Actions against the state on highway and public works contracts. Arbitration

Edition and currency
laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). The text is the edition Syfert holds; for a past event, check the version in force on that date.
Other sources
CURRENTlaws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026) cited 1969–2024 52citing cases
At a glance

Courts have cited this section in 52 opinions since 1969, 4 of them in the last five years. The most litigated part is subsection (a) (2 cases).

(a) Any person, firm or corporation which has entered into a contract with the state, acting through any of its departments, commissions or other agencies, for the design, construction, construction management, repair or alteration of any highway, bridge, building or other public works of the state or any political subdivision of the state may, in the event of any disputed claims under such contract or claims arising out of the awarding of a contract by the Commissioner of Administrative Services, bring an action against the state to the superior court for the judicial district of Hartford for the purpose of having such claims determined, provided notice of each such claim under such contract and the factual bases for each such claim shall have been given in writing to the agency head of the department administering the contract within the period which commences with the execution of the contract or the authorized commencement of work on the contract project, whichever is earlier, and which ends two years after the acceptance of the work by the agency head evidenced by a certificate of acceptance issued to the contractor or two years after the termination of the contract, whichever is earlier. No action on a claim under such contract shall be brought except within the period which commences with the execution of the contract or the authorized commencement of work on the contract project, whichever is earlier, and which ends three years after the acceptance of the work by the agency head of the department administering the contract evidenced by a certificate of acceptance issued to the contractor or three years after the termination of the contract, whichever is earlier. Issuance of such certificate of acceptance shall not be a condition precedent to the commencement of any action. Acceptance of an amount offered as final payment shall not preclude any person, firm or corporation from bringing a claim under this section. Such action shall be tried to the court without a jury. All legal defenses except governmental immunity shall be reserved to the state. In no event shall interest be awarded under section 13a-96 and section 37-3a by a court or an arbitrator to the claimant for the same debt for the same period of time. Interest under section 37-3a shall not begin to accrue to a claimant under this section until at least thirty days after the claimant submits a bill or claim to the agency for the unpaid debt upon which such interest is to be based, along with appropriate documentation of the debt when applicable. Any action brought under this subsection shall be privileged in respect to assignment for trial upon motion of either party.

(b) As an alternative to the procedure provided in subsection (a) of this section, any such person, firm or corporation having a claim under said subsection (a) may submit a demand for arbitration of such claim or claims for determination under (1) the rules of any dispute resolution entity, approved by such person, firm or corporation and the agency head and (2) the provisions of subsections (b) to (e), inclusive, of this section, except that if the parties cannot agree upon a dispute resolution entity, the rules of the American Arbitration Association and the provisions of said subsections shall apply. The provisions of this subsection shall not apply to claims under a contract unless notice of each such claim and the factual bases of each claim has been given in writing to the agency head of the department administering the contract within the time period which commences with the execution of the contract or the authorized commencement of work on the contract project, whichever is earlier, and which ends two years after the acceptance of the work by the agency head evidenced by a certificate of acceptance issued to the contractor or two years after the termination of the contract, whichever is earlier. A demand for arbitration of any such claim shall include the amount of damages and the alleged facts and contractual or statutory provisions which form the basis of the claim. No action on a claim under such contract shall be brought under this subsection except within the period which commences with the execution of the contract or the authorized commencement of work on the contract project, whichever is earlier, and which ends three years after the acceptance of the work by the agency head of the department administering the contract evidenced by a certificate of acceptance issued to the contractor or three years after the termination of the contract, whichever is earlier. Issuance of such certificate of acceptance shall not be a condition precedent to the commencement of any action.

(c) Once a notice of claim is given to the agency head as required by subsection (b) of this section, each party shall allow the other to examine and copy any nonprivileged documents which may be relevant either to the claimant's claims or to the state's defenses to such claims. Requests to examine and copy documents which have been prepared by the contractor in order to submit a bid shall be subject to a claim of privilege and grounds for an application to any court or judge pursuant to section 52-415 for a decision on whether such documents constitute trade secrets or other confidential research, development or commercial information and whether such documents shall not be disclosed to the state or shall be disclosed to the state only in a designated way. Any such documents for which no decision is sought or privilege obtained shall not be subject to disclosure under section 1-210 and shall not be disclosed by the agency to any person or agency that is not a party to the arbitration. Such documents shall be used only for settlement or litigation of the parties' claims. The arbitrators shall determine any issue of relevance of such documents after an in camera inspection. The arbitrators shall seal such documents during arbitration and shall return such documents to the claimant after final disposition of the claim.

(d) Hearings shall be scheduled for arbitration in a manner that shall ensure that each party shall have reasonable time and opportunity to prepare and present its case, taking into consideration the size and complexity of the claims presented. Unless the parties agree otherwise, no evidentiary hearing on the merits of the claim may be held less than six months after the demand for arbitration is filed with the dispute resolution entity.

(e) The arbitrators shall conduct the hearing and shall hear evidence as to the facts, and arguments as to the interpretation and application of contractual provisions. After the hearing, the arbitrators shall issue in writing: (1) Findings of fact, (2) a decision in which the arbitrators interpret the contract and apply it to the facts found and (3) an award. The arbitrators' findings of fact and decision shall be final and conclusive and not subject to review by any forum, tribunal, court or government agency, for errors of fact or law. Awards shall be final and binding and subject to confirmation, modification or vacation pursuant to chapter 909.

(f) Claims brought pursuant to this section may be submitted for mediation under the mediation rules of such dispute resolution entity as the parties may agree upon.

(g) This section shall apply to claims brought on or after July 1, 1991. The provisions of sections 4-61, 4b-97, 13b-57a, 13b-57b and 13b-57c of the general statutes, revised to January 1, 1991, shall apply to claims brought before July 1, 1991.

(1957, P.A. 229; 1961, P.A. 555; 1969, P.A. 429; 768, S. 60; 1971, P.A. 112; P.A. 80-483, S. 158, 186; P.A. 85-113, S. 1, 2; P.A. 86-253; P.A. 88-230, S. 1, 12; P.A. 90-95, S. 1; 90-98, S. 1, 2; P.A. 91-284, S. 1, 4; P.A. 92-228, S. 8; P.A. 93-142, S. 4, 7, 8; P.A. 95-220, S. 4–6; P.A. 11-51, S. 90; P.A. 13-247, S. 200.)

History: 1961 act expanded section to include all public works, added notice provision, limitation provision and provision allowing claim after acceptance of amount offered as final payment and deleted provision precluding inclusion of interest or costs in judgment against state; 1969 acts replaced specific reference to highway and public works departments with reference to any department, commission or agency, included design contracts under provisions of section and provided for privileged actions upon motion of either party–P.A. 768 calling for change of state highway department to commissioner of transportation was disregarded; 1971 act replaced references to “acceptance of contract” with references to “acceptance of work” done by contract and supported by certificate of acceptance issued by agency head to contractor, thus clarifying section; P.A. 80-483 replaced “Hartford county” with “judicial district of Hartford-New Britain”; P.A. 85-113 added reference to construction management; P.A. 86-253 amended Subsec. (a) to extend applicability to any highway, bridge, building or other public works of “any political subdivision of the state” and added Subsec. (b) providing for arbitration of disputes; P.A. 88-230 replaced “judicial district of Hartford-New Britain” with “judicial district of Hartford”, effective September 1, 1991; P.A. 90-95 expanded section by allowing contract disputes to be settled by any dispute resolution entity not solely by the American Arbitration Association and added requirement that notice include amount of damages and alleged facts forming basis of claim; P.A. 90-98 changed the effective date of P.A. 88-230 from September 1, 1991, to September 1, 1993; P.A. 91-284 amended Subsec. (a) to authorize action against state in superior court for claims arising out of awarding of contract by commissioner of public works, require as prerequisite to bringing any action against state in superior court under Subsec. (a) that the “factual bases” for claims be given to “agency head” of department administering contract, prohibit awarding of interest under Secs. 13a-96 and 37-3a to claimant for same debt for same period and prohibit accrual of interest until at least 30 days after claimant submits bill or claim for unpaid debt, amended Subsec. (b) by substituting “agency head” for “commissioner of transportation” in Subdiv. (1), adding Subdiv. (2), making changes for consistency with Subsec. (a) and requiring that a demand for arbitration include “contractual or statutory provisions” which form basis of claim, and added Subsecs. (c) to (g), inclusive, re examination and copying of documents, arbitration procedure, mediation and the application of this section; P.A. 92-228 amended Subsecs. (a) and (b) to change the time period within which notice of a claim shall be given and action on a claim shall be brought; P.A. 93-142 changed the effective date of P.A. 88-230 from September 1, 1993, to September 1, 1996, effective June 14, 1993; P.A. 95-220 changed the effective date of P.A. 88-230 from September 1, 1996, to September 1, 1998, effective July 1, 1995; pursuant to P.A. 11-51, “Commissioner of Public Works” was changed editorially by the Revisors to “Commissioner of Construction Services” in Subsec. (a), effective July 1, 2011; pursuant to P.A. 13-247, “Commissioner of Construction Services” was changed editorially by the Revisors to “Commissioner of Administrative Services” in Subsec. (a), effective July 1, 2013.

Cited. 169 C. 253; 170 C. 434. Does not operate to waive immunity from suits based on type of contract in question; remedy lies with claims commissioner. 178 C. 352. Contract involved essentially the purchase of laundry equipment and work required to install the equipment was not sufficient for the contract to qualify under statute. 190 C. 212. Contracts for construction of city streets and a city bridge do not come within provisions of statute. 198 C. 185. Cited. 217 C. 281; 239 C. 93. Claim is barred unless it arises directly “under” contract, as opposed to “related to”, “connected with” or “derived from”. 250 C. 553. The waiver of sovereign immunity contained in section requires all existing disputed claims arising under a public works contract to be litigated or arbitrated in a single action. 287 C. 1. Defendant state agency expressly agreed to arbitration proceedings under section and therefore waived judicial review of the issue of arbitrability. 294 C. 695. Limited waiver of government immunity from suit does not abrogate doctrine of nullum tempus, i.e. no time runs against the king. 307 C. 412. Notice and demand re arbitration of liquidated damages claim was sufficient where it alerted department to the general nature of that claim, which is all that section requires. 319 C. 582.

Cited. 28 CA 175; 29 CA 292. Arbitration proceeding under section is not an action under Sec. 52-592. 87 CA 367. Since the stated basis of the unjust enrichment claim was that plaintiff performed services and provided materials that were not contemplated by the contract itself, the claim does not fall directly under the contract as required by the statute and therefore sovereign immunity bars the claim. 130 CA 211. Department explicitly contested arbitrability of matter and thereby did not waive judicial review of arbitrator's decision re arbitrability of claim; arbitration panel exceeded its authority by rendering award on a claim that was defined by a statutory waiver of sovereign immunity rather than by a contractual agreement. 141 CA 738; judgment reversed, see 319 C. 582.

Parties may agree to arbitrate as alternative to proceeding by suit. 28 CS 173. Action for breach of contract for highway design made in 1966 cannot be maintained as amendment extending section to design contracts was passed in 1969. 31 CS 313. Cited. 37 CS 50.

Subsec. (a):

Cited. 211 C. 370; 221 C. 346. Notice under Subsec. does not require explicit statement of intent to bring an action, but only factually adequate written notice by a contractor to a department head asserting a right to payment of money believed to be owed, and plaintiff's letter constituted sufficient notice of claim. 299 C. 167.

Subsec. (e):

Because statute governs form of an arbitrator's findings, decision and award and contains no well-defined, explicit or clear requirement that arbitration award be consistent with findings of fact, plaintiff could not establish the elements necessary to vacate arbitration award on the ground that arbitration panel manifestly disregarded the law. 273 C. 746.

The 20 cases that cite Conn. Gen. Stat. § 4-61 most heavily, weighted by court and treatment. RelevanceNewestTreatment
1
GREENBacon Constr. Co. v. Dep't of Pub. Works, 987 A.2d 348 (Conn. 2010).
cites § 4-61 46×cited by 37 cases
Where it cites § 4-61
“2 General Statutes § 4-61 waives the state’s sovereign immunity with respect to certain claims arising under public works contracts and provides in relevant part: “(a) Any person, firm or corporation which has entered into a contract with the state, acting through any of its…”
The case’s holding
A party waives the right to de novo judicial review of an arbitrator's decision on arbitrability by expressly agreeing to submit that issue to the arbitrator for final determination.
2
GREENDep't of Transp. v. White Oak Corp., 946 A.2d 1219 (Conn. 2008).
cites § 4-61 56×cited by 19 cases
Where it cites § 4-61
“The principal issue in this appeal is whether General Statutes § 4-61, 1 which waives the state’s sovereign immunity with respect to certain *3 claims arising under public works contracts, permits a general contractor to commence a second arbitration against the state to pursue…”
The case’s holding
Sovereign immunity waiver for public works contract claims permits only a single action or arbitration in which all existing disputed claims must be resolved.
3
GREENFed. Deposit Ins. v. Peabody, N.E., Inc., 680 A.2d 1321 (Conn. 1996).
cites § 4-61 30×cited by 203 cases
Where it cites § 4-61
“The trial court concluded that the waiver of the state’s sovereign immunity contained in General Statutes § 4-61 (a) 2 for *96 parties contracting directly with the state was intended also to waive the state’s sovereign immunity to allow third party actions by a general…”
The case’s holding
A contractor cannot implead the state for indemnification based on a subcontractor's claim unless the contractor admits liability and possesses an existing disputed claim under its own contract.
Later courts cite it for
“inappropriate for the trial court to consider third party plaintiffs' amended third party complaint, rather than its initial complaint, when acting on the third party defendant's motion to dismiss for lack of subject matter jurisdiction” · 2 citing courts
4
REDDep't of Transp. v. White Oak Corp., 62 A.3d 599 (Conn. App. Ct. 2013).
cites § 4-61 80×subsections: (b)cited by 5 cases
Reversed by Dept. of Transportation v. White Oak Corp. (2015): the Supreme Court of Connecticut's own opinion in this case.
Where it cites § 4-61
“This appeal concerns the proper scope of an arbitration proceeding commenced under the narrow confines of General Statutes § 4-61. The plaintiff, the department of transportation (department), appeals from the judgment of the trial court denying its application to vacate,…”
5
GREENWhite Oak Corp. v. Dep't of Transp., 585 A.2d 1199 (Conn. 1991).
cites § 4-61 24×cited by 38 cases
Where it cites § 4-61
“On October 18,1983, 1 White Oak brought suit under General Statutes § 4-61, 2 claim *284 ing, inter alia, payments allegedly due on the contract with DOT and damages incurred by the plaintiff when DOT allegedly delayed the project’s completion.”
The case’s holding
A state waives sovereign immunity for prejudgment interest when a statute authorizing a suit against the state provides for the recovery of interest.
6
GREENPeabody N.E., Inc. v. Dep't of Transp., 735 A.2d 782 (Conn. 1999).
cites § 4-61 22×cited by 39 cases
Where it cites § 4-61
“to 1991) § 4-61 (a) 3 constitutes an abrogation of eleventh amendment immunity for purposes of suit in state court, it does not do so for purposes of suit in federal court.”
The case’s holding
The term original action in the saving statute refers to the first action filed by a plaintiff within the applicable statute of limitations.
Later courts cite it for
“comport with the plain and ordinary meaning of the word as it is used in common parlance.” · 3 citing courts
7
GREENDep't of Pub. Works v. Ecap Constr. Co., 737 A.2d 398 (Conn. 1999).
cites § 4-61 29×cited by 19 cases
Where it cites § 4-61
“The dispositive issue raised by this appeal is whether, under General Statutes § 4-61, 1 a *555 contractor who claims that the state has breached a public works contract may compel the state to arbitrate a dispute over the state’s alleged agreement to settle the contractor’s…”
Later courts cite it for
“broad public policy considerations favor pretrial resolution of disputes between contracting parties” · 1 citing court
8
GREENSagamore Grp., Inc. v. Comm'r of Transp., 614 A.2d 1255 (Conn. App. Ct. 1992).
cites § 4-61 21×cited by 32 cases
Where it cites § 4-61
“to present expert testimony at the hearing on the defendant’s motion to dismiss, (2) determined that the contract between the plaintiff and the defendant did not provide for “construction management” services for purposes of Gen *294 eral Statutes § 4-61 (a) and thus that there…”
The case’s holding
A motion to dismiss may raise issues of fact that require a hearing to determine the underlying facts.
Later courts cite it for
“there is no single, widely accepted definition of construction management,” · 3 citing courts
9
GREENAm. Laundry Mach., Inc. v. State, 459 A.2d 1031 (Conn. 1983).
cites § 4-61 9×cited by 91 cases
Where it cites § 4-61
“The plaintiff has appealed from that judgment, claiming that the contract relied upon in the complaint was “for the design, construction, repair or alteration” of a state building upon which suit against the state is authorized by General Statutes § 4-61. 1 After reviewing the…”
The case’s holding
Incidental installation work does not transform a contract for the purchase of personal property into a contract for the repair or alteration of a state building.
Later courts cite it for
“does not seek to introduce facts outside of the record . . . and admits all well pleaded facts, the complaint being construed most favorably to the plaintiff.” · 21 citing courts
10
GREENParagon Constr. Co. v. Dep't of Pub. Works, 23 A.3d 732 (Conn. App. Ct. 2011).
cites § 4-61 30×cited by 4 cases
Where it cites § 4-61
“Specifically, the defendants claimed that the doctrine of sovereign immunity barred the breach of contract claim because the plaintiff failed to allege a “ ‘disputed claim’ ” under a contract with the state, as required by the statutory waiver of immunity provided in General…”
11
NEUTRALC. R. Klewin Ne., LLC v. State, 9 A.3d 326 (Conn. 2010).
cites § 4-61 47×cited by 16 cases
Where it cites § 4-61
“1 General Statutes § 4-61 (a) provides: “Any person, firm or corporation which has entered into a contract with the state, acting through any of its departments, commissions or other agencies, for the design, construction, construction management, repair or alteration of any…”
12
GREENColumbia Air Servs., Inc. v. Dep't of Transp., 977 A.2d 636 (Conn. 2009).
cites § 4-61 5×cited by 66 cases
Where it cites § 4-61
“In its brief filed in this court, the plaintiff acknowledges that General Statutes § 4-61 (a) 4 is the sole Connecticut statute that expressly waives sovereign immunity for an action arising out of a contract with the state.”
The case’s holding
A plaintiff may not bring an action against the state for monetary damages without a statutory waiver of sovereign immunity or authorization from the claims commissioner.
Later courts cite it for
“in the absence of a statutory waiver of sovereign immunity, the plaintiff may not bring an action against the state for monetary damages without authorization from the claims commissioner to do so.” · 9 citing courts
13
cites § 4-61 16×cited by 7 cases
Where it cites § 4-61
“The plaintiff claims on appeal that the trial court improperly denied its application to vacate the arbitration award because the arbitrators’ failure to award the full amount of damages requested was inconsistent with their findings of fact in manifest disregard of General…”
Later courts cite it for
“it is undisputed that the plaintiffs submission to arbitration was unrestricted” · 1 citing court
14
GREENSmith v. Fussenich, 440 F. Supp. 1077 (D. Conn. 1977).
cites § 4-61 11×cited by 26 cases
Where it cites § 4-61
“Finally, the irrationality of the enactment becomes most pronounced when it is compared with another Connecticut statute, Conn.Gen.Stat. § 4-61 o which prohibits state agencies (other than law enforcement departments) from rejecting applications for licenses "solely because of a…”
15
GREEN184 Windsor Avenue, LLC. v. State, 875 A.2d 498 (Conn. 2005).
cites § 4-61 8×cited by 20 cases
Where it cites § 4-61
“Finally, General Statutes § 4-61 (a) 9 provides in relevant part that “[a]ny person, firm or corporation which has entered into a contract with the state .”
The case’s holding
Statutory waivers of sovereign immunity are strictly construed and do not permit contract claims against the state unless expressly authorized by the legislature.
16
GREENWalter Kidde Constructors, Inc. v. State, 434 A.2d 962 (Conn. Super. Ct. 1981).
cites § 4-61 12×cited by 19 cases
Where it cites § 4-61
“By way of special defenses the state pleaded a defense of sovereign immunity to the quantum meruit count and the counts regarding the claims of the 8 named subcontractors on the grounds that they were not “disputed claims” under the contract and hence not proper claims for…”
17
GREENArute Bros. v. Dep't of Transp., 865 A.2d 464 (Conn. App. Ct. 2005).
cites § 4-61 16×cited by 5 cases
Where it cites § 4-61
“The question presented in this appeal is whether an arbitration conducted pursuant to General Statutes § 4-61 is an action to which General Statutes § 52-592, the accidental failure of suit statute, applies.”
18
GREENRivers v. City of New Britain, 950 A.2d 1247 (Conn. 2008).
cites § 4-61 4×subsections: (a) 2×cited by 48 cases
Where it cites § 4-61
“, General Statutes § 4-61 (a) (authorizing those who have entered into highway or public works contract with state to “bring an action against the state”); General Statutes § 5-141d (a) (requiring state to indemnify state officers or employees for financial losses resulting from…”
The case’s holding
Courts may interpret a statute's plain language to avoid an unworkable result that fails to achieve the obvious public safety purpose of the law.
Later courts cite it for
“when the legislature intends to waive immunity from suit or liability, it expresses that intent by using explicit statutory language.” · 3 citing courts
19
GREENC. R. Klewin Ne., LLC v. Fleming, 932 A.2d 1053 (Conn. 2007).
cites § 4-61 4×cited by 32 cases
Where it cites § 4-61
“Following this decision, the defendants filed a motion to strike the complaint, contending that the plaintiffs application for a writ of mandamus was improper because other adequate remedies at law exist, 2 namely, an application to the claims commissioner under General Statutes…”
The case’s holding
Statutory authorization for a governor to settle a claim does not create a mandatory duty to pay, meaning sovereign immunity bars a writ of mandamus to compel payment.
Later courts cite it for
“the principle that the state cannot be sued without its consent, or sovereign immunity, is well established under our case law.” · 2 citing courts
20
GREENNaek Constr. Co. v. Wilcox Excavating Constr. Co., 726 A.2d 653 (Conn. App. Ct. 1999).
cites § 4-61 15×cited by 7 cases
Where it cites § 4-61
“5 The trial court, however, in ruling that the award conformed with the submission, determined that the original or a copy of the executed prime contract was not in evidence before the arbitrator and that the plaintiff failed to prove that the award did not comply with General…”

Show all 52 citing cases (list view) →

The flag is Syfertize’s treatment of the citing case itself, not of the statute. “Where it cites” is the passage in the opinion; the holding is a summary of the whole case and may concern another point. Annotations are extracted automatically from the opinions in the Syfert caselaw corpus.

Citing cases by year
196919962024

One bar per year. Tallest: 4 cases in 2015. These are opinions in the Syfert collection, which holds more of some courts’ recent opinions than their older ones, so a rise can reflect what the collection holds and not more litigation.

By court
Conn.33Conn. App. Ct.10Conn. Super. Ct.7D. Conn.1Tex.1
By subsection
(a)2 cases
Rivers v. City of New Britain, 950 A.2d 1247 (Conn. 2008).“, General Statutes § 4-61 (a) (authorizing those who have entered into highway or public works contract with state to “bring an action against the state”); General Statutes § 5-141d (a) (requiring state to indemnify state officers or employees for financial losses resulting from…”
Ballou v. Law Offices Howard Lee Schiff, 39 A.3d 1075 (Conn. 2012).
(b)1 case
Dep't of Transp. v. White Oak Corp., 62 A.3d 599 (Conn. App. Ct. 2013).“This appeal concerns the proper scope of an arbitration proceeding commenced under the narrow confines of General Statutes § 4-61. The plaintiff, the department of transportation (department), appeals from the judgment of the trial court denying its application to vacate,…”

Show all 52 citing cases (list view) →

Enactment and amendments

Syfert holds no separate history line for this section. Where this code prints a source or history note, it appears with the text, usually at the end.

Versions

Edition shown: laws through the 2024 session: the source has not yet published 2025 Public Acts (checked Sept. 2026). Syfert holds no earlier or later version of this section.