Ariz. Rev. Stat. § 33-992.01 (2026)

Preliminary twenty day notice; definitions; content; election; waiver; service; single service; contract

Edition and currency
text as last checked Oct. 2026 (this copy records no edition or section history). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTtext as last checked Oct. 2026 (this copy records no edition or section history) cited 1982–2024 40citing cases
At a glance

Courts have cited this section in 40 opinions since 1982, 1 of them in the last five years. The most litigated part is subsection (B) (17 cases).

33-992.01. Preliminary twenty day notice; definitions; content; election; waiver; service; single service; contract

A. For the purposes of this section:

1. "Construction lender" means any mortgagee or beneficiary under a deed of trust lending funds all or a portion of which are used to defray the cost of the construction, alteration, repair or improvement, or any assignee or successor in interest of either.

2. "Original contractor" means any contractor who has a direct contractual relationship with the owner.

3. "Owner" means the person, or the person's successor in interest, that causes a building, structure or improvement to be constructed, altered or repaired, whether the interest or estate of the person is in fee, as vendee under a contract to purchase, as lessee, or other interest or estate less than fee. If an interest or estate is held by two or more persons as community property, joint tenants or tenants in common, any one or more of the persons may be deemed the owner.

4. "Preliminary twenty day notice" means one or more written notices from a claimant that are given before the recording of a mechanic's lien and that are required to be given pursuant to this section.

B. Except for a person performing actual labor for wages, every person who furnishes labor, professional services, materials, machinery, fixtures or tools for which a lien otherwise may be claimed under this article shall, as a necessary prerequisite to the validity of any claim of lien, serve the owner or reputed owner, the original contractor or reputed contractor, the construction lender, if any, or reputed construction lender, if any, and the person with whom the claimant has contracted for the purchase of those items with a written preliminary twenty day notice as prescribed by this section.

C. The preliminary twenty day notice referred to in subsection B of this section shall be given not later than twenty days after the claimant has first furnished labor, professional services, materials, machinery, fixtures or tools to the jobsite and shall contain the following information:

1. A general description of the labor, professional services, materials, machinery, fixtures or tools furnished or to be furnished and an estimate of the total price thereof.

2. The name and address of the person furnishing labor, professional services, materials, machinery, fixtures or tools.

3. The name of the person who contracted for the purchase of labor, professional services, materials, machinery, fixtures or tools.

4. A legal description, subdivision plat, street address, location with respect to commonly known roads or other landmarks in the area or any other description of the jobsite sufficient for identification.

5. The following statement in bold-faced type:

In accordance with Arizona Revised Statutes section 33-992.01, this is not a lien and this is not a reflection on the integrity of any contractor or subcontractor.

Notice to Property Owner

If bills are not paid in full for the labor, professional services, materials, machinery, fixtures or tools furnished or to be furnished, a mechanic's lien leading to the loss, through court foreclosure proceedings, of all or part of your property being improved may be placed against the property. You may wish to protect yourself against this consequence by either:

1. Requiring your contractor to furnish a conditional waiver and release pursuant to Arizona Revised Statutes section 33-1008, subsection D, paragraphs 1 and 3 signed by the person or firm giving you this notice before you make payment to your contractor.

2. Requiring your contractor to furnish an unconditional waiver and release pursuant to Arizona Revised Statutes section 33-1008, subsection D, paragraphs 2 and 4 signed by the person or firm giving you this notice after you make payment to your contractor.

3. Using any other method or device that is appropriate under the circumstances.

D. The preliminary notice given by any claimant shall follow substantially the following form:

Arizona Preliminary Twenty Day Lien Notice

In accordance with Arizona Revised Statutes section 33-992.01, this is not a lien. This is not a reflection on the integrity of any contractor or subcontractor.

The name and address of This preliminary lien notice has

the owner or reputed    been completed by (name and

owner are:  address of claimant):

      Date: _________________________

      By: ___________________________

      Address: ______________________

The name and address    You are hereby notified that the

of the original   claimant has furnished or will

contractor are:   furnish labor, professional

      services, materials, machinery,

      fixtures or tools of the

      following general description:

The name and address of

any lender or reputed

lender and assigns are:

      In the construction, alteration or

      repair of the building, structure

      or improvement located at:

The name and address

of the person with

whom the claimant

has contracted are:     And situated on that certain

      lot(s) or parcel(s) of land in

      _____________ County, Arizona,

      described as follows:

      An estimate of the total price of

      the labor, professional services,

      materials, machinery, fixtures

      or tools furnished or to be

      furnished is: $_________________

(The following statement shall be in bold-faced type.)

Notice to Property Owner

If bills are not paid in full for the labor, professional services, materials, machinery, fixtures or tools furnished, or to be furnished, a mechanic's lien leading to the loss, through court foreclosure proceedings, of all or part of your property being improved may be placed against the property. You may wish to protect yourself against this consequence by either:

1. Requiring your contractor to furnish a conditional waiver and release pursuant to Arizona Revised Statutes section 33-1008, subsection D, paragraphs 1 and 3 signed by the person or firm giving you this notice before you make payment to your contractor.

2. Requiring your contractor to furnish an unconditional waiver and release pursuant to Arizona Revised Statutes section 33-1008, subsection D, paragraphs 2 and 4 signed by the person or firm giving you this notice after you make payment to your contractor.

3. Using any other method or device that is appropriate under the circumstances.

(The following language shall be in type at least as large as the largest type otherwise on the document.)

Within ten days after the receipt of this preliminary twenty day notice the owner or other interested party is required to furnish all information necessary to correct any inaccuracies in the notice pursuant to Arizona Revised Statutes section 33-992.01, subsection J or lose as a defense any inaccuracy of that information.

Within ten days after the receipt of this preliminary twenty day notice if any payment bond has been recorded in compliance with Arizona Revised Statutes section 33-1003, the owner must provide a copy of the payment bond, including the name and address of the surety company and bonding agent providing the payment bond to the person who has given the preliminary twenty day notice. In the event that the owner or other interested party fails to provide the bond information within that ten day period, the claimant shall retain lien rights to the extent precluded or prejudiced from asserting a claim against the bond as a result of not timely receiving the bond information.

Dated: ___________________   ___________________________

(Company name)

By: ______________________

(Signature)

 ______________________

 (Title)

(Acknowledgement of receipt language from Arizona Revised Statutes section 33-992.02 shall be inserted here.)

E. If labor, professional services, materials, machinery, fixtures or tools are furnished to a jobsite by a person who elects not to give a preliminary twenty day notice as provided in subsection B of this section, that person is not precluded from giving a preliminary twenty day notice not later than twenty days after furnishing other labor, professional services, materials, machinery, fixtures or tools to the same jobsite.  The person, however, is entitled to claim a lien only for such labor, professional services, materials, machinery, fixtures or tools furnished within twenty days before the service of the notice and at any time thereafter.

F. The notice or notices required by this section may be given by mailing the notice by first class mail sent with a certificate of mailing, registered or certified mail, postage prepaid in all cases, addressed to the person to whom notice is to be given at the person's residence or business address. Service is complete at the time of the deposit of notice in the mail.

G. A person required by this section to give notice to the owner, to an original contractor, to the construction lender, if any, and to the person with whom the claimant has contracted need give only one notice to the owner, to the original contractor, to the construction lender, if any, and to the person with whom the claimant has contracted with respect to all labor, professional services, materials, machinery, fixtures or tools furnished for the building, structure or improvement, unless the actual estimated total price for the labor, professional services, materials, machinery, fixtures or tools furnished or to be furnished exceeds by thirty percent or more the total price in any prior original or subsequent preliminary notice or unless the labor, professional services, materials, machinery, fixtures or tools are furnished under contracts with more than one subcontractor, in which case notice requirements shall be met for all additional labor, professional services, materials, machinery, fixtures or tools.

H. If a notice contains a general description required by subsection C of this section of the labor, professional services, materials, machinery, fixtures or tools furnished up to the date of notice, it is not defective because after the date the person giving notice furnishes labor, professional services, materials, machinery, fixtures or tools that are not within the scope of the general description, or exceed by less than thirty percent the estimated total price thereof.

I. A notice that is otherwise compliant with this section is not defective based on the failure to use bold-faced type as prescribed by this section or the failure to use type at least as large as the largest type otherwise on the document as prescribed by this section, or both.

J. Within ten days after receipt of a written request from any person or the person's agent intending to file a preliminary twenty day notice, which request shall identify the person, the person's address, the jobsite and the general nature of the person's labor, professional services, materials, machinery or tools to which the preliminary twenty day notice shall apply, or within ten days after the receipt of a preliminary twenty day notice, the owner or other interested party shall furnish the person a written statement containing the following information:

1. The legal description, subdivision plat, street address or location with respect to commonly known roads or other landmarks in the area, or any other description of the jobsite sufficient for identification.

2. The name and address of the owner or reputed owner.

3. The name and address of the original contractor or reputed contractor.

4. The name and address of the construction lender, if any, or reputed construction lender.

5. If any payment bond has been recorded pursuant to section 33-1003, a copy of the bond and the name and address of the surety company and bonding agent, if any, providing the payment bond.

K. Failure of the owner or other interested party to furnish the information required by this section does not excuse any claimant from timely giving a preliminary twenty day notice, but it does stop the owner from raising as a defense any inaccuracy of the information in a preliminary twenty day notice, provided the claimant's preliminary twenty day notice of lien otherwise complies with this chapter. If the information is received by the claimant after the claimant has given a preliminary twenty day notice and the information contained in the preliminary twenty day notice is inaccurate, the claimant shall, within thirty days after the receipt of this information, give an amended preliminary twenty day notice in the manner provided in this section. An amended preliminary twenty day notice is considered as having been given at the same time as the original preliminary twenty day notice, except that the amended preliminary twenty day notice is effective only as to work performed, materials supplied or professional services rendered twenty days before the date of the amended preliminary twenty day notice or the date the original preliminary twenty day notice was given to the owner, whichever occurs first. If a payment bond has been recorded in compliance with section 33-1003 and the owner or other interested party fails to furnish a copy of the bond and the other information as required by this section, the claimant shall retain lien rights to the extent precluded or prejudiced from asserting a claim against the bond as a direct result of not timely receiving a copy of the bond and the other information from the owner or other interested party.

The 20 cases that cite Ariz. Rev. Stat. § 33-992.01 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENDelmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
cites § 33-992.01 33×subsections: (C) 7× (J) 5× (B) 3× (C)(4) 2×cited by 42 cases
Where it cites § 33-992.01
“¶ 4 Delmastro sent VDG three preliminary twenty-day notices pursuant to A.R.S. § 33-992.01: one on January 17, 2008; another on June 24, 2008; and the last on October 16, 2008.”
The case’s holding
A showing that a recorded instrument is invalid constitutes evidence that the recorder had reason to know of its invalidity because all persons are presumed to know the law.
Later courts cite it for
“ordinarily, a showing that a recorded instrument is invalid is the best evidence that whoever recorded the instrument had reason to know it was invalid" because "all people of sound mind are presumed to know the law.” · 3 citing courts
2
GREENWang Elec., Inc. v. Smoke Tree Resort, LLC, 283 P.3d 45 (Ariz. Ct. App. 2012).
cites § 33-992.01 11×subsections: (B) 7× (A)(3) 2× (C) 2×cited by 50 cases
Where it cites § 33-992.01
“” A.R.S. § 33-992.01(A)(3). By serving REM’s managing member, Adobe Drywall properly served the “owner” against whose interests it later imposed a lien.”
The case’s holding
A property owner is not liable for unjust enrichment regarding tenant improvements unless the owner engaged in improper conduct.
Later courts cite it for
“unjust enrichment provides a remedy when a party has received a benefit at another's expense and, in good conscience, the benefitted party should compensate the other.” · 6 citing courts
3
GREENPerformance Funding, L.L.C. v. Arizona Pipe Trade Trust Funds, 49 P.3d 293 (Ariz. Ct. App. 2002).
cites § 33-992.01 19×subsections: (B) 8× (A)(4) 2×cited by 10 cases
Where it cites § 33-992.01
“The Trust Funds did not serve any person or entity with a preliminary twenty-day notice as set forth in A.R.S. § 33-992.01 (1992). ¶ 6 Faced with competing claims to the funds it owed to Industrial, Motorola declined to pay the funds to any party.”
4
GREENMLM Const. Co. v. Pace Corp., 836 P.2d 439 (Ariz. Ct. App. 1992).
cites § 33-992.01 34×subsections: (C)(5) 12× (B) 6×cited by 7 cases
Where it cites § 33-992.01
“MLM engaged a San Diego-based lien service to prepare and serve an Arizona preliminary twenty day notice pursuant to A.R.S. § 33-992.01. The lien service sent Pace a form entitled “Arizona Preliminary Notice in accordance with Arizona Revised Statutes § 33-992.”
5
GREENBrown Wholesale Elec. Co. v. Safeco Ins. Co. of Am., 659 P.2d 1299 (Ariz. Ct. App. 1982).
cites § 33-992.01 14×subsections: (B) 2× (C) 2×cited by 30 cases
Where it cites § 33-992.01
“§§ 33-981 — 1006, including the twenty-day notice provision found in A.R.S. § 33-992.01? SUFFICIENCY OF THE AFFIDAVITS Appellant cites three deficiencies in the affidavits in support of appellee’s motion which raise issues of material fact under A.”
The case’s holding
A materials supplier suing on a contractor's license bond need not satisfy the lien statute's preliminary twenty-day notice requirement.
6
GREENCemex Constr. Materials South, LLC v. Falcone Bros. & Assocs., 349 P.3d 210 (Ariz. Ct. App. 2015).
cites § 33-992.01 36×subsections: (F) 11× (D) 2× (E) 2× (G) 2×cited by 3 cases
Where it cites § 33-992.01
“Cemex, by contrast, claims that because this sentence contains the singular form (“[s]uch notice”), it applies only to ninety day notices; this, according to Cemex, leaves an “unfilled statutory gap,” which we should fill by applying the mailing provision found in A.”
7
GREENStratton v. Inspiration Consol. Copper Co., 683 P.2d 327 (Ariz. Ct. App. 1984).
cites § 33-992.01 8×subsections: (B) 2×cited by 43 cases
Where it cites § 33-992.01
“The trial court granted Inspiration’s motion for summary judgment finding that appellant failed to give a preliminary twenty-day notice upon Inspiration as required by A.R.S. § 33-992.01 and dismissed appellant’s complaint with prejudice.”
The case’s holding
A party lacks a claim for personal judgment sounding in breach of contract against an owner in the absence of privity of contract.
Later courts cite it for
“recover under the third party 19 beneficiary doctrine, the contract relied upon by the third party must reflect that the parties 20 thereto intended to recognize it as a primary party in interest.” · 2 citing courts
8
GREENPremier Physicians Grp., PLLC v. Navarro, 377 P.3d 988 (Ariz. 2016).
cites § 33-992.01 2×subsections: (E) 2×cited by 42 cases
Where it cites § 33-992.01
“” A.R.S. § 33-992.01(E). In other words, under the mechanic’s lien statute, the triggering event is service of the preliminary notice, whereas in the medical lien statute, the event is the provision of services (for non-hospital providers) or discharge (for hospitals).”
The case’s holding
A non-hospital health care provider must record its medical lien before or within thirty days after providing the first service to an injured patient.
Later courts cite it for
“when possible, we seek to harmonize statutory provisions and avoid interpretations that result in contradictory provisions.” · 10 citing courts
9
GREENAllstate Util. Constr., LLC v. Towne Bank, 263 P.3d 694 (Ariz. Ct. App. 2011).
cites § 33-992.01 19×subsections: (D) 5× (C)(2) 2× (C)cited by 2 cases
Where it cites § 33-992.01
“§ 33-993(A), a lien claimant must state under oath, inter alia, that it gave the preliminary 20-day notice required by A.R.S. § 33-992.01, and it must attach “the proof of mailing required by § 33-992.”
10
GREENWestburne Supply, Inc. v. Diversified Design & Constr., Inc., 826 P.2d 1224 (Ariz. Ct. App. 1992).
cites § 33-992.01 14×cited by 5 cases
Where it cites § 33-992.01
“§ 34-223(A) was amended to incorporate by reference various subsections of A.R.S. § 33-992.01 (the mechanics’ liens law).”
Later courts cite it for
“what a statute necessarily implies is as much a part of the statute as what it makes explicit.” · 1 citing court
11
GREENColumbia Grp., Inc. v. Jackson, 725 P.2d 1110 (Ariz. 1986).
cites § 33-992.01 7×subsections: (B) 4× (G) 3×cited by 14 cases
Where it cites § 33-992.01
“The three issues before us are: (1) whether preliminary notice of a material-men’s lien was properly addressed when mailed to the general contractor so as to preserve the materialmen’s lien right even though there was no evidence of actual receipt; (2) whether A.R.S. §…”
12
GREENStrategic Dev. & Constr., Inc. v. 7th & Roosevelt Partners, LLC, 226 P.3d 1046 (Ariz. Ct. App. 2010).
cites § 33-992.01 2×subsections: (B) 2×cited by 65 cases
Where it cites § 33-992.01
“01(C) (preliminary notice "shall be given not later than twenty days after the claimant has first furnished labor, professional services, materials, machinery, fixtures or tools to the jobsite .”
The case’s holding
A motion to dismiss for failure to state a claim need not be converted to a motion for summary judgment if it relies on documents central to the complaint or public records.
Later courts cite it for
“a rule 12(b)(6) motion that presents a document that is a matter of public record need not be treated as a motion for summary judgment.” · 2 citing courts
13
GREENFagerlie v. Markham Contracting Co., 258 P.3d 185 (Ariz. Ct. App. 2011).
cites § 33-992.01 6×subsections: (B) 2× (I)(2) 2× (J) 2×cited by 8 cases
Where it cites § 33-992.01
“Service of the Preliminary Twenty-Day Notice ¶ 20 The lot owners next argue that Markham could not serve EHV with the Preliminary Notice because EHV was neither the owner nor reputed owner when the notice was served. We disagree. ¶ 21 In order for a mechanic’s lien to be valid,…”
Later courts cite it for
“the law requires scienter on the part of the wrongdoer,” · 2 citing courts
14
GREENColumbia Grp., Inc. v. HOMEOWNERS ASS'N, 727 P.2d 352 (Ariz. Ct. App. 1986).
cites § 33-992.01 12×subsections: (A) 2× (A)(2) 2× (A)(3) 2×cited by 5 cases
Later courts cite it for
“the evidence fails to show any benefit they received for which they did not pay.” · 3 citing courts
15
GREENKAZ Constr., Inc. v. Newport Equity Partners, 275 P.3d 602 (Ariz. Ct. App. 2012).
cites § 33-992.01 8×subsections: (B) 3× (A)cited by 4 cases
Where it cites § 33-992.01
“In February 2008, KAZ sent Trust 1025 and Newport a preliminary twenty-day notice pursuant to A.R.S. § 33-992.01. No notice was given to the Strohbachs.”
16
GREENLamb Excavation, Inc. v. Chase Manhattan Mortg. Corp., 95 P.3d 542 (Ariz. Ct. App. 2004).
cites § 33-992.01 2×cited by 35 cases
Where it cites § 33-992.01
“Those four subcontractors subsequently served on CFB and the Torrejons preliminary twenty-day notices of mechanics’ and materialmen’s liens pursuant to A.R.S. § 33-992.01. In November 2000, the Torrejons obtained permanent financing from Chase to satisfy the CFB construction…”
The case’s holding
A subsequent lender is subrogated to the priority position of a primary lienholder when paying off a superior encumbrance if an implied agreement exists and no intervening lienholder is prejudiced.
Later courts cite it for
“we fail to comprehend the nature of the perceived prejudice or inequity, as it appears the lienholders would remain in the same position they occupied before subroga-tion____” · 3 citing courts
17
GREENCom. Cornice & Millwork, Inc. v. Camel Constr. Servs.. Corp., 739 P.2d 1351 (Ariz. Ct. App. 1987).
cites § 33-992.01 4×cited by 15 cases
Where it cites § 33-992.01
“Because of our resolution of this issue, we need not decide whether Subcontractor properly recorded and served the notice and claim of lien, or whether Subcontractor was required to comply with A.R.S. § 33-992.01 regarding the preliminary twenty day notice.”
Later courts cite it for
“to state a claim in contract the complaint must allege an agreement, the right to seek relief, and breach by the defendant.” · 1 citing court
18
GREENBonus Elec., Inc. v. Slosser, 687 P.2d 389 (Ariz. Ct. App. 1984).
cites § 33-992.01 8×subsections: (B) 2× (C) 2×cited by 5 cases
Where it cites § 33-992.01
“Must a sub-contractor who supplies both labor and materials to a construction project give the preliminary twenty day notice required by A.R.S. § 33-992.01 1 in order to perfect a lien on the construction property? This is the sole issue presented by this appeal.”
19
GREENSourcecorp, Inc. v. Norcutt, 274 P.3d 1204 (Ariz. 2012).
cites § 33-992.01 2×cited by 22 cases
Where it cites § 33-992.01
“After several subcontractors served preliminary notices of mechanics’ liens, see AR.S. § 33-992.01, the owners obtained permanent financing and satisfied the construction loan.”
The case’s holding
A person who fully performs a secured obligation is equitably subrogated to the mortgage to the extent necessary to prevent unjust enrichment and protect their interest in the property.
20
GREENMaricopa Turf, Inc. v. Sunmaster, Inc., 842 P.2d 1370 (Ariz. Ct. App. 1992).
cites § 33-992.01 11×subsections: (C) 5× (G) 4×cited by 3 cases
Where it cites § 33-992.01
“Subsection D of the Rule states: [A]ny person who has a contract with a subcontractor of the contractor, but no express or implied contract with the contractor furnishing the payment bond, has a right of action on the payment bond on giving the contractor, only, a written…”

Show all 40 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
198220032024

One bar per year. Tallest: 5 cases in 2012. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Ariz. Ct. App.35Ariz.5
By subsection
(A)3 cases
Columbia Grp., Inc. v. HOMEOWNERS ASS'N, 727 P.2d 352 (Ariz. Ct. App. 1986).
KAZ Constr., Inc. v. Newport Equity Partners, 275 P.3d 602 (Ariz. Ct. App. 2012).“In February 2008, KAZ sent Trust 1025 and Newport a preliminary twenty-day notice pursuant to A.R.S. § 33-992.01. No notice was given to the Strohbachs.”
Kaz Constr., Inc v. Sierra Cobre Estates, LLC, No. 2 CA-CV 2011-0108 (Ariz. Ct. App. Mar. 2, 2012).
(A)(2)1 case
Columbia Grp., Inc. v. HOMEOWNERS ASS'N, 727 P.2d 352 (Ariz. Ct. App. 1986).
(A)(3)2 cases
Wang Elec., Inc. v. Smoke Tree Resort, LLC, 283 P.3d 45 (Ariz. Ct. App. 2012).“” A.R.S. § 33-992.01(A)(3). By serving REM’s managing member, Adobe Drywall properly served the “owner” against whose interests it later imposed a lien.”
Columbia Grp., Inc. v. HOMEOWNERS ASS'N, 727 P.2d 352 (Ariz. Ct. App. 1986).
(A)(4)1 case
Performance Funding, L.L.C. v. Arizona Pipe Trade Trust Funds, 49 P.3d 293 (Ariz. Ct. App. 2002).“The Trust Funds did not serve any person or entity with a preliminary twenty-day notice as set forth in A.R.S. § 33-992.01 (1992). ¶ 6 Faced with competing claims to the funds it owed to Industrial, Motorola declined to pay the funds to any party.”
(B)17 cases
Wang Elec., Inc. v. Smoke Tree Resort, LLC, 283 P.3d 45 (Ariz. Ct. App. 2012).
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).“¶ 4 Delmastro sent VDG three preliminary twenty-day notices pursuant to A.R.S. § 33-992.01: one on January 17, 2008; another on June 24, 2008; and the last on October 16, 2008.”
Strategic Dev. & Constr., Inc. v. 7th & Roosevelt Partners, LLC, 226 P.3d 1046 (Ariz. Ct. App. 2010).“01(C) (preliminary notice "shall be given not later than twenty days after the claimant has first furnished labor, professional services, materials, machinery, fixtures or tools to the jobsite .”
Columbia Grp., Inc. v. Jackson, 725 P.2d 1110 (Ariz. 1986).“The three issues before us are: (1) whether preliminary notice of a material-men’s lien was properly addressed when mailed to the general contractor so as to preserve the materialmen’s lien right even though there was no evidence of actual receipt; (2) whether A.R.S. §…”
Showing the top 5 of 17. More in the list view →
(C)7 cases
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Wang Elec., Inc. v. Smoke Tree Resort, LLC, 283 P.3d 45 (Ariz. Ct. App. 2012).
Brown Wholesale Elec. Co. v. Safeco Ins. Co. of Am., 659 P.2d 1299 (Ariz. Ct. App. 1982).“§§ 33-981 — 1006, including the twenty-day notice provision found in A.R.S. § 33-992.01? SUFFICIENCY OF THE AFFIDAVITS Appellant cites three deficiencies in the affidavits in support of appellee’s motion which raise issues of material fact under A.”
Maricopa Turf, Inc. v. Sunmaster, Inc., 842 P.2d 1370 (Ariz. Ct. App. 1992).“Subsection D of the Rule states: [A]ny person who has a contract with a subcontractor of the contractor, but no express or implied contract with the contractor furnishing the payment bond, has a right of action on the payment bond on giving the contractor, only, a written…”
Bonus Elec., Inc. v. Slosser, 687 P.2d 389 (Ariz. Ct. App. 1984).“Must a sub-contractor who supplies both labor and materials to a construction project give the preliminary twenty day notice required by A.R.S. § 33-992.01 1 in order to perfect a lien on the construction property? This is the sole issue presented by this appeal.”
Showing the top 5 of 7. More in the list view →
(C)(1)4 cases
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Env't Liners, Inc. v. Ryley, Carlock & Applewhite, 930 P.2d 456 (Ariz. Ct. App. 1996).
Cemex Constr. Materials South, LLC v. Falcone Bros. & Assocs., 349 P.3d 210 (Ariz. Ct. App. 2015).“Cemex, by contrast, claims that because this sentence contains the singular form (“[s]uch notice”), it applies only to ninety day notices; this, according to Cemex, leaves an “unfilled statutory gap,” which we should fill by applying the mailing provision found in A.”
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(C)(2)1 case
Allstate Util. Constr., LLC v. Towne Bank, 263 P.3d 694 (Ariz. Ct. App. 2011).“§ 33-993(A), a lien claimant must state under oath, inter alia, that it gave the preliminary 20-day notice required by A.R.S. § 33-992.01, and it must attach “the proof of mailing required by § 33-992.”
(C)(4)2 cases
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(C)(5)2 cases
MLM Const. Co. v. Pace Corp., 836 P.2d 439 (Ariz. Ct. App. 1992).“MLM engaged a San Diego-based lien service to prepare and serve an Arizona preliminary twenty day notice pursuant to A.R.S. § 33-992.01. The lien service sent Pace a form entitled “Arizona Preliminary Notice in accordance with Arizona Revised Statutes § 33-992.”
(D)2 cases
Allstate Util. Constr., LLC v. Towne Bank, 263 P.3d 694 (Ariz. Ct. App. 2011).
(E)4 cases
Premier Physicians Grp., PLLC v. Navarro, 377 P.3d 988 (Ariz. 2016).“” A.R.S. § 33-992.01(E). In other words, under the mechanic’s lien statute, the triggering event is service of the preliminary notice, whereas in the medical lien statute, the event is the provision of services (for non-hospital providers) or discharge (for hospitals).”
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(F)2 cases
(G)4 cases
Columbia Grp., Inc. v. Jackson, 725 P.2d 1110 (Ariz. 1986).
Maricopa Turf, Inc. v. Sunmaster, Inc., 842 P.2d 1370 (Ariz. Ct. App. 1992).
Old Adobe Off. Props., Ltd. v. Gin, 727 P.2d 26 (Ariz. Ct. App. 1986).
(H)1 case
(I)1 case
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(I)(1)1 case
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(I)(2)3 cases
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Fagerlie v. Markham Contracting Co., 258 P.3d 185 (Ariz. Ct. App. 2011).“Service of the Preliminary Twenty-Day Notice ¶ 20 The lot owners next argue that Markham could not serve EHV with the Preliminary Notice because EHV was neither the owner nor reputed owner when the notice was served. We disagree. ¶ 21 In order for a mechanic’s lien to be valid,…”
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).
(J)3 cases
Delmastro & Eells v. Taco Bell Corp., 263 P.3d 683 (Ariz. Ct. App. 2011).
Fagerlie v. Markham Contracting Co., 258 P.3d 185 (Ariz. Ct. App. 2011).
Delmastro & Eells v. Taco Bell Corp., No. 2 CA-CV 2010-0188 (Ariz. Ct. App. Oct. 21, 2011).

Show all 40 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.