42 U.S.C. § 7410 (2026)
State implementation plans for national primary and secondary ambient air quality standards
Edition and currency
Other sources
Courts have cited this section in 612 opinions since 1978, 66 of them in the last five years. The most litigated part is subsection (a)(1) (2 cases).
The Administrator may, wherever he determines necessary, extend the period for submission of any plan or portion thereof which implements a national secondary ambient air quality standard for a period not to exceed 18 months from the date otherwise required for submission of such plan.
Except for a primary nonferrous smelter order under section 7419 of this title, a suspension under subsection (f) or (g) (relating to emergency suspensions), an exemption under section 7418 of this title (relating to certain Federal facilities), an order under section 7413(d) 1 of this title (relating to compliance orders), a plan promulgation under subsection (c), or a plan revision under subsection (a)(3); no order, suspension, plan revision, or other action modifying any requirement of an applicable implementation plan may be taken with respect to any stationary source by the State or by the Administrator.
As a condition for issuance of any permit required under this subchapter, the owner or operator of each new or modified stationary source which is required to obtain such a permit must show to the satisfaction of the permitting authority that the technological system of continuous emission reduction which is to be used at such source will enable it to comply with the standards of performance which are to apply to such source and that the construction or modification and operation of such source will be in compliance with all other requirements of this chapter.
Within 9 months after
Within 60 days of the Administrator’s receipt of a plan or plan revision, but no later than 6 months after the date, if any, by which a State is required to submit the plan or revision, the Administrator shall determine whether the minimum criteria established pursuant to subparagraph (A) have been met. Any plan or plan revision that a State submits to the Administrator, and that has not been determined by the Administrator (by the date 6 months after receipt of the submission) to have failed to meet the minimum criteria established pursuant to subparagraph (A), shall on that date be deemed by operation of law to meet such minimum criteria.
Where the Administrator determines that a plan submission (or part thereof) does not meet the minimum criteria established pursuant to subparagraph (A), the State shall be treated as not having made the submission (or, in the Administrator’s discretion, part thereof).
Within 12 months of a determination by the Administrator (or a determination deemed by operation of law) under paragraph (1) that a State has submitted a plan or plan revision (or, in the Administrator’s discretion, part thereof) that meets the minimum criteria established pursuant to paragraph (1), if applicable (or, if those criteria are not applicable, within 12 months of submission of the plan or revision), the Administrator shall act on the submission in accordance with paragraph (3).
In the case of any submittal on which the Administrator is required to act under paragraph (2), the Administrator shall approve such submittal as a whole if it meets all of the applicable requirements of this chapter. If a portion of the plan revision meets all the applicable requirements of this chapter, the Administrator may approve the plan revision in part and disapprove the plan revision in part. The plan revision shall not be treated as meeting the requirements of this chapter until the Administrator approves the entire plan revision as complying with the applicable requirements of this chapter.
The Administrator may approve a plan revision based on a commitment of the State to adopt specific enforceable measures by a date certain, but not later than 1 year after the date of approval of the plan revision. Any such conditional approval shall be treated as a disapproval if the State fails to comply with such commitment.
Whenever the Administrator finds that the applicable implementation plan for any area is substantially inadequate to attain or maintain the relevant national ambient air quality standard, to mitigate adequately the interstate pollutant transport described in section 7506a of this title or section 7511c of this title, or to otherwise comply with any requirement of this chapter, the Administrator shall require the State to revise the plan as necessary to correct such inadequacies. The Administrator shall notify the State of the inadequacies, and may establish reasonable deadlines (not to exceed 18 months after the date of such notice) for the submission of such plan revisions. Such findings and notice shall be public. Any finding under this paragraph shall, to the extent the Administrator deems appropriate, subject the State to the requirements of this chapter to which the State was subject when it developed and submitted the plan for which such finding was made, except that the Administrator may adjust any dates applicable under such requirements as appropriate (except that the Administrator may not adjust any attainment date prescribed under part D, unless such date has elapsed).
Whenever the Administrator determines that the Administrator’s action approving, disapproving, or promulgating any plan or plan revision (or part thereof), area designation, redesignation, classification, or reclassification was in error, the Administrator may in the same manner as the approval, disapproval, or promulgation revise such action as appropriate without requiring any further submission from the State. Such determination and the basis thereof shall be provided to the State and public.
Each revision to an implementation plan submitted by a State under this chapter shall be adopted by such State after reasonable notice and public hearing. The Administrator shall not approve a revision of a plan if the revision would interfere with any applicable requirement concerning attainment and reasonable further progress (as defined in section 7501 of this title), or any other applicable requirement of this chapter.
The Administrator may apply any of the sanctions listed in section 7509(b) of this title at any time (or at any time after) the Administrator makes a finding, disapproval, or determination under paragraphs (1) through (4), respectively, of section 7509(a) of this title in relation to any plan or plan item (as that term is defined by the Administrator) required under this chapter, with respect to any portion of the State the Administrator determines reasonable and appropriate, for the purpose of ensuring that the requirements of this chapter relating to such plan or plan item are met. The Administrator shall, by rule, establish criteria for exercising his authority under the previous sentence with respect to any deficiency referred to in section 7509(a) of this title to ensure that, during the 24-month period following the finding, disapproval, or determination referred to in section 7509(a) of this title, such sanctions are not applied on a statewide basis where one or more political subdivisions covered by the applicable implementation plan are principally responsible for such deficiency.
Any provision of any applicable implementation plan that was approved or promulgated by the Administrator pursuant to this section as in effect before
In the case of an area to which, immediately before
If an Indian tribe submits an implementation plan to the Administrator pursuant to section 7601(d) of this title, the plan shall be reviewed in accordance with the provisions for review set forth in this section for State plans, except as otherwise provided by regulation promulgated pursuant to section 7601(d)(2) of this title. When such plan becomes effective in accordance with the regulations promulgated under section 7601(d) of this title, the plan shall become applicable to all areas (except as expressly provided otherwise in the plan) located within the exterior boundaries of the reservation, notwithstanding the issuance of any patent and including rights-of-way running through the reservation.
Any State shall submit, according to such schedule as the Administrator may prescribe, such reports as the Administrator may require relating to emission reductions, vehicle miles traveled, congestion levels, and any other information the Administrator may deem necessary to assess the development 2
The Energy Supply and Environmental Coordination Act of 1974, referred to in subsec. (a)(3)(B), is Pub. L. 93–319,
Section 7413 of this title, referred to in subsecs. (a)(3)(C), (6), (f)(5), (g)(3), and (i), was amended generally by Pub. L. 101–549, title VII, § 701,
Section 1857c–10 of this title, as in effect before
Section was formerly classified to section 1857c–5 of this title.
A prior section 110 of act
1990—Subsec. (a)(1). Pub. L. 101–549, § 101(d)(8), substituted “3 years (or such shorter period as the Administrator may prescribe)” for “nine months” in two places.
Subsec. (a)(2). Pub. L. 101–549, § 101(b), amended par. (2) generally, substituting present provisions for provisions setting the time within which the Administrator was to approve or disapprove a plan or portion thereof and listing the conditions under which the plan or portion thereof was to be approved after reasonable notice and hearing.
Subsec. (a)(3)(A). Pub. L. 101–549, § 101(d)(1), struck out subpar. (A) which directed Administrator to approve any revision of an implementation plan if it met certain requirements and had been adopted by the State after reasonable notice and public hearings.
Subsec. (a)(3)(D). Pub. L. 101–549, § 101(d)(1), struck out subpar. (D) which directed that certain implementation plans be revised to include comprehensive measures and requirements.
Subsec. (a)(4). Pub. L. 101–549, § 101(d)(2), struck out par. (4) which set forth requirements for review procedure.
Subsec. (c)(1). Pub. L. 101–549, § 102(h), amended par. (1) generally, substituting present provisions for provisions relating to preparation and publication of regulations setting forth an implementation plan, after opportunity for a hearing, upon failure of a State to make required submission or revision.
Subsec. (c)(2)(A). Pub. L. 101–549, § 101(d)(3)(A), struck out subpar. (A) which required a study and report on necessity of parking surcharge, management of parking supply, and preferential bus/carpool lane regulations to achieve and maintain national primary ambient air quality standards.
Subsec. (c)(2)(C). Pub. L. 101–549, § 101(d)(3)(B), struck out subpar. (C) which authorized suspension of certain regulations and requirements relating to management of parking supply.
Subsec. (c)(4). Pub. L. 101–549, § 101(d)(3)(C), struck out par. (4) which permitted Governors to temporarily suspend measures in implementation plans relating to retrofits, gas rationing, and reduction of on-street parking.
Subsec. (c)(5)(B). Pub. L. 101–549, § 101(d)(3)(D), struck out “(including the written evidence required by part D),” after “include comprehensive measures”.
Subsec. (d). Pub. L. 101–549, § 101(d)(4), struck out subsec. (d) which defined an applicable implementation plan for purposes of this chapter.
Subsec. (e). Pub. L. 101–549, § 101(d)(5), struck out subsec. (e) which permitted an extension of time for attainment of a national primary ambient air quality standard.
Subsec. (f)(1). Pub. L. 101–549, § 412, inserted “or of any requirement under section 7651j of this title (concerning excess emissions penalties or offsets)” in subpar. (A) and in last sentence.
Subsec. (g)(1). Pub. L. 101–549, § 101(d)(6), substituted “12 months of submission of the proposed plan revision” for “the required four month period” in closing provisions.
Subsec. (h)(1). Pub. L. 101–549, § 101(d)(7), substituted “5 years after
Subsecs. (k) to (n). Pub. L. 101–549, § 101(c), added subsecs. (k) to (n).
Subsec. (o). Pub. L. 101–549, § 107(c), added subsec. (o).
Subsec. (p). Pub. L. 101–549, § 108(d), added subsec. (p).
1981—Subsec. (a)(3)(C). Pub. L. 97–23 inserted reference to extensions of compliance in decrees entered under section 7413(e) of this title (relating to iron- and steel-producing operations).
1977—Subsec. (a)(2)(A). Pub. L. 95–95, § 108(a)(1), substituted “(A) except as may be provided in subparagraph (I)(i) in the case of a plan” for “(A)(i) in the case of a plan”.
Subsec. (a)(2)(B). Pub. L. 95–95, § 108(a)(2), substituted “transportation controls, air quality maintenance plans, and preconstruction review of direct sources of air pollution as provided in subparagraph (D)” for “land use and transportation controls”.
Subsec. (a)(2)(D). Pub. L. 95–95, § 108(a)(3), substituted “it includes a program to provide for the enforcement of emission limitations and regulation of the modification, construction, and operation of any stationary source, including a permit program as required in parts C and D and a permit or equivalent program for any major emitting facility, within such region as necessary to assure (i) that national ambient air quality standards are achieved and maintained, and (ii) a procedure” for “it includes a procedure”.
Subsec. (a)(2)(E). Pub. L. 95–95, § 108(a)(4), substituted “it contains adequate provisions (i) prohibiting any stationary source within the State from emitting any air pollutant in amounts which will (I) prevent attainment or maintenance by any other State of any such national primary or secondary ambient air quality standard, or (II) interfere with measures required to be included in the applicable implementation plan for any other State under part C to prevent significant deterioration of air quality or to protect visibility, and (ii) insuring compliance with the requirements of section 7426 of this title, relating to interstate pollution abatement” for “it contains adequate provisions for intergovernmental cooperation, including measures necessary to insure that emissions of air pollutants from sources located in any air quality control region will not interfere with the attainment or maintenance of such primary or secondary standard in any portion of such region outside of such State or in any other air quality control region”.
Subsec. (a)(2)(F). Pub. L. 95–95, § 108(a)(5), added cl. (vi).
Subsec. (a)(2)(H). Pub. L. 95–190, § 14(a)(1), substituted “1977;” for “1977”.
Pub. L. 95–95, § 108(a)(6), inserted “except as provided in paragraph (3)(C),” after “or (ii)” and “or to otherwise comply with any additional requirements established under the Clean Air Act Amendments of 1977” after “to achieve the national ambient air quality primary or secondary standard which it implements”.
Subsec. (a)(2)(I). Pub. L. 95–95, § 108(b), added subpar. (I).
Subsec. (a)(2)(J). Pub. L. 95–190, § 14(a)(2), substituted “; and” for “, and”.
Pub. L. 95–95, § 108(b), added subpar. (J).
Subsec. (a)(2)(K). Pub. L. 95–95, § 108(b) added subpar. (K).
Subsec. (a)(3)(C). Pub. L. 95–95, § 108(c), added subpar. (C).
Subsec. (a)(3)(D). Pub. L. 95–190, § 14(a)(4), added subpar. (D).
Subsec. (a)(5). Pub. L. 95–95, § 108(e), added par. (5).
Subsec. (a)(5)(D). Pub. L. 95–190, § 14(a)(3), struck out “preconstruction or premodification” before “review”.
Subsec. (a)(6). Pub. L. 95–95, § 108(e), added par. (6).
Subsec. (c)(1). Pub. L. 95–95, § 108(d)(1), (2), substituted “plan which meets the requirements of this section” for “plan for any national ambient air quality primary or secondary standard within the time prescribed” in subpar. (A) and, in provisions following subpar. (C), directed that any portion of a plan relating to any measure described in first sentence of 7421 of this title (relating to consultation) or the consultation process required under such section 7421 of this title not be required to be promulgated before the date eight months after such date required for submission.
Subsec. (c)(3) to (5). Pub. L. 95–95, § 108(d)(3), added pars. (3) to (5).
Subsec. (d). Pub. L. 95–95, § 108(f), substituted “and which implements the requirements of this section” for “and which implements a national primary or secondary ambient air quality standard in a State”.
Subsec. (f). Pub. L. 95–95, § 107(a), substituted provisions relating to the handling of national or regional energy emergencies for provisions relating to the postponement of compliance by stationary sources or classes of moving sources with any requirement of applicable implementation plans.
Subsec. (g). Pub. L. 95–95, § 108(g), added subsec. (g) relating to publication of comprehensive document.
Pub. L. 95–95, § 107(b), added subsec. (g) relating to Governor’s authority to issue temporary emergency suspensions.
Subsec. (h). Pub. L. 95–190, § 14(a)(5), redesignated subsec. (g), added by Pub. L. 95–95, § 108(g), as (h). Former subsec. (h) redesignated (i).
Subsec. (i). Pub. L. 95–190, § 14(a)(5), redesignated subsec. (h), added by Pub. L. 95–95, § 108(g), as (i). Former subsec. (i) redesignated (j) and amended.
Subsec. (j). Pub. L. 95–190 § 14(a)(5), (6), redesignated subsec. (i), added by Pub. L. 95–95, § 108(g), as (j) and in subsec. (j) as so redesignated, substituted “will enable such source” for “at such source will enable it”.
1974—Subsec. (a)(3). Pub. L. 93–319, § 4(a), designated existing provisions as subpar. (A) and added subpar. (B).
Subsec. (c). Pub. L. 93–319, § 4(b), designated existing provisions as par. (1) and existing pars. (1), (2), and (3) as subpars. (A), (B), and (C), respectively, of such redesignated par. (1), and added par. (2).
Amendment by Pub. L. 95–95 effective
Suits, actions, and other proceedings lawfully commenced by or against the Administrator or any other officer or employee of the United States in his official capacity or in relation to the discharge of his official duties under act
All rules, regulations, orders, determinations, contracts, certifications, authorizations, delegations, or other actions duly issued, made, or taken by or pursuant to act
Nothing in the Clean Air Act Amendments of 1977 [Pub. L. 95–95] to affect any requirement of an approved implementation plan under this section or any other provision in effect under this chapter before
Pub. L. 91–604, § 16,
“Federal Energy Administrator”, for purposes of this chapter, to mean Administrator of Federal Energy Administration established by Pub. L. 93–275,
Federal Energy Administration terminated and functions vested by law in Administrator thereof transferred to Secretary of Energy (unless otherwise specifically provided) by sections 7151(a) and 7293 of this title.
- Where it cites § 7410
- “See 42 U.S.C. § 7410 (a)(1). Section 110(a)(2) of the Act lists the required elements of a SIP submission.”
- The case’s holding
- The agency exceeds its authority by requiring emissions reductions exceeding a state's significant contribution or by imposing federal implementation plans before allowing states to implement their own plans.
- Later courts cite it for
- “rewrites a decades-old statute whose plain text and structure estab lish a clear chronology of federal and state responsibili ties.” · 2 citing courts
- Where it cites § 7410
- “42 U.S.C. §§ 7410 , 7491, 7492(e)(2). While the federal government has the primary responsibility for identifying air pollutants and setting standards, the states “bear ‘the primary responsibility’ for implementing those standards” by promulgating state implementation 2 Case:…”
- The case’s holding
- An agency action is regionally applicable and subject to regional venue unless it is based on a determination of nationwide scope or effect.
- Later courts cite it for
- “agency actions must be assessed according to the statutes and regulations in effect at the time of the relevant activity.” · 7 citing courts
- Later courts cite it for
- “through the use of the terms 'whenever' and 'may,' section 110(k)(6) confers discretion on the epa to decide if and when it will invoke the statute to revise a prior action.” · 2 citing courts
- Where it cites § 7410
- “CAA § 110, 42 U.S.C. § 7410 . Section 110 provides the framework for SIP development and submission by States to EPA,“within 3 years (or such shorter period as [EPA] may prescribe)” of promulgation of a NAAQS.”
- Later courts cite it for
- “to establish article iii standing, a petitioner must demonstrate it has suffered a concrete and particularized injury that is imminent and not conjectural, that was caused by the challenged action, and that is likely to be redressed by a favorable judicial decision.” · 4 citing courts
- Where it cites § 7410
- “" 42 U.S.C. § 7410 (a)(1); cf. § 7410(c)(1) (EPA shall promulgate an implementation plan if the State's plan is inadequate).”
- The case’s holding
- Courts must apply the arbitrary and capricious standard of review under the APA when a statute does not specify a particular standard for reviewing agency action.
- Later courts cite it for
- “even when an agency explains its decision with less than ideal clarity, a reviewing court will not upset the decision on that account if the agency's path may reasonably be discerned.” · 104 citing courts
- Where it cites § 7410
- “42 U.S.C. § 7410 (a)(1). SIPs must “include enforceable emission limitations and other control measures, means, or techniques .”
- Where it cites § 7410
- “CAA §§ 110(c) & (k)(3), 42 U.S.C. §§ 7410 (c) & (k)(3). Approved SIPs are enforceable as federal law and may be enforced by the state, the EPA, or individuals under the CAA citizen-suit provision.”
- The case’s holding
- The Clean Air Act does not require the EPA to make specific factual findings of NAAQS violations before issuing a SIP Call under section 110(k)(5), and Chevron deference applies to that interpretation.
- Later courts cite it for
- “uses a cooperative-federalism approach to regulate air quality.” · 2 citing courts
- Where it cites § 7410
- “The Act directs each state to submit to the EPA a State Implementation Plan (hereafter “SIP”), 42 U.S.C. § 7410 (a)(1), which the Administrator must approve if the plan satisfies the criteria specified in 42 U.”
- The case’s holding
- Petitioners are not barred from raising new arguments on judicial review simply because those arguments were not raised during the administrative comment period.
- Later courts cite it for
- “would require everyone who wishes to protect himself from arbitrary agency action not only to become a faithful reader of the notices of proposed rulemaking published each day in the federal register, but a psychic able to predict the possible changes that could be made in the proposal when the rule is finally promulgated,” · 3 citing courts
- Where it cites § 7410
- “ntly interfere with attainment or deteriorate air quality; (5) provide “necessary assurances” that the state has adequate resources “and authority under State (and, as appropriate, local) law to carry out [its] implementation plan;” (6) require owners and operators of stationary…”
- The case’s holding
- A reviewing court must be most deferential to an agency when its decision is based on the evaluation of complex scientific data within its technical expertise.
- Later courts cite it for
- “establishes a comprehensive program for controlling and improving the nation's air quality through state and federal regulation.” · 8 citing courts
- Where it cites § 7410
- “See CAA § 110(l), 42 U.S.C. § 7410 (l). Although we reject Hall’s procedural challenges, we conclude that the EPA’s interpretation of its review responsibility under § 110(l) is not consistent with the Act.”
- The case’s holding
- The EPA must determine whether a revised plan as a whole can meet attainment requirements rather than merely ensuring the revision does not weaken existing pollution controls.
- Later courts cite it for
- “interpretations of the act set forth in such non-precedential documents are not entitled to chevron deference.” · 5 citing courts
- Where it cites § 7410
- “42 U.S.C. § 7410 (a)(2)(D)(i). EPA has addressed the Good Neighbor Provision’s requirements in a series of rulemakings.”
- The case’s holding
- The Good Neighbor Provision bars the 2008 Update Rule from letting upwind States continue contributing to downwind air quality problems beyond the statutory deadlines by which downwind States must demonstrate attainment.
- Later courts cite it for
- “not to vacate regulations when doing so would risk significant harm to the public health or the environment.” · 3 citing courts
- Where it cites § 7410
- “Despite a statutory provision prohibiting sources "within the State" from contributing significantly to nonattainment in "any other State," CAA § 1 10(a)(2)(D), 42 U.S.C. § 7410 (a)(2)(D), the EPA adopted a *1257 regionwide approach to the problem.”
- The case’s holding
- An agency is not required to apply an argument raised against one specific rule provision to a different provision of the same rule.
- Later courts cite it for
- “epa cannot be expected to take an argument, raised in support of one specific objection, and apply it sua sponte to another provision.” · 1 citing court
- Where it cites § 7410
- “§§ 7410(k)(1)(B), 7410(k)(2), and 7410(k)(3). The EPA shall disapprove a SIP revision only if “the revision would *922 interfere with any applicable requirement concerning attainment” of the NAAQS “or any other applicable requirement” of the Act.”
- The case’s holding
- Courts must evaluate agency action solely on its stated rationale at the time of decision and disregard any post hoc rationalizations.
- Later courts cite it for
- “we must disregard any post hoc rationalizations of the agency's action and evaluate it solely on the basis of the agency's stated rationale at the time of its decision.” · 4 citing courts
- Where it cites § 7410
- “The states, on the other hand, have tire primary responsibility for assuring that air quality within their borders meets the NAAQS.”
- The case’s holding
- An association has standing if its members demonstrate a cognizable injury, the interests protected are germane to the organization's purpose, and the requested relief avoids individual participation.
- Later courts cite it for
- “a personal interest in a court's decision and that he or she personally suffers some actual or threatened injury as a result of the challenged conduct.” · 6 citing courts
- Where it cites § 7410
- “See 42 U.S.C. § 7410 . Before implementing its plan, each state must submit a proposed SIP to the EPA for approval.”
- Later courts cite it for
- “if the epa believes that its current interpretation of the clean air act requires georgia to modify its sip, the epa should require the state to revise its sip to conform to epa policy.” · 2 citing courts
- Where it cites § 7410
- “" [4] 42 U.S.C. § 7410 (a)(5)(A)(i) (2006). An "indirect source review program" means "the facility-by-facility review of indirect sources of air pollution, including such measures as are necessary to assure, or assist in assuring, that a new or modified indirect source will not…”
- Where it cites § 7410
- “§ 110(a)(1), 42 U. S. C. § 7410 (a)(1) (1982 ed.). As the final step in this start-up phase of the program, EPA was to act on a proposed SIP within four months: “The Administrator shall, within four months after the date required for submission of a plan under paragraph (1),…”
- The case’s holding
- The four-month statutory deadline for state implementation plans applies only to original plans and not to revisions, and the existing plan remains enforceable during a revision pendency.
- Later courts cite it for
- “a comprehensive national program that made the states and the federal government partners in the struggle against air pollution.” · 18 citing courts
- Where it cites § 7410
- “Under § 110(c), 42 U.S.C.A. § 7410 (c) (1978), EPA is to suspend a state plan and implement a plan of its own only if a state plan fails to meet minimum federal standards or is not submitted for approval within the requisite period of time.”
- The case’s holding
- An agency may use its rulemaking authority to implement a reasonable compromise when statutory provisions are irreconcilably inconsistent.
- Later courts cite it for
- “reminds' affected parties of existing duties.” · 5 citing courts
- Where it cites § 7410
- “” 42 U.S.C. § 7410 (a)(l)-(2). The states have “wide discretion” in formulating their SIPs, Union Elec.”
Show all 612 citing cases (list view) →
The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.
One bar per year. Tallest: 26 cases in 2009. 2026 is a partial year. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.
The 8 courts with the most citing cases, of 103 courts in all.
(a)(1)2 cases
(a)(2)(A)1 case
(a)(2)(C)1 case
(a)(2)(D)1 case
(a)(2)(D)(i)1 case
(c)1 case
(c)(1)1 case
(c)(2)(B)1 case
(k)(2)2 cases
Amendment years (notes): 1990, 1981, 1977, 1974
Edition shown: U.S. Code current through Pub. L. 119-102 (OLRC release point). Syfert holds no earlier or later version of this section.