 (c), it failed to do so.”
The case’s holding
A permitting authority must apply the air quality regulations in effect at the time of the permitting decision and lacks authority to waive current standards ad hoc through grandfathering.
Later courts cite it for
“clearly requires epa to apply the regulations in effect at the time of the permitting decision.” · 2 citing courts
12
GREENSierra Club v. Otter Tail Power Co., 615 F.3d 1008 (8th Cir. 2010).
cites § 7475 5×cited by 38 cases
Where it cites § 7475
“42 U.S.C. §§ 7475 (a); 7479(2)(C) (“The term ‘construction’ .”
The case’s holding
Prevention of significant deterioration requirements are conditions of construction rather than ongoing operational duties.
Later courts cite it for
“the psd program is primarily implemented by the states through 'state implementation plans' (sips).” · 3 citing courts
13
GREENCleanCOALition v. TXU POWER, 536 F.3d 469 (5th Cir. 2008).
cites § 7475 5×cited by 33 cases
Where it cites § 7475
“They also “assure[d] that any decision to permit increased air pollution in any area to which this section applies is made only after careful evaluation of all the consequences of such a decision and after adequate procedural opportunities for informed public participation in…”
The case’s holding
The Clean Air Act does not authorize citizen suits against facilities that have obtained or are seeking a preconstruction permit.
Later courts cite it for
“does not authorize preconstruction citizen suits against facilities that have either obtained a permit or are in the process of doing so.” · 2 citing courts
14
GREENSierra Club v. Franklin Cnty. Power of Illinois, LLC, 546 F.3d 918 (7th Cir. 2008).
cites § 7475 3×cited by 104 cases
Where it cites § 7475
“See 42 U.S.C. § 7475 (a). Once issued, a PSD permit can expire and become invalid in three different ways: [a] [I]f construction is not commenced within 18 months after receipt of such approval, [b] if construction is discontinued for a period of 18 months or more, or [c] if…”
The case’s holding
An organization has standing if at least one member has standing, the interests are germane to the organization's purpose, and relief does not require individual member participation.
Later courts cite it for
“we don't know if the particulate matter from the plant will blot out the sky or merely create a thin haze that's not visible to the naked eye, . . . . we do know . . . that the plant will release some pollutants and that mckasson believes these pollutants will ruin her ability to enjoy rend lake and taint the surrounding area.” · 4 citing courts
15
REDAm. Lung Ass'n v. EPA, 985 F.3d 914 (D.C. Cir. 2021).
cites § 7475 4×cited by 15 cases
Reversed by the U.S. Supreme Court in this case: West Virginia v. EPA (2022).
Where it cites § 7475
“The EPA points to the Act’s Prevention of Significant Deterioration (PSD) program, 42 U.S.C. § 7475 , and its requirement of controls at least as stringent as limits set under Section 7411, see id.”
The case’s holding
Section 111(d) of the Clean Air Act, as amended in 1990, precludes EPA from regulating greenhouse gas emissions from existing coal-fired power plants already regulated under Section 112.
Later courts cite it for
“repeal of the clean power plan rested critically on a mistaken reading of the clean air act” · 3 citing courts
16
GREENSierra Club v. Env't Prot. Agency, 705 F.3d 458 (D.C. Cir. 2013).
cites § 7475 6×cited by 17 cases
Where it cites § 7475
“5, screening tools the EPA uses to determine whether a new source may be exempted from certain requirements under § 165 of the Act, 42 U.S.C. § 7475 . 75 Fed.Reg. at 64,890-91, *460 64,895.”
Later courts cite it for
“on remand the epa may promulgate regulations that do not include sils or do include sils that do not allow the construction or modification of a source to evade the requirements of the act.” · 3 citing courts
17
GREENMurray Energy Corp. v. EPA, 936 F.3d 597 (D.C. Cir. 2019).
cites § 7475 6×cited by 7 cases
Where it cites § 7475
“” 42 U.S.C. § 7475 (a)(3)(B). The permitting authority (either a state or EPA) must grant or deny a completed preconstruction permit application under the PSD program within one year of filing.”
Later courts cite it for
“a general grant of authority cannot displace the clear, specific text of the act.” · 2 citing courts
18
GREENUnited States v. Murphy Oil USA, Inc., 143 F. Supp. 2d 1054 (W.D. Wis. 2001).
cites § 7475 6×cited by 15 cases
Where it cites § 7475
“See 42 U.S.C. § 7475 (a)(4). In addition, the Clean Air Act prescribes uniform national standards known as New Source Performance Standards that establish technology-based minimum levels of performance with which certain types of new and modified sources must comply.”
Later courts cite it for
“the statute of limitations for a violation of the pre-con-struction permit requirements under 42 u.s.c. 7475 begins to run at the time of construction and does not continue through the operational life of the modified source” · 3 citing courts
19
GREENUnited States v. Illinois Power Co., 245 F. Supp. 2d 951 (S.D. Ill. 2003).
cites § 7475 6×cited by 14 cases
Where it cites § 7475
“major modifications and/or operating the Baldwin Station facility after the modifications without first obtaining a PSD permit as required by 40 C.F.R. § 52.”
Later courts cite it for
“the plain language of the psd provisions demonstrates that any preconstruction violation occurs when the actual construction is commenced, and not at some later point in time.” · 3 citing courts
20
GREENUnited States v. EME Homer City Generation, L.P, 727 F.3d 274 (3d Cir. 2013).
cites § 7475 4×cited by 27 cases
Where it cites § 7475
“See■ 42 U.S.C. §§ 7475 (a) (setting permitting requirements), 7479(1) (defining “major emitting facility”).”
The case’s holding
The prevention of significant deterioration program requirements apply only to the construction or modification of a major emitting facility rather than its subsequent operation.
Later courts cite it for
“defer to the epa's interpretation of the psd regulations . . . because such an interpretation would contradict the unambiguous text of 7475(a)” · 2 citing courts

Show all 202 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
197820012025

One bar per year. Tallest: 15 cases in 2009. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
D.C. Cir.309th Cir.227th Cir.155th Cir.106th Cir.7Tex. App.78th Cir.63rd Cir.5

The 8 courts with the most citing cases, of 61 courts in all.

By subsection
(a)1 case
USA v. Luminant Generation Co., 905 F.3d 874 (5th Cir. 2018).

Show all 202 citing cases (list view) →

Enactment and amendments
(July 14, 1955, ch. 360, title I, § 165, as added Pub. L. 95–95, title I, § 127(a), Aug. 7, 1977, 91 Stat. 735; amended Pub. L. 95–190, § 14(a)(44)–(51), Nov. 16, 1977, 91 Stat. 1402.)
Amendment years (notes): 1977
Versions

Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.